National Bridge Inventory (NBI) Statistics
Number of bridges: 12
Total length: 49 meters (161ft)
Total costs: $3,578,000
Total average daily traffic: 86,760
Total average daily truck traffic: 5,815
National Bridge Inventory (NBI) Registered Bridges for Montevideo

New bridges - Historical Statistics

  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 8
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 7017,  Location: IN MONTEVIDEO (Lat: 44.948081,  Lng: -95.730078),  Route carried "on" structure: County highway 15,  Year Built: 1955,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.62m (15.16ft),  Average Daily Traffic: 5,300 (year 2004),  Design Load: HS 15,  Features Intersected: CHIPPEWA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 87021,  Location: 0.3 MI SW OF JCT TH 29 (Lat: 44.932983,  Lng: -95.733269),  Route carried "on" structure: US 212,  Year Built: 1983,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 6,400 (year 2004),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: MINNESOTA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2007,  Underwater Inspection Date: May 2004,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 9111,  Location: IN MONTEVIDEO (Lat: 44.943625,  Lng: -95.728417),  Route carried "on" structure: State highway 29,  Year Built: 1959,  Status: Open,  Structure Length: 4.31m (14.14ft),  Average Daily Traffic: 43,000 (year 2004),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: TC&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.0m (52.5ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $732,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $192,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 9112,  Location: 1.0 MI N OF JCT TH212 (Lat: 44.950819,  Lng: -95.725350),  Route carried "on" structure: City street 103,  Year Built: 1959,  Status: Open,  Structure Length: 4.23m (13.88ft),  Average Daily Traffic: 3,050 (year 2004),  Design Load: HS 20,  Features Intersected: TH 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $919,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 9113,  Location: 1.2 MI N OF JCT TH212 (Lat: 44.951378,  Lng: -95.722794),  Route carried "on" structure: City street 105,  Year Built: 1959,  Status: Open,  Structure Length: 4.26m (13.98ft),  Average Daily Traffic: 1,800 (year 2004),  Design Load: HS 20,  Features Intersected: TH 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $792,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,012,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 9114,  Location: 0.1 MI NW OF JCT TH 59 (Lat: 44.940494,  Lng: -95.731006),  Route carried "on" structure: State highway 7,  Year Built: 1932,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 1,850 (year 2004),  Truck Traffic: 12%,  Design Load: HS 20,  Features Intersected: CHIPPEWA RIVER
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 39.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Critical Feature Inspection Date: August 2007,  Bridge Improvement Cost: $793,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $730,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: 9287,  Location: 1.0 MI N OF JCT TH212 (Lat: 44.950431,  Lng: -95.726372),  Route carried "on" structure: State highway 29,  Year Built: 1959,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 8,300 (year 2004),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: CITY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $809,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $636,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>

Structure Number: L8849,  Location: LAGOON PARK IN MONTEVIDE (Lat: 44.951019,  Lng: -95.727097),  Route carried "on" structure: City street 99,  Year Built: 1938,  Status: Open,  Structure Length: 0.58m (1.90ft),  Average Daily Traffic: 40 (year 1986),  Features Intersected: CHIPPEWA RIVER BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.1m (13.5ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $40,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: L885,  Location: LAGOON PARK IN MONTEVIDE (Lat: 44.951856,  Lng: -95.728397),  Route carried "on" structure: City street 99,  Year Built: 1938,  Status: Open,  Structure Length: 0.58m (1.90ft),  Average Daily Traffic: 20 (year 1986),  Features Intersected: CHIPPEWA RIVER BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.1m (13.5ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $49,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9112,  Location: 1.0 MI N OF JCT TH212 (Lat: 44.950819,  Lng: -95.725350),  Route carried "under" structure: State highway 29,  Year Built: 1959,  Structure Length: 4.23m (13.88ft),  Average Daily Traffic: 8,300 (year 2004),  Truck Traffic: 11%,  Features Intersected: TH 29,  Facility Carried by Structure: 1st ST (MSAS 103)
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>

Structure Number: 9113,  Location: 1.2 MI N OF JCT TH212 (Lat: 44.951378,  Lng: -95.722794),  Route carried "under" structure: State highway 29,  Year Built: 1959,  Structure Length: 4.26m (13.98ft),  Average Daily Traffic: 8,300 (year 2004),  Truck Traffic: 11%,  Features Intersected: TH 29,  Facility Carried by Structure: 3rd ST (MSAS 105)
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>

Structure Number: 9287,  Location: 1.0 MI N OF JCT TH212 (Lat: 44.950431,  Lng: -95.726372),  Route carried "under" structure: City street 16,  Year Built: 1959,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 400 (year 1973),  Features Intersected: CITY ST,  Facility Carried by Structure: TH 29
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Discuss this city on our hugely popular Minnesota forum

Back to: Montevideo, MN, Minnesota, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.