Bridge Statistics for Poplar Grove, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 125ft / 37.8mTotal length
  • $413,000Total costs
  • 18,400Total average daily traffic
  • 1,828Total average daily truck traffic
  • 24,410Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Poplar Grove
  • No street view available for this location

New bridges in Poplar Grove, IL - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 11960-1969
  • 21970-1979
  • 31980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Poplar Grove, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Excellent
  • 33.3%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 25.0%Good
  • 41.7%Satisfactory
  • 8.3%Fair
  • 8.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 8.3%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 8.3%Fair
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 4002,  Location: 2.0 MI E POPLAR GROV (Lat: 42.375592,  Lng: -88.779403),  Route carried "on" structure: State highway 173,  Year Built: 2008,  Status: Open,  Structure Length: 3.97m (13.02ft),  Average Daily Traffic: 4,850 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,900 (year 2040),  Design Load: HS 20,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.372,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42005,  Location: 2.7 MI. E. OF IL 76 (Lat: 42.371386,  Lng: -88.798361),  Route carried "on" structure: State highway 173,  Year Built: 2000,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,950 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,800 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BR. BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.650,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018
Find on map >>   Show street view

Structure Number: 43001,  Location: .6 MI E POPLAR GR RD (Lat: 42.308886,  Lng: -88.806611),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 1,900 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,200 (year 2040),  Design Load: HS 15,  Features Intersected: PISCASAW CREEK,  Facility Carried by Structure: WOODSTOCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43002,  Location: 1.0 MI S POPLAR GR (Lat: 42.344172,  Lng: -88.822169),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 2,600 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: HS 15,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: POPLAR GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.651,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $413,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43007,  Location: 5.0 MI SE POPLAR GR (Lat: 42.328056,  Lng: -88.783811),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 525 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 15,  Features Intersected: PISCASAW BRANCH,  Facility Carried by Structure: RUSSELLVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.525,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43029,  Location: 2.5 MI NW CAPRON (Lat: 42.407619,  Lng: -88.795906),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 425 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 15,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: N BOONE SCHOOL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.913,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 43055,  Location: 3.5 MI SE POPLAR GRO (Lat: 42.329950,  Lng: -88.764289),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 175 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 300 (year 2040),  Design Load: H 15,  Features Intersected: BR PISCASAW CR,  Facility Carried by Structure: DENNY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43061,  Location: 0.5 MI SE POPLAR GRO (Lat: 42.355458,  Lng: -88.804117),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 300 (year 2040),  Design Load: HS 15,  Features Intersected: BEAVER CR,  Facility Carried by Structure: EDSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 43068,  Location: 2.5 SE POPLAR GROVE (Lat: 42.346881,  Lng: -88.764400),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 3.71m (12.17ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 60 (year 2040),  Design Load: HS 20,  Features Intersected: PISCASAW CREEK,  Facility Carried by Structure: DENNY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 43072,  Location: 1.5 M SE POPLAR GROV (Lat: 42.344944,  Lng: -88.783911),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 3.52m (11.55ft),  Average Daily Traffic: 425 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 550 (year 2040),  Design Load: HS 20,  Features Intersected: PISCASAW CREEK,  Facility Carried by Structure: RUSSELLVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.729,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 43075,  Location: 1.0 M E POPLAR GROVE (Lat: 42.363972,  Lng: -88.793733),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 3.61m (11.84ft),  Average Daily Traffic: 275 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: BEAVERTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.966,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 43081,  Location: 2.5 M SE POPLAR GROV (Lat: 42.327636,  Lng: -88.793703),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 75 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 900 (year 2040),  Design Load: HS 20,  Features Intersected: E BR PISCASAW CR,  Facility Carried by Structure: GRANGE HALL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.433,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 43096,  Location: 2 MI W OF CAPRON (Lat: 42.393142,  Lng: -88.788925),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 3.65m (11.98ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: CENTERVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.166,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 45009,  Location: 1.75 MI. N. OF IL173 (Lat: 42.396053,  Lng: -88.821969),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 1,600 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,400 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BR. OF BEAVER CREEK,  Facility Carried by Structure: POPLAR GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.750,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021