Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Stevenson, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 636ft / 194mTotal length
  • $63,271,000Total costs
  • 117,856Total average daily traffic
  • 16,296Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Stevenson
  • No street view available for this location

New bridges in Stevenson, AL - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 31940-1949
  • 41950-1959
  • 31960-1969
  • 21970-1979
  • 41980-1989
  • 91990-1999
  • 12010-2019
Average Bridge Daily Traffic in Stevenson, AL
Average Bridge Truck Traffic in Stevenson, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.8%Excellent
  • 42.9%Good
  • 33.3%Satisfactory
  • 19.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.8%Excellent
  • 47.6%Good
  • 28.6%Satisfactory
  • 19.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.8%Excellent
  • 38.1%Good
  • 52.4%Satisfactory
  • 4.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.0%Excellent
  • 8.0%Very good
  • 40.0%Good
  • 32.0%Satisfactory
  • 16.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 71.4%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 793,  Location: 1.1 MI E JCT SR 117 (Lat: 34.878392,  Lng: -85.821392),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 1,120 (year 1997),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,260 (year 2041),  Design Load: H 15,  Features Intersected: BENGESS CREEK,  Facility Carried by Structure: 2ND ST
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $522,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $574,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 794,  Location: 035 MI N US 72 (Lat: 34.776814,  Lng: -85.899064),  Route carried "on" structure: County highway 42,  Year Built: 1930,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 330 (year 1989),  Truck Traffic: 5%,  Average Future Daily Traffic: 490 (year 2039),  Design Load: H 10,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Underwater Inspection Date: May 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 847,  Location: 0.5 MI E JCT SR 117 (Lat: 34.922969,  Lng: -85.887675),  Route carried "on" structure: County highway 170,  Year Built: 1930,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 80 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 103 (year 2039),  Design Load: H 15,  Features Intersected: TRIB TO CROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91,  Location: 0.7 MI N JCT CR 42 (Lat: 34.819178,  Lng: -85.931336),  Route carried "on" structure: County highway 55,  Year Built: 1931,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 104 (year 1989),  Truck Traffic: 3%,  Average Future Daily Traffic: 128 (year 2039),  Design Load: H 10,  Features Intersected: Tributary to Mud Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $229,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 995,  Location: 1.0 MI W JCT CR 75 (Lat: 34.902686,  Lng: -85.823261),  Route carried "on" structure: County highway 71,  Year Built: 1932,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 50 (year 1989),  Truck Traffic: 1%,  Average Future Daily Traffic: 78 (year 2039),  Design Load: H 10,  Features Intersected: WIMBERLY BRANCH,  Facility Carried by Structure: CR 158
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $196,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2595,  Location: 0.8 MI W JCT SR91 * US278 (Lat: 34.174556,  Lng: -86.629506),  Route carried "on" structure: US 278,  Year Built: 1941,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,532 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 11,945 (year 2040),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 147.952,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $580,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3334,  Location: 5.9 MI N JCT SR 117* US72 (Lat: 34.913639,  Lng: -85.879028),  Route carried "on" structure: State highway 117,  Year Built: 1948,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 959 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,343 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.996,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $326,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3335,  Location: 6.4 MI N JCT SR 117* US72 (Lat: 34.916942,  Lng: -85.887089),  Route carried "on" structure: State highway 117,  Year Built: 1948,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 901 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,261 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.820,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $385,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4428,  Location: 3 MI N JCT S 001 (Lat: 32.597394,  Lng: -85.117933),  Route carried "on" structure: County highway 1379,  Year Built: 1952,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 3,808 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,712 (year 2040),  Features Intersected: SOAP CREEK,  Facility Carried by Structure: Lee Road 379
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $363,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6318,  Location: 1.1 MI E JCT CR 35 (Lat: 34.874069,  Lng: -85.910811),  Route carried "on" structure: County highway 53,  Year Built: 1958,  Status: Posted for load,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 142 (year 1989),  Truck Traffic: 2%,  Average Future Daily Traffic: 175 (year 2039),  Features Intersected: LITTLE COON CREEK(MC)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 33.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6377,  Location: 0.5 MI S OF TENN RIVER (Lat: 34.829444,  Lng: -85.794917),  Route carried "on" structure: State highway 117,  Year Built: 1958,  Status: Open,  Structure Length: 27.43m (89.99ft),  Average Daily Traffic: 3,319 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,647 (year 2038),  Design Load: H 15,  Features Intersected: TENN RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.611,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 30,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 27.43m (89.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $5,831,000,  Roadway Improvement Cost: $583,000,  Total Project Cost: $6,414,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6378,  Location: 3 MI S OF STEVENSON (Lat: 34.832308,  Lng: -85.799672),  Route carried "on" structure: State highway 117,  Year Built: 1958,  Status: Open,  Structure Length: 42.70m (140.09ft),  Average Daily Traffic: 3,319 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,647 (year 2038),  Design Load: HS 15,  Features Intersected: TENNESSEE RIVER
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 56.145,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 14.3m (46.9ft), Horizontal Clearance: 150.0m (492.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 152.4m (500.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 42.70m (140.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $9,076,000,  Roadway Improvement Cost: $908,000,  Total Project Cost: $9,984,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 704,  Location: 0.7 MI N CEDARGROVE (Lat: 34.841308,  Lng: -85.869842),  Route carried "on" structure: County highway 45,  Year Built: 1960,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 285 (year 1989),  Truck Traffic: 7%,  Average Future Daily Traffic: 320 (year 2039),  Design Load: H 10,  Features Intersected: CROW CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $240,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7057,  Location: 0.15 MI W JCT SR 117 (Lat: 34.875433,  Lng: -85.862381),  Route carried "on" structure: County highway 54,  Year Built: 1960,  Status: Posted for load,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 264 (year 1989),  Truck Traffic: 7%,  Average Future Daily Traffic: 300 (year 2038),  Design Load: H 15,  Features Intersected: CROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Underwater Inspection Date: May 2018,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,419,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,561,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9173,  Location: 1.45 MI NW JCT CR 45 (Lat: 34.847172,  Lng: -85.895300),  Route carried "on" structure: County highway 155,  Year Built: 1966,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 25 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 42 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $239,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 11686,  Location: 100' E US 72 (Lat: 34.872950,  Lng: -85.812386),  Route carried "on" structure: County highway 85,  Year Built: 1976,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 565 (year 1989),  Truck Traffic: 15%,  Average Future Daily Traffic: 675 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,643,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,807,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11825,  Location: 2.4 MI N CEDARGROVE (Lat: 34.859031,  Lng: -85.852606),  Route carried "on" structure: County highway 45,  Year Built: 1977,  Status: Posted for load,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 263 (year 1990),  Truck Traffic: 4%,  Average Future Daily Traffic: 278 (year 2038),  Design Load: H 10,  Features Intersected: CROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Underwater Inspection Date: May 2018,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,261,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,387,000 ( Estimate for 2022),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 13878,  Location: 7.0 MI W JCT SR117 * US72 (Lat: 34.766211,  Lng: -85.900356),  Route carried "on" structure: US 72,  Year Built: 1986,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 6,662 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 9,327 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 238.336,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.93m (35.86ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $3,148,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $3,463,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13879,  Location: 7.0 MI W JCT SR117 * US72 (Lat: 34.766125,  Lng: -85.900236),  Route carried "on" structure: US 72,  Year Built: 1986,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 6,662 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 9,327 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 238.336,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.93m (35.86ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $3,148,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $3,463,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14497,  Location: 1 MI W JCT US 72 * SR 117 (Lat: 34.840067,  Lng: -85.831853),  Route carried "on" structure: US 72,  Year Built: 1988,  Status: Open,  Structure Length: 16.09m (52.79ft),  Average Daily Traffic: 13,323 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,652 (year 2040),  Design Load: HS 20,  Features Intersected: CROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 249.126,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.84m (55.25ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $4,850,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $5,335,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14927,  Location: 2.65 MI N JCT CR 71 (Lat: 34.935156,  Lng: -85.835714),  Route carried "on" structure: County highway 71,  Year Built: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 25 (year 1989),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: WIMBERLY BRANCH,  Facility Carried by Structure: CR 258
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15229,  Location: JCT US 72 * SR 117 (Lat: 34.854500,  Lng: -85.823439),  Route carried "on" structure: State highway 117,  Year Built: 1990,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 3,046 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,264 (year 2039),  Design Load: HS 20,  Features Intersected: US 72
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.320,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.87m (32.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,995,000,  Roadway Improvement Cost: $400,000,  Total Project Cost: $4,395,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15525,  Location: 1 MI W JCT US 72 * SR 117 (Lat: 34.840125,  Lng: -85.832039),  Route carried "on" structure: US 72,  Year Built: 1992,  Status: Open,  Structure Length: 16.09m (52.79ft),  Average Daily Traffic: 13,323 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,652 (year 2040),  Design Load: HS 20,  Features Intersected: CROW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 249.126,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.84m (55.25ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $4,850,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $5,335,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16302,  Location: 1 MI N STEVENSON (Lat: 34.889625,  Lng: -85.814572),  Route carried "on" structure: County highway 75,  Year Built: 1997,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 520 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 725 (year 2039),  Design Load: HS 20,  Features Intersected: DITCH
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $706,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 17191,  Location: 2.5 MI EAST OF SR 117 (Lat: 34.887181,  Lng: -85.811342),  Route carried "on" structure: US 72,  Year Built: 1994,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 6,477 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 9,068 (year 2038),  Design Load: HS 20,  Features Intersected: CSX R.R.,CO.RD.54
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 253.914,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.04m (42.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,828,000,  Roadway Improvement Cost: $483,000,  Total Project Cost: $5,311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17192,  Location: 2.5 MI EAST OF SR 117 (Lat: 34.887417,  Lng: -85.810972),  Route carried "on" structure: US 72,  Year Built: 1994,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 6,477 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 9,068 (year 2038),  Design Load: HS 20,  Features Intersected: CXS R.R.* CO. RD. 54
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 253.914,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.3m (138.8ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.04m (42.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,828,000,  Roadway Improvement Cost: $483,000,  Total Project Cost: $5,311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19817,  Location: 1 MILE EAST SR117 (Lat: 34.868500,  Lng: -85.814583),  Route carried "on" structure: State highway 2,  Year Built: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 12,953 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 18,134 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 252.506,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,371,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,608,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20803,  Location: 1 mi. E of INT of Hwy 72 (Lat: 34.755364,  Lng: -85.900553),  Route carried "on" structure: County highway 205,  Year Built: 2017,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 372 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 553 (year 2038),  Design Load: HS 20,  Features Intersected: Mud Creek,  Facility Carried by Structure: Co Rd 213
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.05m (19.85ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $1,244,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,368,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15229,  Location: JCT US 72 * SR 117 (Lat: 34.854500,  Lng: -85.823439),  Route carried "under" structure: US 72,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 13,950 (year 2019),  Truck Traffic: 21%,  Features Intersected: US 72,  Facility Carried by Structure: SR 117
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 250.897,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 17191,  Location: 2.5 MI EAST OF SR 117 (Lat: 34.887181,  Lng: -85.811342),  Route carried "under" structure: County highway 54,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2018),  Truck Traffic: 4%,  Features Intersected: CSX R.R.,CO.RD.54,  Facility Carried by Structure: US 72,SR 2
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 17192,  Location: 2.5 MI EAST OF SR 117 (Lat: 34.887417,  Lng: -85.810972),  Route carried "under" structure: County highway 54,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2018),  Truck Traffic: 4%,  Features Intersected: CXS R.R.* CO. RD. 54,  Facility Carried by Structure: US 72 SR 2
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.3m (138.8ft)

Discuss Stevenson, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.