Bridge Statistics for Pulaski, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 167ft / 51.2mTotal length
  • $21,983,000Total costs
  • 97,485Total average daily traffic
  • 7,914Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pulaski
  • No street view available for this location

New bridges in Pulaski, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 101960-1969
  • 11970-1979
  • 11980-1989
  • 12000-2009
Reconstructed bridges in Pulaski, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Pulaski, NY
Average Bridge Truck Traffic in Pulaski, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 42.9%Good
  • 14.3%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 28.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 37.5%Good
  • 62.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Satisfactory
  • 33.3%Fair
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 10004,  Location: 3.7MI SE JEFFERSON CL + 3 (Lat: 43.634153,  Lng: -76.152844),  Route carried "on" structure: State highway 3,  Year Built: 2002,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 1,279 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,286 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LITTLE SANDY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.280,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $895,000,  Roadway Improvement Cost: $524,000,  Total Project Cost: $1,419,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100858,  Location: .3 MI N JCT US 11 & SH 13 (Lat: 43.565900,  Lng: -76.127183),  Route carried "on" structure: US 11,  Year Built: 1935,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 8,323 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,374 (year 2040),  Design Load: H 20,  Features Intersected: SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.701,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $1,612,000,  Roadway Improvement Cost: $944,000,  Total Project Cost: $2,555,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101068,  Location: JCT OF RTS 13 + I-81 (Lat: 43.555422,  Lng: -76.113767),  Route carried "on" structure: State highway 13,  Year Built: 1961,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 8,384 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,435 (year 2040),  Design Load: HS 20,  Features Intersected: 81I 81I34041223 SB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.254,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.44m (30.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,036,000,  Roadway Improvement Cost: $1,192,000,  Total Project Cost: $3,228,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1031901,  Location: JCT RTE I-81 SB+SALMON R (Lat: 43.559628,  Lng: -76.114122),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 7,949 (year 2004),  Truck Traffic: 28%,  Design Load: HS 20,  Features Intersected: SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.428,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,528,000,  Roadway Improvement Cost: $895,000,  Total Project Cost: $2,423,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1031902,  Location: JCT RTE I-81 NB+SALMON R (Lat: 43.559475,  Lng: -76.113653),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 5,938 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 6,656 (year 2040),  Design Load: HS 20,  Features Intersected: SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.428,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,541,000,  Roadway Improvement Cost: $902,000,  Total Project Cost: $2,444,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 103191,  Location: .8 MILE N JCT I81 & SH 13 (Lat: 43.567158,  Lng: -76.113897),  Route carried "on" structure: County highway ,  Year Built: 1961,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,917 (year 2040),  Design Load: HS 20,  Features Intersected: 81 81 34041231 NB, RTE,  Facility Carried by Structure: RICHLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,728,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,740,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1068051,  Location: 0.7 MI N JCT I-81 SB +13 (Lat: 43.565817,  Lng: -76.113939),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 7,949 (year 2004),  Truck Traffic: 28%,  Design Load: HS 20,  Features Intersected: SPRING BROOK, RESERVOIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.184,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $369,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1068052,  Location: 0.7 MI N JCT I-81 NB +13 (Lat: 43.565803,  Lng: -76.113475),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 5,938 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 6,656 (year 2040),  Design Load: HS 20,  Features Intersected: SPRING BROOK, RESERVOIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.184,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $664,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 320926,  Location: VILLAGE OF PULASKI (Lat: 43.563422,  Lng: -76.130308),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 12.47m (40.91ft),  Average Daily Traffic: 2,301 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,221 (year 2038),  Design Load: HS 20,  Features Intersected: SALMON RIVER,  Facility Carried by Structure: SO JEFFERSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.1m (157.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.46m (40.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,625,000,  Roadway Improvement Cost: $2,123,000,  Total Project Cost: $5,748,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 331372,  Location: 2.6 MI N OF PULASKI (Lat: 43.603189,  Lng: -76.130878),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,032 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,445 (year 2037),  Features Intersected: DEER CREEK,  Facility Carried by Structure: NORTH STREET RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.894,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $393,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101068,  Location: JCT OF RTS 13 + I-81 (Lat: 43.555422,  Lng: -76.113767),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 15,164 (year 1999),  Features Intersected: 81I 81I34041223 SB, RTE,  Facility Carried by Structure: RTE 13
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 36.186,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 103191,  Location: .8 MILE N JCT I81 & SH 13 (Lat: 43.567158,  Lng: -76.113897),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 15,164 (year 1999),  Features Intersected: 81 81 34041231 NB, RTE,  Facility Carried by Structure: RICHLAND ROAD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 37.474,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 703189,  Location: SE CORNER OF PULASKI (Lat: 43.558783,  Lng: -76.114142),  Route carried "under" structure: Interstate ,  Year Built: 1961,  Structure Length: 0. m,  Features Intersected: 81I 81I34041226 NB, RTE,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 36.540,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 703189,  Location: SE CORNER OF PULASKI (Lat: 43.558783,  Lng: -76.114142),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 15,164 (year 1999),  Features Intersected: 81I 81I34041226 NB, RTE,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 36.540,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Discuss Pulaski, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.