  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 144ft / 44.1mTotal length
  • $4,821,000Total costs
  • 10,574Total average daily traffic
  • 539Total average daily truck traffic
  • 11,123Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Schuyler
  • No street view available for this location

New bridges in Schuyler, VA - historical statistics
  • New bridges - historical statistics
  • 61930-1939
  • 21960-1969
  • 71970-1979
  • 11980-1989
  • 11990-1999
Reconstructed bridges in Schuyler, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 52000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 30.8%Good
  • 53.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 30.8%Good
  • 30.8%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.8%Good
  • 61.5%Satisfactory
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 25.0%Good
  • 43.8%Satisfactory
  • 18.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 414,  Location: 0.10 FR 717/0.20 TO 721 (Lat: 37.817453,  Lng: -78.665042),  Route carried "on" structure: State highway 6,  Year Built: 1984,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 949 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,047 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GREEN CREEK,  Facility Carried by Structure: IRISH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.307,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 415,  Location: .07 FR 800/.29 TO 723 (Lat: 37.811186,  Lng: -78.675394),  Route carried "on" structure: State highway 6,  Year Built: 1932,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 949 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,047 (year 2040),  Design Load: HS 20,  Features Intersected: BRIAR FORK,  Facility Carried by Structure: IRISH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.067,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $66,000
Find on map >>   Show street view

Structure Number: 726,  Location: 0.65 FR D.E./0.35 TO 717 (Lat: 37.826292,  Lng: -78.660644),  Route carried "on" structure: County highway 670,  Year Built: 1932,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 57 (year 2015),  Average Future Daily Traffic: 64 (year 2040),  Features Intersected: CROWN CREEK,  Facility Carried by Structure: DAMON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.056,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $190,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 812,  Location: AT NELSON CL/0.02 TO 602 (Lat: 37.771047,  Lng: -78.682189),  Route carried "on" structure: County highway 722,  Year Built: 1970,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 293 (year 2018),  Average Future Daily Traffic: 325 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ROCKFISH RIVER,  Facility Carried by Structure: GLADE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 813,  Location: 0.09 FR 6 / 1.76 TO 722 (Lat: 37.810861,  Lng: -78.670147),  Route carried "on" structure: County highway 723,  Year Built: 1932,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 64 (year 2018),  Average Future Daily Traffic: 78 (year 2040),  Design Load: HS 20,  Features Intersected: GREEN CREEK,  Facility Carried by Structure: SHARON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.156,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $126,000
Find on map >>   Show street view

Structure Number: 12373,  Location: 1.96-Rt. 29/1.47-Albemarl (Lat: 37.828428,  Lng: -78.734875),  Route carried "on" structure: State highway 6,  Year Built: 1933,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 2.97m (9.74ft),  Average Daily Traffic: 2,187 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,198 (year 2040),  Design Load: H 15,  Features Intersected: Cove Creek,  Facility Carried by Structure: Irish Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.774,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,110,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,665,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 12374,  Location: 1.75-Rt.29 / 0.00-Rt.620 (Lat: 37.829825,  Lng: -78.738056),  Route carried "on" structure: State highway 6,  Year Built: 1939,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 2,187 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,198 (year 2040),  Features Intersected: NS Railroad,  Facility Carried by Structure: Irish Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.434,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 12375,  Location: 0.59 - Rt 29 / 2.84 - ACL (Lat: 37.842328,  Lng: -78.750675),  Route carried "on" structure: State highway 6,  Year Built: 1933,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 2,187 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,198 (year 2040),  Features Intersected: Hickory Creek,  Facility Carried by Structure: Irish Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.569,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,110,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,665,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 12506,  Location: 0.05-Rt.6 / 0.10-Rt.601 (Lat: 37.828278,  Lng: -78.736503),  Route carried "on" structure: County highway 632,  Year Built: 1971,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 119 (year 2020),  Average Future Daily Traffic: 131 (year 2040),  Features Intersected: Cove Creek,  Facility Carried by Structure: Shiloh Loop
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.9m (42.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 12507,  Location: 0.96-Rt.774 / 0.04-Rt.620 (Lat: 37.830786,  Lng: -78.734669),  Route carried "on" structure: County highway 632,  Year Built: 1966,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 305 (year 2020),  Average Future Daily Traffic: 427 (year 2040),  Features Intersected: Cove Creek,  Facility Carried by Structure: Faber Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.719,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.8m (35.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $296,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1252,  Location: 2.87-Rt.763/0.10-Rt 617 (Lat: 37.797267,  Lng: -78.748847),  Route carried "on" structure: County highway 639,  Year Built: 1970,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 245 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 270 (year 2040),  Design Load: HS 15,  Features Intersected: Rockfish River,  Facility Carried by Structure: Laurel Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.493,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.6m (77.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12567,  Location: 0.05-Rt 774 / 0.15-End (Lat: 37.851158,  Lng: -78.736606),  Route carried "on" structure: County highway 670,  Year Built: 1970,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 12 (year 2020),  Average Future Daily Traffic: 13 (year 2040),  Features Intersected: Cove Creek,  Facility Carried by Structure: Cove Valley Lane
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.036,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 1259,  Location: 0.38-Rt. 803/0.12-Rt. 617 (Lat: 37.787231,  Lng: -78.699186),  Route carried "on" structure: County highway 693,  Year Built: 1971,  Status: Open,  Structure Length: 6.85m (22.47ft),  Average Daily Traffic: 346 (year 2017),  Average Future Daily Traffic: 386 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Rockfish River,  Facility Carried by Structure: Salem Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.730,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.0m (78.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: March 2017,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12596,  Location: 0.02-Rt.617/0.58-Dead End (Lat: 37.804756,  Lng: -78.761506),  Route carried "on" structure: County highway 714,  Year Built: 1970,  Status: Posted for load,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 20 (year 2020),  Average Future Daily Traffic: 22 (year 2040),  Features Intersected: Rockfish River,  Facility Carried by Structure: Drumheller Lane
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.890,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $813,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12611,  Location: 0.20-Rt 670 / 0.50-Rt 632 (Lat: 37.848039,  Lng: -78.735928),  Route carried "on" structure: County highway 774,  Year Built: 1976,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 15 (year 2020),  Average Future Daily Traffic: 16 (year 2040),  Features Intersected: Cove Creek,  Facility Carried by Structure: Davidson Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.248,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 1262,  Location: 0.01-Rt 740/0.41-Rt 808 (Lat: 37.792772,  Lng: -78.699350),  Route carried "on" structure: County highway 800,  Year Built: 1964,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 634 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 697 (year 2040),  Design Load: HS 20,  Features Intersected: Ivy Creek,  Facility Carried by Structure: Schuyler Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 2498,  Location: 1.87-Rt.722 / 2.23-Rt.646 (Lat: 37.743353,  Lng: -78.696967),  Route carried "on" structure: County highway 645,  Year Built: 1997,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 5 (year 2020),  Average Future Daily Traffic: 6 (year 2040),  Features Intersected: Beaver Creek,  Facility Carried by Structure: Carter Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.358,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Schuyler, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.