Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New London, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 85ft / 26.0mTotal length
  • 7,935Total average daily traffic
  • 1,052Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New London
  • No street view available for this location

New bridges in New London, IA - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 11970-1979
  • 51990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in New London, IA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
  • 25.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 25.0%Good
  • 37.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 44.4%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 143881,  Location: 071041702 (Lat: 40.944453,  Lng: -91.352950),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 50 (year 2040),  Design Load: HS 20,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.248,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 179891,  Location: 070051106 (Lat: 40.876206,  Lng: -91.395908),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 70 (year 2018),  Average Future Daily Traffic: 70 (year 2040),  Design Load: H 15,  Features Intersected: MUD CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.692,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $10,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1799,  Location: 070051503 (Lat: 40.861775,  Lng: -91.424994),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 70 (year 2014),  Average Future Daily Traffic: 70 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.494,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $131,000,  Roadway Improvement Cost: $15,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 180271,  Location: 071050102 (Lat: 40.984197,  Lng: -91.390583),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 730 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 730 (year 2039),  Design Load: HS 20,  Features Intersected: SOUTH BIG CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.606,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 180291,  Location: 071050205 (Lat: 40.979836,  Lng: -91.392744),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Posted for load,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 5 (year 2014),  Average Future Daily Traffic: 5 (year 2041),  Features Intersected: S BR BIG CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.663,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 180351,  Location: 071051002 (Lat: 40.970375,  Lng: -91.428769),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 60 (year 2018),  Average Future Daily Traffic: 60 (year 2041),  Design Load: HL 93,  Features Intersected: SOUTH BIG CREEK,  Facility Carried by Structure: OASIS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18036,  Location: 071051102 (Lat: 40.967939,  Lng: -91.410075),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 40 (year 2014),  Average Future Daily Traffic: 40 (year 2041),  Design Load: H 15,  Features Intersected: S. BR. BIG CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.932,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.60m (41.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $15,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18038,  Location: 071053204 (Lat: 40.913653,  Lng: -91.457583),  Route carried "on" structure: County highway ,  Year Built: 1951,  Year Reconstructed: 2002,  Status: Posted for load-capacity,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 50 (year 2014),  Average Future Daily Traffic: 50 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH BRUSH CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.654,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 27.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.60m (24.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $10,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 363685,  Location: 071053206 (Lat: 40.903314,  Lng: -91.457950),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 2014),  Average Future Daily Traffic: 50 (year 2040),  Design Load: HS 20,  Features Intersected: BR.BRUSH CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 60734,  Location: At Jct. U.S. 34 (Lat: 40.913633,  Lng: -91.413900),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 1,910 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,910 (year 2041),  Design Load: HS 20,  Features Intersected: RELOC. US 34,  Facility Carried by Structure: SR X-23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.631,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 60734,  Location: At Jct. U.S. 34 (Lat: 40.913633,  Lng: -91.413900),  Route carried "under" structure: US 34,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 18%,  Features Intersected: RELOC. US 34,  Facility Carried by Structure: SR X-23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 398.934,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Discuss New London, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.