![]() |
Bridge Statistics for Mountlake Terrace, Washington (WA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Mountlake Terrace, WA, Washington, Washington forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 119 meters (390ft) Total costs: $1,638,000 Total average daily traffic: 818,022 Total average daily truck traffic: 93,801 National Bridge Inventory (NBI) Registered Bridges for Mountlake Terrace
Bridge Condition - Deck Bridge Condition - Substructure Find on map >>
Structure Number: 7071D, Location: 0.7 N JCT SR 104 (Lat: 47.792056, Lng: -122.316556), Route carried "on" structure: City street 5, Year Built: 1963, Status: Open, Structure Length: 10.30m (33.79ft), Average Daily Traffic: 2,237 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 2,282 , Design Load: HS 20, Features Intersected: I-5, Facility Carried by Structure: 228TH ST SW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 287.590, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 9 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 24.1m (79.1ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.6m (38.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 61.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $88,000, Roadway Improvement Cost: $9,000, Total Project Cost: $132,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7071F, Location: 2.2 N JCT SR 104 (Lat: 47.806667, Lng: -122.305000), Route carried "on" structure: Interstate 5, Year Built: 1963, Year Reconstructed: 1993, Status: Open, Structure Length: 8.47m (27.79ft), Average Daily Traffic: 100,400 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 134,500 (year 2026), Design Load: HS 20, Features Intersected: 212TH ST SW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 289.440, Lanes on structure: 5, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 5 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 32.6m (107.0ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.6m (70.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $165,000, Roadway Improvement Cost: $17,000, Total Project Cost: $248,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 7071G, Location: 2.2 N JCT SR 104 (Lat: 47.806667, Lng: -122.305000), Route carried "on" structure: Interstate 5, Year Built: 1963, Year Reconstructed: 1995, Status: Open, Structure Length: 8.47m (27.79ft), Average Daily Traffic: 100,400 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 134,500 (year 2026), Design Load: HS 20, Features Intersected: 212TH ST SW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 289.480, Lanes on structure: 5, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 5 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 32.6m (107.0ft), Curb-To-Curb Width: 20.7m (67.9ft), Out-to-Out Width: 21.6m (70.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $165,000, Roadway Improvement Cost: $17,000, Total Project Cost: $248,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 7227A, Location: 0.4 N JCT SR 104 (Lat: 47.785000, Lng: -122.315000), Route carried "on" structure: City street 5, Year Built: 1963, Year Reconstructed: 1983, Status: Open, Structure Length: 9.69m (31.79ft), Average Daily Traffic: 12,578 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 12,830 , Design Load: HS 20, Features Intersected: I-5, Facility Carried by Structure: 236TH ST SW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 286.840, Lanes on structure: 4, Lanes under structure: 11, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 0.0m, Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 17.5m (57.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $156,000, Roadway Improvement Cost: $16,000, Total Project Cost: $234,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 12790A, Location: 1.5 N JCT SR 104 (Lat: 47.800000, Lng: -122.313333), Route carried "on" structure: County highway 5, Year Built: 1963, Year Reconstructed: 1985, Status: Open, Structure Length: 10.30m (33.79ft), Average Daily Traffic: 30,432 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 31,041 , Design Load: H 20, Features Intersected: I-5, Facility Carried by Structure: 220TH ST SW Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 288.480, Lanes on structure: 6, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 30.5m (100.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 3.0m (9.8ft), Curb-To-Curb Width: 21.9m (71.9ft), Out-to-Out Width: 25.2m (82.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 51.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $224,000, Roadway Improvement Cost: $22,000, Total Project Cost: $336,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete Find on map >>
Structure Number: 14326A, Location: 0.2 N JCT SR 104 (Lat: 47.785000, Lng: -122.308333), Route carried "on" structure: Ramp Interstate 5, Year Built: 1995, Status: Open, Structure Length: 11.67m (38.29ft), Average Daily Traffic: 5,283 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 5,389 , Design Load: HS 25, Features Intersected: NBCD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 286.400, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 50.6m (166.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 9.8m (32.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $160,000, Roadway Improvement Cost: $16,000, Total Project Cost: $240,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 14326B, Location: 3.2 N JCT SR 523 (Lat: 47.785000, Lng: -122.310000), Route carried "on" structure: Ramp Interstate 5, Year Built: 1995, Status: Open, Structure Length: 9.39m (30.81ft), Average Daily Traffic: 6,438 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 6,567 , Design Load: HS 25, Features Intersected: S-EW RAMP, I-5, Facility Carried by Structure: SBCD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 286.050, Lanes on structure: 2, Lanes under structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 40.2m (131.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 89.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $133,000, Roadway Improvement Cost: $13,000, Total Project Cost: $200,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 7071D, Location: 0.7 N JCT SR 104 (Lat: 47.792056, Lng: -122.316556), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 10.30m (33.79ft), Average Daily Traffic: 159,000 (year 2002), Truck Traffic: 15%, Features Intersected: I-5, Facility Carried by Structure: 228TH ST SW Minimum Vertical Clearance: 6.88m (22.57ft), Kilometerpoint: 28.759, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.1m (79.1ft) Find on map >>
Structure Number: 7227A, Location: 0.4 N JCT SR 104 (Lat: 47.785000, Lng: -122.315000), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 9.69m (31.79ft), Average Daily Traffic: 159,000 (year 2002), Truck Traffic: 15%, Features Intersected: I-5, Facility Carried by Structure: 236TH ST SW Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 28.684, Lanes on structure: 4, Lanes under structure: 11, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft) Find on map >>
Structure Number: 12790A, Location: 1.5 N JCT SR 104 (Lat: 47.800000, Lng: -122.313333), Route carried "under" structure: Interstate 5, Year Built: 1963, Structure Length: 10.30m (33.79ft), Average Daily Traffic: 160,000 (year 2002), Truck Traffic: 15%, Features Intersected: I-5, Facility Carried by Structure: 220TH ST SW Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 28.848, Lanes on structure: 6, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft) Find on map >>
Structure Number: 14326A, Location: 1.2 E JCT SR 99 (Lat: 47.785000, Lng: -122.308333), Route carried "under" structure: Ramp State highway 104, Year Built: 1995, Structure Length: 11.67m (38.29ft), Average Daily Traffic: 46,254 (year 2002), Truck Traffic: 10%, Features Intersected: NBCD, Facility Carried by Structure: I-5 RAMP Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.771, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.6m (166.0ft) Find on map >>
Structure Number: 14326B, Location: 3.2 N JCT SR 523 (Lat: 47.785000, Lng: -122.310000), Route carried "under" structure: Ramp Interstate 5, Year Built: 1995, Structure Length: 9.39m (30.81ft), Average Daily Traffic: 36,000 (year 2002), Truck Traffic: 13%, Features Intersected: S-EW RAMP, I-5, Facility Carried by Structure: SBCD Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 28.605, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft) Discuss this city on our hugely popular Washington forum Back to: Mountlake Terrace, WA, Washington, All US cities.
|
![]() |