Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Shawangunk, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 177ft / 53.6mTotal length
  • $51,025,000Total costs
  • 29,830Total average daily traffic
  • 2,051Total average daily truck traffic
  • 39,713Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shawangunk
  • No street view available for this location

New bridges in Shawangunk, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 31940-1949
  • 11950-1959
  • 31960-1969
  • 51980-1989
  • 31990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Shawangunk, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Shawangunk, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Very good
  • 31.8%Good
  • 36.4%Satisfactory
  • 22.7%Fair
  • 4.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 9.1%Very good
  • 22.7%Good
  • 40.9%Satisfactory
  • 4.5%Fair
  • 9.1%Poor
  • 4.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.5%Excellent
  • 4.5%Very good
  • 22.7%Good
  • 50.0%Satisfactory
  • 13.6%Fair
  • 4.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Very good
  • 18.2%Good
  • 59.1%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 102664,  Location: 7.5 MI S JCT RTS 52 & 209 (Lat: 41.633447,  Lng: -74.377364),  Route carried "on" structure: State highway 52,  Year Built: 1998,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,513 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,790 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.433,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,475,000,  Roadway Improvement Cost: $1,449,000,  Total Project Cost: $3,924,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102665,  Location: 10.3MI E JCT RTS 52+209 (Lat: 41.616161,  Lng: -74.334172),  Route carried "on" structure: State highway 52,  Year Built: 2016,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 2,513 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,790 (year 2040),  Design Load: HL 93,  Features Intersected: VERKEERDER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.939,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $547,000,  Total Project Cost: $1,482,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222467,  Location: 1.8 MILES NW OF DWAARKILL (Lat: 41.657258,  Lng: -74.296606),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 175 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 245 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BEAVER BROOK,  Facility Carried by Structure: MOUNTAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $701,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222468,  Location: 0.7 MI SE OF DWAARKILL (Lat: 41.640056,  Lng: -74.255886),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 1,354 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,896 (year 2037),  Features Intersected: DWAAR KILL,  Facility Carried by Structure: RED MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $773,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222469,  Location: AT ULSTERVILLE (Lat: 41.610778,  Lng: -74.336200),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 682 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 955 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: VERKEERDER KILL,  Facility Carried by Structure: JOHNS ESTATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $437,000,  Total Project Cost: $1,182,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22247,  Location: .2 MILE SE OF ULSTERVILLE (Lat: 41.607353,  Lng: -74.332433),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,004 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,406 (year 2037),  Design Load: H 20,  Features Intersected: VERKEERDER KILL,  Facility Carried by Structure: ULSTERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $794,000,  Roadway Improvement Cost: $465,000,  Total Project Cost: $1,259,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222472,  Location: 1.5 MI WEST OF DWAARKILL (Lat: 41.650083,  Lng: -74.292942),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 647 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 906 (year 2039),  Design Load: HS 20,  Features Intersected: BEAVER BROOK,  Facility Carried by Structure: JANSEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $381,000,  Total Project Cost: $1,031,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222473,  Location: 2 MI NW TOWN OF WALLKILL (Lat: 41.624614,  Lng: -74.199903),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 238 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 333 (year 2037),  Design Load: HS 20,  Features Intersected: DWAAR KILL,  Facility Carried by Structure: BATES LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $732,000,  Roadway Improvement Cost: $429,000,  Total Project Cost: $1,161,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33085,  Location: 1.5 MI SW POOLEVILLE POND (Lat: 42.752008,  Lng: -75.532061),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 370 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 518 (year 2039),  Design Load: HS 20,  Features Intersected: SANGERFIELD RIVER,  Facility Carried by Structure: CR89 EARLVILLE ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $556,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33464,  Location: 3 MI NE OF WALKER VALLEY (Lat: 41.655717,  Lng: -74.328717),  Route carried "on" structure: County highway ,  Year Built: 2001,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 488 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 683 (year 2039),  Design Load: HS 20,  Features Intersected: VERKEERDER KILL,  Facility Carried by Structure: OREGON TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.583,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,010,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33467,  Location: .9 MI SW OF WALKER VALLEY (Lat: 41.619369,  Lng: -74.386361),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 1,072 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,501 (year 2039),  Features Intersected: PLATTE KILL,  Facility Carried by Structure: WALKER VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $530,000,  Total Project Cost: $1,436,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334683,  Location: 2.0 MI W OF WALLKILL (Lat: 41.615278,  Lng: -74.216156),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 3,636 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,090 (year 2034),  Features Intersected: DWAAR KILL,  Facility Carried by Structure: County Road 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.234,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $916,000,  Roadway Improvement Cost: $536,000,  Total Project Cost: $1,452,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334693,  Location: 0.8 MI NW OF WALKER VALLE (Lat: 41.640156,  Lng: -74.392983),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 315 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 441 (year 2039),  Features Intersected: PLATTE KILL,  Facility Carried by Structure: GRAU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $763,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $1,209,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334721,  Location: 3.0 mi North of CR 52 (Lat: 41.624350,  Lng: -74.198053),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 3,016 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,222 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: DWAAR KILL,  Facility Carried by Structure: COUNTY ROAD 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.443,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $411,000,  Total Project Cost: $1,113,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334732,  Location: 0.3 MI W OF WALLKILL (Lat: 41.606175,  Lng: -74.185919),  Route carried "on" structure: County highway ,  Year Built: 1915,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 3,636 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,498 (year 2040),  Features Intersected: WALLKILL RIVER,  Facility Carried by Structure: COUNTY ROAD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.6m (103.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $8,387,000,  Roadway Improvement Cost: $4,912,000,  Total Project Cost: $13,299,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 334734,  Location: 0.3 MI SW OF ULSTERVILLE (Lat: 41.607222,  Lng: -74.339753),  Route carried "on" structure: County highway ,  Year Built: 1938,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 2,291 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,207 (year 2039),  Features Intersected: VERKEERDER KILL,  Facility Carried by Structure: COUNTY ROAD 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $1,037,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334743,  Location: 2.5 MI SE OF BRUYNSWICK (Lat: 41.635594,  Lng: -74.188697),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 639 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 895 (year 2039),  Design Load: HS 20,  Features Intersected: WALLKILL RIVER,  Facility Carried by Structure: COUNTY ROAD 19
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 19.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.26m (30.38ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $6,477,000,  Roadway Improvement Cost: $3,793,000,  Total Project Cost: $10,270,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334748,  Location: 0.6 MI SE OF ULSTERVILLE (Lat: 41.603475,  Lng: -74.327397),  Route carried "on" structure: Other road ,  Year Built: 1957,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 289 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 405 (year 2037),  Features Intersected: VERKEERDER KILL,  Facility Carried by Structure: PIROG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $322,000,  Total Project Cost: $871,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334751,  Location: 0.4 MI SE OF BRUYNSWICK (Lat: 41.656214,  Lng: -74.219767),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 975 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,365 (year 2039),  Design Load: HS 20,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: COUNTY ROAD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.461,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $2,197,000,  Roadway Improvement Cost: $1,286,000,  Total Project Cost: $3,483,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334755,  Location: 1 MILE NW OF DWAARKILL (Lat: 41.656878,  Lng: -74.277664),  Route carried "on" structure: Other road ,  Year Built: 1948,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 485 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 679 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BEAVER BROOK,  Facility Carried by Structure: AWOSTING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.459,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $604,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $958,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334765,  Location: AT DWAARKILL (Lat: 41.647839,  Lng: -74.263283),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,201 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,681 (year 2039),  Features Intersected: DWAAR KILL,  Facility Carried by Structure: COUNTY ROAD 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.857,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $893,000,  Roadway Improvement Cost: $523,000,  Total Project Cost: $1,416,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334777,  Location: 1.8 MI SE OF ULSTERVILLE (Lat: 41.595092,  Lng: -74.365653),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,291 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,207 (year 2039),  Features Intersected: PLATTE KILL,  Facility Carried by Structure: BURLINGHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $884,000,  Roadway Improvement Cost: $518,000,  Total Project Cost: $1,402,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Shawangunk, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.