Bridge Statistics for St. John, Missouri (MO) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: St. John, MO, Missouri, Missouri forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 12 Total length: 138 meters (453ft) Total average daily traffic: 315,084 Total average daily truck traffic: 36,276 National Bridge Inventory (NBI) Registered Bridges for St. John
Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: 2715, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "on" structure: Interstate 170, Year Built: 1981, Status: Open, Structure Length: 13.53m (44.39ft), Average Daily Traffic: 57,013 (year 2006), Truck Traffic: 11%, Average Future Daily Traffic: 71,266 (year 2028), Design Load: HS 20, Features Intersected: MO 180, RP IS170W TO IS1 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 9.389, Lanes on structure: 3, Lanes under structure: 7, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.0m (68.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 4, Length of Maximum Span: 34.7m (113.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.1m (59.4ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 46.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 2716, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "on" structure: Interstate 170, Year Built: 1981, Status: Open, Structure Length: 12.80m (41.99ft), Average Daily Traffic: 62,525 (year 2006), Truck Traffic: 11%, Average Future Daily Traffic: 78,156 (year 2028), Design Load: HS 20, Features Intersected: MO 180, RP IS170E TO IS1 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.470, Lanes on structure: 3, Lanes under structure: 7, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.0m (68.9ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 4, Length of Maximum Span: 34.1m (111.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 18.1m (59.4ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 48.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 301, Location: S 28 T 46 N R 6 E (Lat: 38.703333, Lng: -90.348333), Route carried "on" structure: City street , Year Built: 1981, Status: Open, Structure Length: 10.82m (35.50ft), Average Daily Traffic: 3,896 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 5,844 (year 2028), Design Load: HS 20, Features Intersected: IS 170, Facility Carried by Structure: LACKLAND RD E Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.205, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 36.3m (119.1ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 1.7m (5.6ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 47.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: December 2006, Other Special Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 3701, Location: S 18 T 46 N R 6 E (Lat: 38.725000, Lng: -90.378333), Route carried "on" structure: State highway 180, Year Built: 1985, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 34,982 (year 2006), Truck Traffic: 17%, Average Future Daily Traffic: 43,727 (year 2028), Design Load: HS 20, Features Intersected: DAWSON CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.132, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 58.5 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007 Find on map >>
Structure Number: 2715, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "under" structure: State highway 180, Year Built: 1981, Structure Length: 13.53m (44.39ft), Average Daily Traffic: 12,063 (year 2006), Truck Traffic: 10%, Features Intersected: MO 180, Facility Carried by Structure: IS 170 W Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 10.398, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.7m (113.8ft) Find on map >>
Structure Number: 2715, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "under" structure: Ramp State highway , Year Built: 1981, Structure Length: 13.53m (44.39ft), Average Daily Traffic: 5,500 (year 2007), Truck Traffic: 10%, Features Intersected: RP IS170E TO IS170W, Facility Carried by Structure: IS 170 W Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.391, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.7m (113.8ft) Find on map >>
Structure Number: 2715, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "under" structure: Ramp State highway , Year Built: 1981, Structure Length: 13.53m (44.39ft), Average Daily Traffic: 5,500 (year 2007), Truck Traffic: 10%, Features Intersected: RP IS170W TO IS170E, Facility Carried by Structure: IS 170 W Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.332, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.7m (113.8ft) Find on map >>
Structure Number: 2716, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "under" structure: State highway 180, Year Built: 1981, Structure Length: 12.80m (41.99ft), Average Daily Traffic: 9,892 (year 2006), Truck Traffic: 10%, Features Intersected: MO 180, Facility Carried by Structure: IS 170 E Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 10.345, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.1m (111.9ft) Find on map >>
Structure Number: 2716, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "under" structure: Ramp State highway , Year Built: 1981, Structure Length: 12.80m (41.99ft), Average Daily Traffic: 5,500 (year 2007), Truck Traffic: 10%, Features Intersected: RP IS170E TO IS170W, Facility Carried by Structure: IS 170 E Minimum Vertical Clearance: 5.14m (16.86ft), Kilometerpoint: 0.312, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.1m (111.9ft) Find on map >>
Structure Number: 2716, Location: S 21 T 46 N R 6 E (Lat: 38.708333, Lng: -90.343333), Route carried "under" structure: Ramp State highway , Year Built: 1981, Structure Length: 12.80m (41.99ft), Average Daily Traffic: 5,500 (year 2007), Truck Traffic: 10%, Features Intersected: RP IS170W TO IS170E, Facility Carried by Structure: IS 170 E Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.412, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.1m (111.9ft) Find on map >>
Structure Number: 301, Location: S 28 T 46 N R 6 E (Lat: 38.703333, Lng: -90.348333), Route carried "under" structure: Interstate 170, Year Built: 1981, Structure Length: 10.82m (35.50ft), Average Daily Traffic: 57,013 (year 2006), Truck Traffic: 11%, Features Intersected: IS 170, Facility Carried by Structure: LACKLAND RD E Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 8.715, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.3m (119.1ft) Find on map >>
Structure Number: 301, Location: S 28 T 46 N R 6 E (Lat: 38.703333, Lng: -90.348333), Route carried "under" structure: Interstate 170, Year Built: 1981, Structure Length: 10.82m (35.50ft), Average Daily Traffic: 55,700 (year 2006), Truck Traffic: 11%, Features Intersected: IS 170, Facility Carried by Structure: LACKLAND RD E Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 9.297, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.3m (119.1ft) Discuss this city on our hugely popular Missouri forum Back to: St. John, MO, Missouri, All US cities.
|
![]() |