Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Story, Wyoming (WY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 144ft / 44.0mTotal length
  • $53,000Total costs
  • 35,996Total average daily traffic
  • 8,808Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Story
  • No street view available for this location

New bridges in Story, WY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11940-1949
  • 141960-1969
  • 31980-1989
  • 22010-2019
Reconstructed bridges in Story, WY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Story, WY
Average Bridge Truck Traffic in Story, WY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 37.5%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 50.0%Good
  • 37.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 37.5%Good
  • 31.3%Satisfactory
  • 18.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 44.4%Very good
  • 44.4%Good
  • 11.1%Satisfactory
Find on map >>   Show street view

Structure Number: BCF,  Location: Sheridan - Buffalo (Lat: 44.633508,  Lng: -106.857442),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 3,500 (year 2021),  Truck Traffic: 38%,  Average Future Daily Traffic: 4,900 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CR 129 / Pompey Creek Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.577,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BCG,  Location: Sheridan - Buffalo (Lat: 44.633683,  Lng: -106.856925),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 4,096 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,734 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CR 129 / Pompey Creek Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.529,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BCH,  Location: Sheridan - Buffalo (Lat: 44.630256,  Lng: -106.855311),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 3,650 (year 2021),  Truck Traffic: 38%,  Average Future Daily Traffic: 5,110 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.976,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BCI,  Location: Sheridan - Buffalo (Lat: 44.630422,  Lng: -106.854797),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 4,096 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,734 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.928,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BCJ,  Location: Sheridan - Buffalo (Lat: 44.619497,  Lng: -106.849056),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 3,650 (year 2021),  Truck Traffic: 38%,  Average Future Daily Traffic: 5,110 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Upper Prairie Dog Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.270,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BCK,  Location: Sheridan - Buffalo (Lat: 44.619517,  Lng: -106.848428),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 4,096 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,734 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Upper Prairie Dog Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.241,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BCL,  Location: Sheridan - Buffalo (Lat: 44.613753,  Lng: -106.847000),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 3,794 (year 2021),  Truck Traffic: 38%,  Average Future Daily Traffic: 5,312 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.932,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BCM,  Location: Sheridan - Buffalo (Lat: 44.613778,  Lng: -106.846425),  Route carried "on" structure: Interstate 90,  Year Built: 1968,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 4,025 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,635 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Machinery Pass
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.903,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML9,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: BKG,  Location: 2 Miles W. Of Storey (Lat: 44.579842,  Lng: -106.932228),  Route carried "on" structure: County highway 2,  Year Built: 1914,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 210 (year 2041),  Features Intersected: North Piney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.767,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $39,000 ( Estimate for 2014),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: BMW,  Location: Story - West (Lat: 44.572289,  Lng: -106.893758),  Route carried "on" structure: State highway 194,  Year Built: 1962,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 650 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 910 (year 2041),  Design Load: H 20,  Features Intersected: Prairie Dog Creek Ditch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.716,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: CQO,  Location: Story - West (Lat: 44.576825,  Lng: -106.884942),  Route carried "on" structure: State highway 194,  Year Built: 1962,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,548 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,167 (year 2041),  Design Load: HS 20,  Features Intersected: Prairie Dog Creek Ditch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.541,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: FDN,  Location: Story (Lat: 44.570933,  Lng: -106.890722),  Route carried "on" structure: County highway 145,  Year Built: 1986,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 401 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 561 (year 2041),  Design Load: HS 20,  Features Intersected: South Piney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.203,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: FFA,  Location: Banner-Story (Lat: 44.569722,  Lng: -106.876556),  Route carried "on" structure: State highway 193,  Year Built: 1986,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 113 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 158 (year 2041),  Design Load: HS 20,  Features Intersected: South Piney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.670,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: FFB,  Location: Banner-Story (Lat: 44.575342,  Lng: -106.879058),  Route carried "on" structure: State highway 193,  Year Built: 1986,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 113 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 158 (year 2041),  Design Load: HS 20,  Features Intersected: North Piney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.335,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: IHW,  Location: Sheridan-Buffalo (Lat: 44.529022,  Lng: -106.810272),  Route carried "on" structure: State highway 193,  Year Built: 1947,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 620 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 868 (year 2041),  Features Intersected: Little Piney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.444,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: MXI,  Location: Jct I-90 - Story (Lat: 44.535461,  Lng: -106.816842),  Route carried "on" structure: State highway 193,  Year Built: 2017,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 620 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 868 (year 2041),  Design Load: HL 93,  Features Intersected: Piney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.329,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $7,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MXK,  Location: Jct I-90 - Story (Lat: 44.539758,  Lng: -106.823814),  Route carried "on" structure: State highway 193,  Year Built: 2017,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 630 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 882 (year 2041),  Design Load: HL 93,  Features Intersected: Piney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.107,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $7,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: BCF,  Location: Sheridan - Buffalo (Lat: 44.633508,  Lng: -106.857442),  Route carried "under" structure: County highway 129,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 42 (year 2021),  Truck Traffic: 3%,  Features Intersected: CR 129 / Pompey Creek Rd,  Facility Carried by Structure: I-90 EBL
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 1.645,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: BCG,  Location: Sheridan - Buffalo (Lat: 44.633683,  Lng: -106.856925),  Route carried "under" structure: County highway 129,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 42 (year 2021),  Truck Traffic: 3%,  Features Intersected: CR 129 / Pompey Creek Rd,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 1.691,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: BCJ,  Location: Sheridan - Buffalo (Lat: 44.619497,  Lng: -106.849056),  Route carried "under" structure: County highway 127,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2021),  Truck Traffic: 4%,  Features Intersected: Upper Prairie Dog Road,  Facility Carried by Structure: I-90 EBL
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 2.773,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: BCK,  Location: Sheridan - Buffalo (Lat: 44.619517,  Lng: -106.848428),  Route carried "under" structure: County highway 127,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2021),  Truck Traffic: 4%,  Features Intersected: Upper Prairie Dog Road,  Facility Carried by Structure: I-90 WBL
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 2.824,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Discuss Story, Wyoming (WY) on our hugely popular Wyoming forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.