![]() |
Bridge Statistics for Santaquin, Utah (UT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Santaquin, UT, Utah, Utah forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 32 meters (105ft) Total costs: $2,840,000 Total average daily traffic: 66,965 Total average daily truck traffic: 16,021 National Bridge Inventory (NBI) Registered Bridges for Santaquin
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: 49056C, Location: 1180 NO.200 E.,SANTAQUIN. (Lat: 39.994833, Lng: -111.780803), Route carried "on" structure: City street , Year Built: 1925, Status: Posted for load, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 42 (year 2003), Average Future Daily Traffic: 51 (year 2023), Features Intersected: HIGHLINE CANAL, Facility Carried by Structure: 200 EAST STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 4.9m (16.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.6m (24.9ft), Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 4.9m (16.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 19.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 13.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below), Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $92,000, Roadway Improvement Cost: $9,000, Total Project Cost: $152,000, Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 49093F, Location: Summit Ridge S. of Santaq (Lat: 39.949722, Lng: -111.816667), Route carried "on" structure: City street , Year Built: 2007, Status: Open, Structure Length: 3.39m (11.12ft), Average Daily Traffic: 300 (year 2007), Truck Traffic: 20%, Average Future Daily Traffic: 600 (year 2027), Design Load: HS 25, Features Intersected: Railroad, Facility Carried by Structure: Summit Ridge Pky Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 32.4m (106.3ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 40.5 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1C 763, Location: SW.SIDE OF SANTAQUIN (Lat: 39.965722, Lng: -111.785139), Route carried "on" structure: Interstate 15, Year Built: 1989, Status: Open, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 12,845 (year 2002), Truck Traffic: 28%, Average Future Daily Traffic: 15,607 (year 2022), Design Load: HS 20, Features Intersected: SANTAQUIN CANYON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 392.436, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.80m (12.47ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $345,000, Roadway Improvement Cost: $35,000, Total Project Cost: $570,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 1F 128, Location: SANTAQUIN INTERCHANGE (Lat: 39.975472, Lng: -111.772278), Route carried "on" structure: Interstate 15, Year Built: 1967, Status: Open, Structure Length: 4.18m (13.71ft), Average Daily Traffic: 12,408 (year 2002), Truck Traffic: 28%, Average Future Daily Traffic: 15,076 (year 2022), Design Load: HS 20, Features Intersected: US-6 (SR-6), INT. X-ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 393.981, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 13 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.0m (59.1ft), Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.20m (17.06ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $469,000, Roadway Improvement Cost: $47,000, Total Project Cost: $774,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 3C 763, Location: SW SIDE OF SANTAQUIN (Lat: 39.966361, Lng: -111.784969), Route carried "on" structure: Interstate 15, Year Built: 1989, Status: Open, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 12,435 (year 2002), Truck Traffic: 30%, Average Future Daily Traffic: 15,109 (year 2022), Design Load: HS 20, Features Intersected: SANTAQUIN CANYON ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 392.458, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 26.8m (87.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.80m (12.47ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $345,000, Roadway Improvement Cost: $35,000, Total Project Cost: $570,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 3F 128, Location: SANTAQUIN INTERCHANGE (Lat: 39.975806, Lng: -111.772500), Route carried "on" structure: Interstate 15, Year Built: 1967, Status: Open, Structure Length: 4.18m (13.71ft), Average Daily Traffic: 12,160 (year 2002), Truck Traffic: 30%, Average Future Daily Traffic: 14,774 (year 2022), Design Load: HS 20, Features Intersected: US-6 (SR-6), INT. X-ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 393.947, Lanes on structure: 2, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 13 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.0m (59.1ft), Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.20m (17.06ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $469,000, Roadway Improvement Cost: $47,000, Total Project Cost: $774,000 ( Estimate for 2001), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 1C 763, Location: SW.SIDE OF SANTAQUIN (Lat: 39.965722, Lng: -111.785139), Route carried "under" structure: County highway , Year Built: 1989, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 250 (year 2002), Truck Traffic: 10%, Features Intersected: SANTAQUIN CANYON ROAD, Facility Carried by Structure: I-15 (SR-15) NBL Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 1F 128, Location: SANTAQUIN INTERCHANGE (Lat: 39.975472, Lng: -111.772278), Route carried "under" structure: US 6, Year Built: 1967, Structure Length: 4.18m (13.71ft), Average Daily Traffic: 12,755 (year 2002), Truck Traffic: 9%, Features Intersected: US-6 (SR-6), INT. X-ROAD, Facility Carried by Structure: I-15 (SR-15) NBL Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 258.355, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.0m (59.1ft) Find on map >>
Structure Number: 3C 763, Location: SW SIDE OF SANTAQUIN (Lat: 39.966361, Lng: -111.784969), Route carried "under" structure: County highway , Year Built: 1989, Structure Length: 2.87m (9.42ft), Average Daily Traffic: 250 (year 2002), Truck Traffic: 10%, Features Intersected: SANTAQUIN CANYON ROAD, Facility Carried by Structure: I-15 (SR-15) SBL Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 3F 128, Location: SANTAQUIN INTERCHANGE (Lat: 39.975806, Lng: -111.772500), Route carried "under" structure: US 6, Year Built: 1967, Structure Length: 4.18m (13.71ft), Average Daily Traffic: 3,520 (year 2002), Truck Traffic: 9%, Features Intersected: US-6 (SR-6), INT. X-ROAD, Facility Carried by Structure: I-15 (SR-15) SBL Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 25.832, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.0m (59.1ft) Discuss this city on our hugely popular Utah forum Back to: Santaquin, UT, Utah, All US cities.
|
![]() |