National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 12 meters (39ft)
Total costs: $4,957,000
Total average daily traffic: 4,425
Total average daily truck traffic: 317
Total future (year 2015) average daily traffic: 6,637
National Bridge Inventory (NBI) Registered Bridges for Starksboro

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 2
  • 1960-1969: 4
  • 1970-1979: 1
  • 1980-1989: 1
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1970-1979: 1
  • 1980-1989: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 100119001801191,  Location: 1.1 MI TO JCT W VT116 (Lat: 44.243611,  Lng: -73.074167),  Route carried "on" structure: Other road C3039,  Year Built: 1938,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 40 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 60 (year 2018),  Features Intersected: LEWIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $598,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100119001901191,  Location: 0.3 MI TO JCT W VT116 (Lat: 44.244444,  Lng: -73.066111),  Route carried "on" structure: Other road C2003,  Year Built: 1967,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 250 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 375 (year 2018),  Design Load: H 20,  Features Intersected: LEWIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $778,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $928,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 100119004901191,  Location: 0.1 MI E OF JCT VT 116 (Lat: 44.195556,  Lng: -73.051389),  Route carried "on" structure: Other road C3026,  Year Built: 1984,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 50 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 75 (year 2018),  Design Load: HS 20,  Features Intersected: LEWIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $643,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100119005001191,  Location: 0.3 MI TO JCT W VT116 (Lat: 44.215556,  Lng: -73.063611),  Route carried "on" structure: Other road C3025,  Year Built: 1952,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 10 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 15 (year 2024),  Design Load: HS 15,  Features Intersected: LEWIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $368,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 100119005101191,  Location: 0.3 MI TO JCT W VT116 (Lat: 44.223333,  Lng: -73.063611),  Route carried "on" structure: Other road C3022,  Year Built: 1990,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 20 (year 2004),  Truck Traffic: 2%,  Average Future Daily Traffic: 30 (year 2024),  Features Intersected: LEWIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $543,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>

Structure Number: 100119005301191,  Location: 0.01 MI TO JCT W VT17 (Lat: 44.162778,  Lng: -73.013889),  Route carried "on" structure: Other road C3006,  Year Built: 1978,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 75 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2018),  Design Load: HS 20,  Features Intersected: BALDWIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $730,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 200021001501192,  Location: 3.4 MI N JCT. VT.17 E (Lat: 44.198056,  Lng: -73.051667),  Route carried "on" structure: State highway 116,  Year Built: 1955,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 2,300 (year 1998),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,450 (year 2018),  Design Load: H 20,  Features Intersected: LEWIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.058,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $696,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 200200002401192,  Location: 6.7 MI E JCT. VT.116 N (Lat: 44.210833,  Lng: -72.965556),  Route carried "on" structure: State highway 17,  Year Built: 1965,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 800 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,200 (year 2018),  Design Load: H 20,  Features Intersected: HUNTINGTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $115,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $140,000 ( Estimate for 2007)
Find on map >>

Structure Number: 200211001101192,  Location: 0.2 MI N JCT. VT.17 (Lat: 44.216944,  Lng: -72.966944),  Route carried "on" structure: County highway 4,  Year Built: 1962,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 440 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 660 (year 2015),  Design Load: H 20,  Features Intersected: HUNTINGTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $128,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $153,000 ( Estimate for 2007)
Find on map >>

Structure Number: 200211007S01192,  Location: 0.1 MI N JCT. VT.17 (Lat: 44.214444,  Lng: -72.965833),  Route carried "on" structure: County highway 4,  Year Built: 1962,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 440 (year 1995),  Truck Traffic: 6%,  Average Future Daily Traffic: 660 (year 2015),  Design Load: H 20,  Features Intersected: HUNTINGTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Serious,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $158,000 ( Estimate for 2007)

Discuss this city on our hugely popular Vermont forum

Back to: Starksboro, VT, Vermont, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.