Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Stockton, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 59ft / 17.9mTotal length
  • 33,655Total average daily traffic
  • 12,903Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Stockton
  • No street view available for this location

New bridges in Stockton, IA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 41960-1969
  • 21990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Stockton, IA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Stockton, IA
Average Bridge Truck Traffic in Stockton, IA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 37.5%Very good
  • 12.5%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 25.0%Good
  • 37.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 25.0%Good
  • 12.5%Fair
  • 12.5%Poor
  • 25.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 55.6%Satisfactory
  • 22.2%Fair
Find on map >>   Show street view

Structure Number: 46771,  Location: 078010401 (Lat: 41.596769,  Lng: -90.860250),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 3,060 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,060 (year 2040),  Design Load: HL 93,  Features Intersected: MUD CREEK,  Facility Carried by Structure: F58 (HWY 927)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.656,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 257841,  Location: 078E10404 (Lat: 41.593497,  Lng: -90.858311),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 600 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.653,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 16.70m (54.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 257851,  Location: 078E10408 (Lat: 41.587283,  Lng: -90.861533),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 150 (year 2014),  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.989,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25788,  Location: 078E11002 (Lat: 41.580672,  Lng: -90.842353),  Route carried "on" structure: County highway ,  Year Built: 1948,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 310 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 310 (year 2040),  Design Load: H 15,  Features Intersected: MUD CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 90.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 257901,  Location: 078E11601 (Lat: 41.566125,  Lng: -90.845356),  Route carried "on" structure: County highway ,  Year Built: 1960,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 80 (year 2018),  Average Future Daily Traffic: 80 (year 2041),  Design Load: H 20,  Features Intersected: WEST BRANCH MUD CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.548,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 15.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $22,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25791,  Location: 078E12102 (Lat: 41.552225,  Lng: -90.862261),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 80 (year 2014),  Average Future Daily Traffic: 80 (year 2040),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.096,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 32.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $19,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25793,  Location: 078E12203 (Lat: 41.546178,  Lng: -90.841617),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 90 (year 2014),  Average Future Daily Traffic: 90 (year 2041),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.936,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $14,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 302431,  Location: 079E12702 (Lat: 41.618364,  Lng: -90.841181),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 15 (year 2018),  Average Future Daily Traffic: 15 (year 2039),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: 30TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.406,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $5,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 363665,  Location: 079E13402 (Lat: 41.604206,  Lng: -90.841269),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 70 (year 2018),  Average Future Daily Traffic: 70 (year 2039),  Design Load: HS 20,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.835,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $5,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4742,  Location: 9.0 MI. E OF E JCT. IA 38 (Lat: 41.632697,  Lng: -90.860567),  Route carried "under" structure: Interstate 80,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 29,200 (year 2020),  Truck Traffic: 43%,  Features Intersected: I-80 & US 6,  Facility Carried by Structure: FM Y-30
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 450.105,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Discuss Stockton, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.