Bridge Statistics for Patterson, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 85ft / 26.0mTotal length
  • $9,387,000Total costs
  • 28,540Total average daily traffic
  • 4,710Total average daily truck traffic
  • 42,810Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Patterson
  • No street view available for this location

New bridges in Patterson, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 41950-1959
  • 61960-1969
  • 11980-1989
  • 21990-1999
  • 12010-2019
Average Bridge Daily Traffic in Patterson, GA
Average Bridge Truck Traffic in Patterson, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 75.0%Good
  • 25.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 75.0%Good
  • 25.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 73.3%Very good
  • 6.7%Good
  • 6.7%Satisfactory
  • 13.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 81.8%Good
  • 9.1%Satisfactory
Find on map >>   Show street view

Structure Number: 1551,  Location: 2.7 MI N OF TAYLORSVILLE (Lat: 34.123919,  Lng: -85.001308),  Route carried "on" structure: County highway 47,  Year Built: 1998,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: JONES BRANCH,  Facility Carried by Structure: POPHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $205,000
Find on map >>   Show street view

Structure Number: 2290012,  Location: 4 MI E OF PATTERSON (Lat: 31.361128,  Lng: -82.071769),  Route carried "on" structure: State highway 32,  Year Built: 1967,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 1,210 (year 2012),  Truck Traffic: 25%,  Average Future Daily Traffic: 1,815 (year 2032),  Design Load: H 15,  Features Intersected: ZERO BAY SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.83m (42.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,231,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2290013,  Location: 4 MI E OF PATTERSON (Lat: 31.358158,  Lng: -82.062297),  Route carried "on" structure: State highway 32,  Year Built: 1967,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,210 (year 2012),  Truck Traffic: 25%,  Average Future Daily Traffic: 1,815 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE SATILLA RIVER O/F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2290014,  Location: 5 MI E OF PATTERSON (Lat: 31.356528,  Lng: -82.057039),  Route carried "on" structure: State highway 32,  Year Built: 1967,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,210 (year 2012),  Truck Traffic: 25%,  Average Future Daily Traffic: 1,815 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LITTLE SATILLA RIVER O/F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2290015,  Location: 5 MI E OF PATTERSON (Lat: 31.354969,  Lng: -82.050828),  Route carried "on" structure: State highway 32,  Year Built: 1967,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,210 (year 2012),  Truck Traffic: 25%,  Average Future Daily Traffic: 1,815 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE SATILLA RIVER O/F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2290019,  Location: 5 MI NE OF BLACKSHEAR (Lat: 31.358928,  Lng: -82.171497),  Route carried "on" structure: US 84,  Year Built: 1930,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,440 (year 2012),  Truck Traffic: 19%,  Average Future Daily Traffic: 9,660 (year 2032),  Design Load: H 15,  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $290,000
Find on map >>   Show street view

Structure Number: 2290021,  Location: 1.5 MI NE OF PATTERSON (Lat: 31.403428,  Lng: -82.119708),  Route carried "on" structure: US 84,  Year Built: 1969,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 5,850 (year 2012),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TWENTY FOOT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 87.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $127,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $190,000
Find on map >>   Show street view

Structure Number: 2290029,  Location: PATTERSON CITY LIMITS (Lat: 31.399347,  Lng: -82.138428),  Route carried "on" structure: County highway 1492,  Year Built: 1950,  Status: Posted for load,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 1,270 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,905 (year 2032),  Design Load: H 10,  Features Intersected: SIXTY FOOT CREEK,  Facility Carried by Structure: TYRE BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.58m (34.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $791,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2290042,  Location: 1 MI NE OF PATTERSON (Lat: 31.396989,  Lng: -82.127989),  Route carried "on" structure: US 84,  Year Built: 1988,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 5,850 (year 2012),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,775 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SIXTY FOOT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $344,000
Find on map >>   Show street view

Structure Number: 2290045,  Location: 1 MI NW OF PATTERSON (Lat: 31.398419,  Lng: -82.150469),  Route carried "on" structure: State highway 32,  Year Built: 1990,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,240 (year 2012),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,860 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SIXTY FOOT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2295001,  Location: 1 MI W OF PATTERSON (Lat: 31.395039,  Lng: -82.161989),  Route carried "on" structure: County highway 45,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 12%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: SIXTY FOOT CREEK TRIB.,  Facility Carried by Structure: WALKERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2295005,  Location: 3 MI SE OF PATTERSON (Lat: 31.355689,  Lng: -82.134058),  Route carried "on" structure: County highway 103,  Year Built: 1950,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: GRIFFIN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: March 2019,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2295006,  Location: 2 MI SE OF PATTERSON (Lat: 31.345300,  Lng: -82.119150),  Route carried "on" structure: County highway 117,  Year Built: 1950,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: GRIFFIN BRANCH,  Facility Carried by Structure: LAURA CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2295008,  Location: 2.2 MI SE OF PATTERSON (Lat: 31.341658,  Lng: -82.119169),  Route carried "on" structure: County highway 117,  Year Built: 1950,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: OTTER CREEK,  Facility Carried by Structure: LAURA CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2295041,  Location: 2.1 MI SE OF PATTERSON (Lat: 31.343050,  Lng: -82.119169),  Route carried "on" structure: County highway 117,  Year Built: 2019,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OTTER CREEK TRIB.,  Facility Carried by Structure: LAURA CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.17m (3.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,841,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $4,262,000 ( Estimate for 2019)