Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Stockertown, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 240ft / 73.0mTotal length
  • $6,602,000Total costs
  • 262,237Total average daily traffic
  • 33,988Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Stockertown
  • No street view available for this location

New bridges in Stockertown, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 11960-1969
  • 101970-1979
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Stockertown, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Stockertown, PA
Average Bridge Truck Traffic in Stockertown, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 30.8%Good
  • 46.2%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 7.7%Good
  • 53.8%Satisfactory
  • 30.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 61.5%Satisfactory
  • 7.7%Fair
  • 23.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 14.3%Satisfactory
  • 42.9%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 5619,  Location: 1.25 MI.W.OF MARTINSBURG (Lat: 40.321256,  Lng: -78.344969),  Route carried "on" structure: State highway 164,  Year Built: 1966,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,868 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,187 (year 2032),  Design Load: H 20,  Features Intersected: TR.PLUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.440,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 17271,  Location: KINGSLEY TOWNSHIP (Lat: 41.514583,  Lng: -79.324392),  Route carried "on" structure: City street 7207,  Year Built: 1910,  Year Reconstructed: 1995,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 70 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: OVER ROSS RUN,  Facility Carried by Structure: T-338
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 21102,  Location: 0.75 MI.S.E. OF EPHRATA (Lat: 40.163356,  Lng: -76.151267),  Route carried "on" structure: US 222,  Year Built: 1970,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 19,012 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 21,568 (year 2032),  Design Load: HS 20,  Features Intersected: 322 EB 322 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.069,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21112,  Location: 2 mi. E. of Reamstown (Lat: 40.216667,  Lng: -76.090000),  Route carried "on" structure: US 222,  Year Built: 1972,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 18,231 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 19,474 (year 2032),  Design Load: HS 20,  Features Intersected: SR 1040; Spur Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.656,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 28504,  Location: HERCULES CEMENT CO. (Lat: 40.750569,  Lng: -75.264778),  Route carried "on" structure: State highway 33,  Year Built: 1970,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 28,748 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 21,401 (year 2032),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $741,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 28506,  Location: HERCULES CEMENT CO. (Lat: 40.750533,  Lng: -75.265231),  Route carried "on" structure: State highway 33,  Year Built: 1970,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 28,699 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,252 (year 2032),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.309,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.00m (39.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $873,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 28507,  Location: 0.5 MI N OF PA 191 EXIT (Lat: 40.762131,  Lng: -75.273600),  Route carried "on" structure: State highway 33,  Year Built: 1970,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 19,459 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 21,401 (year 2032),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.820,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $569,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 28508,  Location: 0.5 MI.N.PA.191 EXIT (Lat: 40.761731,  Lng: -75.273856),  Route carried "on" structure: State highway 33,  Year Built: 1970,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 17,910 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 22,252 (year 2032),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.735,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $569,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 28565,  Location: NEAR BORO LINE (Lat: 40.753731,  Lng: -75.274117),  Route carried "on" structure: State highway 191,  Year Built: 1970,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 6,082 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,222 (year 2032),  Design Load: HS 20,  Features Intersected: BUSHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.212,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 25.4m (83.3ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $437,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 28566,  Location: PA33 INTERCHANGE (Lat: 40.755228,  Lng: -75.268439),  Route carried "on" structure: State highway 191,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 12,795 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,636 (year 2032),  Design Load: HS 20,  Features Intersected: PA 33(LR 1098)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.212,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $682,000,  Total Project Cost: $3,126,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28739,  Location: STOCKERTOWN,CENTER ST. (Lat: 40.754400,  Lng: -75.259331),  Route carried "on" structure: State highway ,  Year Built: 1929,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 8,317 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,002 (year 2036),  Design Load: HS 20,  Features Intersected: LITTLE BUSHKILL CREEK,  Facility Carried by Structure: SR 2025 (LR 166)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.905,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $287,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 42278,  Location: 0.5 MI S OF PA 191 EXIT (Lat: 40.749061,  Lng: -75.264328),  Route carried "on" structure: State highway 33,  Year Built: 2004,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 28,748 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 21,401 (year 2036),  Design Load: HL 93,  Features Intersected: BUSHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.9m (157.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42446,  Location: 0.5MI S OF PA 191 EXIT (Lat: 40.749064,  Lng: -75.264797),  Route carried "on" structure: State highway 33,  Year Built: 2004,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 28,699 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,252 (year 2036),  Design Load: HL 93,  Features Intersected: BUSHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.309,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5619,  Location: 0.5 MI EAST OF PA 191 (Lat: 40.756900,  Lng: -75.261194),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 250 (year 1980),  Truck Traffic: 1%,  Average Future Daily Traffic: 634 (year 2030),  Design Load: HL 93,  Features Intersected: Little Bushkill Creek,  Facility Carried by Structure: Lefevre Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 28566,  Location: PA33 INTERCHANGE (Lat: 40.755228,  Lng: -75.268439),  Route carried "under" structure: State highway 33,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 19,459 (year 2021),  Truck Traffic: 15%,  Features Intersected: PA 33(LR 1098),  Facility Carried by Structure: PA 191(APPL.1019)
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 14.185,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 28566,  Location: PA33 INTERCHANGE (Lat: 40.755228,  Lng: -75.268439),  Route carried "under" structure: State highway 33,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 17,910 (year 2021),  Truck Traffic: 15%,  Features Intersected: PA 33(LR 1098),  Facility Carried by Structure: PA 191(APPL.1019)
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 14.093,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Discuss Stockertown, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.