Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Medford, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 128ft / 39.4mTotal length
  • $60,840,000Total costs
  • 465,487Total average daily traffic
  • 20,504Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Medford
  • No street view available for this location

New bridges in Medford, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11940-1949
  • 21960-1969
  • 61970-1979
  • 41990-1999
  • 12020-2022
Average Bridge Daily Traffic in Medford, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 14.3%Very good
  • 57.1%Good
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Very good
  • 28.6%Good
  • 28.6%Satisfactory
Find on map >>   Show street view

Structure Number: 1064109,  Location: 1.3 MI W JCT RTS 495+112 (Lat: 40.823311,  Lng: -73.020150),  Route carried "on" structure: Other road ,  Year Built: 1968,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 39,395 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 45,453 (year 2040),  Design Load: H 20,  Features Intersected: 495I495I07031226, RTE I4,  Facility Carried by Structure: NORTH OCEAN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.084,  Lanes on structure: 7,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 27.9m (91.5ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $8,384,000,  Roadway Improvement Cost: $4,910,000,  Total Project Cost: $13,293,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1064111,  Location: .9 MI W JCT I495 & SH112 (Lat: 40.823731,  Lng: -73.013256),  Route carried "on" structure: Interstate 495,  Year Built: 1998,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 38,189 (year 1998),  Truck Traffic: 13%,  Design Load: HS 25 or greater,  Features Intersected: OLD MEDFORD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.071,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,967,000,  Roadway Improvement Cost: $1,738,000,  Total Project Cost: $4,705,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1064112,  Location: .9 MI W JCT I495 & SH 112 (Lat: 40.823503,  Lng: -73.013233),  Route carried "on" structure: Interstate 495,  Year Built: 1998,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 51,825 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,415 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OLD MEDFORD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.071,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,942,000,  Roadway Improvement Cost: $1,723,000,  Total Project Cost: $4,665,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1064121,  Location: JCT RTS 112+495 (Lat: 40.823919,  Lng: -72.996619),  Route carried "on" structure: Interstate 495,  Year Built: 1970,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 38,189 (year 2001),  Truck Traffic: 13%,  Design Load: H 20,  Features Intersected: RTE 112
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.455,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,676,000,  Roadway Improvement Cost: $1,567,000,  Total Project Cost: $4,243,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1064122,  Location: JCT RTS 112+495 (Lat: 40.823653,  Lng: -72.996594),  Route carried "on" structure: Interstate 495,  Year Built: 1970,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 51,825 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,415 (year 2040),  Design Load: H 20,  Features Intersected: RTE 112
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.423,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,645,000,  Roadway Improvement Cost: $1,549,000,  Total Project Cost: $4,193,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1064139,  Location: 1.1 MI E RTS 112+495 (Lat: 40.822322,  Lng: -72.975306),  Route carried "on" structure: County highway ,  Year Built: 1970,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 12.95m (42.49ft),  Average Daily Traffic: 17,987 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,850 (year 2040),  Design Load: H 20,  Features Intersected: 495I495I07041250, W/B, R,  Facility Carried by Structure: HORSE BLOCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.825,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.95m (42.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $11,375,000,  Roadway Improvement Cost: $6,661,000,  Total Project Cost: $18,036,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33008,  Location: 1.5 MI EAST OF MEDFORD (Lat: 40.819925,  Lng: -72.969372),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 20,943 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,441 (year 2040),  Design Load: HL 93,  Features Intersected: Long Island RR, LONG ISL,  Facility Carried by Structure: Horse Block Rd-CR1
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 19.388,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 25 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $7,382,000,  Roadway Improvement Cost: $4,323,000,  Total Project Cost: $11,705,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1064109,  Location: 1.3 MI W JCT RTS 495+112 (Lat: 40.823311,  Lng: -73.020150),  Route carried "under" structure: Interstate 495,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 72,500 (year 1973),  Features Intersected: 495I495I07031226, RTE I4,  Facility Carried by Structure: NORTH OCEAN AVE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 36.605,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 1064111,  Location: .9 MI W JCT I495 & SH112 (Lat: 40.823731,  Lng: -73.013256),  Route carried "under" structure: Other road ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 2021),  Features Intersected: OLD MEDFORD AVE,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 1064112,  Location: .9 MI W JCT I495 & SH 112 (Lat: 40.823503,  Lng: -73.013233),  Route carried "under" structure: Other road ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 2021),  Features Intersected: OLD MEDFORD AVE,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 1064121,  Location: JCT RTS 112+495 (Lat: 40.823919,  Lng: -72.996619),  Route carried "under" structure: State highway 112,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 29,763 (year 2002),  Features Intersected: RTE 112,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 6.581,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 1064122,  Location: JCT RTS 112+495 (Lat: 40.823653,  Lng: -72.996594),  Route carried "under" structure: State highway 112,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 29,763 (year 2002),  Features Intersected: RTE 112,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 6.581,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 1064139,  Location: 1.1 MI E RTS 112+495 (Lat: 40.822322,  Lng: -72.975306),  Route carried "under" structure: Interstate 495,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 1979),  Features Intersected: 495I495I07041250, W/B, R,  Facility Carried by Structure: HORSE BLOCK ROAD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 40.338,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 703703,  Location: .5MI S JCT RTS 112+495 (Lat: 40.817308,  Lng: -72.999864),  Route carried "under" structure: State highway 112,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 28,308 (year 2002),  Features Intersected: RTE 112,  Facility Carried by Structure: LONG ISLAND RR
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 5.825,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 17.0m (55.8ft)

Find on map >>   Show street view

Structure Number: 770926,  Location: 1.0 MI WEST OF MEDFORD (Lat: 40.816217,  Lng: -73.012417),  Route carried "under" structure: Other road ,  Year Built: 1906,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1974),  Features Intersected: MEDFORD AVE,  Facility Carried by Structure: LIRR MAIN LINE
Minimum Vertical Clearance: 3.09m (10.14ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.0m (32.8ft)

Discuss Medford, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.