Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Strathmore, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 35Number of bridges
  • 344ft / 105mTotal length
  • $57,656,000Total costs
  • 1,088,644Total average daily traffic
  • 23,637Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Strathmore
  • No street view available for this location

New bridges in Strathmore, NJ - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 211950-1959
  • 11960-1969
  • 121970-1979
Reconstructed bridges in Strathmore, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31960-1969
  • 21970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Strathmore, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 41.2%Good
  • 52.9%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.5%Good
  • 58.8%Satisfactory
  • 17.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 58.8%Good
  • 29.4%Satisfactory
  • 11.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 1300MA6,  Location: 0.5 MI E OF INT NJ 34& 79 (Lat: 40.407850,  Lng: -74.228619),  Route carried "on" structure: County highway 45,  Year Built: 1923,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 10,936 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,344 (year 2041),  Features Intersected: GRAVELLY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $976,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $1,766,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1360153,  Location: 0.73 MILE SOUTH OF NJ 35 (Lat: 40.418531,  Lng: -74.212819),  Route carried "on" structure: County highway 3,  Year Built: 1965,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 17,300 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,760 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH JERSEY COAST LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.117,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,153,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $2,032,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361158E,  Location: 2.5 M SE OF GSP&NJ 36 JCT (Lat: 40.388728,  Lng: -74.179239),  Route carried "on" structure: Other road GSP,  Year Built: 1975,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 31,824 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,820 (year 2040),  Design Load: H 20,  Features Intersected: TELEGRAPH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 186.443,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,116,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,860,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361158U,  Location: 2.5 MI SE OF GSP&RT36 JCT (Lat: 40.388569,  Lng: -74.179433),  Route carried "on" structure: Other road GSP,  Year Built: 1954,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 31,830 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,820 (year 2040),  Design Load: H 20,  Features Intersected: TELEGRAPH HILL PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 186.443,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,675,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $3,793,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361159I,  Location: 2.5 MI SE OF GSP&RT36 JCT (Lat: 40.389225,  Lng: -74.178714),  Route carried "on" structure: Other road GSP,  Year Built: 1972,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 31,824 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,820 (year 2040),  Design Load: H 20,  Features Intersected: TELEGRAPH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 186.443,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $750,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361159O,  Location: 2.5MLS.SE OF GSP&RT36 JCT (Lat: 40.389386,  Lng: -74.178500),  Route carried "on" structure: Other road GSP,  Year Built: 1954,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 31,824 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,820 (year 2039),  Design Load: H 20,  Features Intersected: TELEGRAPH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 186.443,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,675,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $2,793,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361167S,  Location: 1.5 MI SE OF GSP&RT36 JCT (Lat: 40.399489,  Lng: -74.189008),  Route carried "on" structure: County highway 4,  Year Built: 1954,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 7,054 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,605 (year 2040),  Design Load: HS 20,  Features Intersected: GSP SBI & SBO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.300,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.56m (28.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,372,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $5,620,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361169N,  Location: 1.5 MI SE OF GSP&RT36 JCT (Lat: 40.401150,  Lng: -74.189169),  Route carried "on" structure: County highway 4,  Year Built: 1954,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 7,054 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,605 (year 2040),  Design Load: HS 20,  Features Intersected: GSP NBI & NBO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.493,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.36m (33.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,960,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $16,600,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361174U,  Location: 1 MI SE OF GSP & RT36 JCT (Lat: 40.405617,  Lng: -74.197692),  Route carried "on" structure: Ramp Other road GSP,  Year Built: 1975,  Status: Open,  Structure Length: 15.51m (50.89ft),  Average Daily Traffic: 1,367 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,668 (year 2040),  Design Load: H 20,  Features Intersected: GSP SBO,  Facility Carried by Structure: SBI EXIT RAMP FLYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 188.937,  Lanes on structure: 1,  Lanes under structure: 3,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.51m (50.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $1,777,000,  Roadway Improvement Cost: $530,000,  Total Project Cost: $2,962,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361176N,  Location: 0.74 mi. N of GSP/CR4 Jct (Lat: 40.408881,  Lng: -74.198606),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 11,073 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,510 (year 2040),  Design Load: HS 20,  Features Intersected: GSP NBI & NBO,  Facility Carried by Structure: BETHANY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,968,000,  Roadway Improvement Cost: $350,000,  Total Project Cost: $3,347,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 361176S,  Location: 0.74 mi. N of GSP/CR4 Jct (Lat: 40.408181,  Lng: -74.199708),  Route carried "on" structure: City street ,  Year Built: 1954,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 10,269 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,530 (year 2040),  Design Load: HS 20,  Features Intersected: GSP SBI & SBO,  Facility Carried by Structure: BETHANY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,927,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $6,676,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361183E,  Location: 0.25 MI SE OF GSP&RT36 JC (Lat: 40.417381,  Lng: -74.205411),  Route carried "on" structure: Other road GSP,  Year Built: 1975,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 30,755 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,526 (year 2040),  Design Load: H 20,  Features Intersected: NJ TRANSIT RR,  Facility Carried by Structure: PARKWAY SBI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.385,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361185B,  Location: GSP Interchange 117 (Lat: 40.419353,  Lng: -74.207825),  Route carried "on" structure: Other road GSP,  Year Built: 1971,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 83,232 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 99,700 (year 2040),  Design Load: HS 20,  Features Intersected: Luppatcong Creek,  Facility Carried by Structure: NBI & NBO & Ramps
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.788,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 39.3m (128.9ft),  Skew: 1 degrees,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 361185E,  Location: AT GSP & RT 36 JUNCTION (Lat: 40.418903,  Lng: -74.208425),  Route carried "on" structure: Other road GSP,  Year Built: 1972,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 35,325 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 43,096 (year 2040),  Design Load: H 20,  Features Intersected: INT.117 SB EXIT RAMP A,  Facility Carried by Structure: PARKWAY SBI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.707,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,528,000,  Roadway Improvement Cost: $379,000,  Total Project Cost: $3,287,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361185I,  Location: AT GSP & RT 36 JUNCTION (Lat: 40.419042,  Lng: -74.207969),  Route carried "on" structure: Other road GSP,  Year Built: 1974,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 40,841 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 49,833 (year 2040),  Design Load: H 20,  Features Intersected: INT.117 SB EXIT RAMP A,  Facility Carried by Structure: PARKWAY NBI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.707,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361185U,  Location: AT GSP & RT 36 JUNCTION (Lat: 40.418714,  Lng: -74.210025),  Route carried "on" structure: Other road GSP,  Year Built: 1953,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 55,162 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 67,298 (year 2040),  Design Load: H 20,  Features Intersected: INT.117 SB EXIT RAMP A,  Facility Carried by Structure: PARKWAY SBO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.707,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,708,000,  Roadway Improvement Cost: $556,000,  Total Project Cost: $4,820,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361186U,  Location: 0.25 MI NW OF GSP&RT36 JC (Lat: 40.419989,  Lng: -74.212428),  Route carried "on" structure: County highway 3,  Year Built: 1953,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 12,353 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,068 (year 2040),  Design Load: H 20,  Features Intersected: SBO & SB RAMPS A1 & E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.294,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $750,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361191T,  Location: 0.5 MI NW OF GSP &RT36 JC (Lat: 40.423228,  Lng: -74.217167),  Route carried "on" structure: County highway 516,  Year Built: 1953,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 13,054 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,922 (year 2040),  Design Load: H 20,  Features Intersected: GARDEN STATE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.082,  Lanes on structure: 2,  Lanes under structure: 12,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 10.58m (34.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $400,000,  Total Project Cost: $600,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 361158E,  Location: 2.5 M SE OF GSP&NJ 36 JCT (Lat: 40.388728,  Lng: -74.179239),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 3,599 (year 2020),  Truck Traffic: 1%,  Features Intersected: TELEGRAPH HILL ROAD,  Facility Carried by Structure: GSP SBI
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 361158U,  Location: 2.5 MI SE OF GSP&RT36 JCT (Lat: 40.388569,  Lng: -74.179433),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 3,707 (year 2020),  Truck Traffic: 1%,  Features Intersected: TELEGRAPH HILL PARK ROAD,  Facility Carried by Structure: GSP SBO
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 361159I,  Location: 2.5 MI SE OF GSP&RT36 JCT (Lat: 40.389225,  Lng: -74.178714),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,915 (year 2020),  Truck Traffic: 1%,  Features Intersected: TELEGRAPH HILL ROAD,  Facility Carried by Structure: GSP NBI
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 361159O,  Location: 2.5MLS.SE OF GSP&RT36 JCT (Lat: 40.389386,  Lng: -74.178500),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 2,849 (year 2018),  Truck Traffic: 1%,  Features Intersected: TELEGRAPH HILL ROAD,  Facility Carried by Structure: GSP NBO
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 361167S,  Location: 1.5 MI SE OF GSP&RT36 JCT (Lat: 40.399489,  Lng: -74.189008),  Route carried "under" structure: Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 76,680 (year 2020),  Truck Traffic: 5%,  Features Intersected: GSP SBI & SBO,  Facility Carried by Structure: HOLMDEL RD (CR 4)
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 188.068,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 361169N,  Location: 1.5 MI SE OF GSP&RT36 JCT (Lat: 40.401150,  Lng: -74.189169),  Route carried "under" structure: Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 85,980 (year 2020),  Truck Traffic: 5%,  Features Intersected: GSP NBI & NBO,  Facility Carried by Structure: HOLMDEL RD (CR 4)
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 188.068,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 361174U,  Location: 1 MI SE OF GSP & RT36 JCT (Lat: 40.405617,  Lng: -74.197692),  Route carried "under" structure: Other road GSP,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 50,490 (year 2020),  Truck Traffic: 1%,  Features Intersected: GSP SBO,  Facility Carried by Structure: SBI EXIT RAMP FLYO
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 188.937,  Lanes on structure: 1,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 361176N,  Location: 0.74 mi. N of GSP/CR4 Jct (Lat: 40.408881,  Lng: -74.198606),  Route carried "under" structure: Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 76,398 (year 2020),  Truck Traffic: 5%,  Features Intersected: GSP NBI & NBO,  Facility Carried by Structure: BETHANY ROAD
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 189.259,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 361176S,  Location: 0.74 mi. N of GSP/CR4 Jct (Lat: 40.408181,  Lng: -74.199708),  Route carried "under" structure: Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 73,236 (year 2020),  Truck Traffic: 5%,  Features Intersected: GSP SBI & SBO,  Facility Carried by Structure: BETHANY ROAD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 189.259,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 361176S,  Location: 0.74 mi. N of GSP/CR4 Jct (Lat: 40.408181,  Lng: -74.199708),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 4,162 (year 2020),  Truck Traffic: 1%,  Features Intersected: GSP SBI & SBO,  Facility Carried by Structure: BETHANY ROAD
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 189.259,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 361185E,  Location: AT GSP & RT 36 JUNCTION (Lat: 40.418903,  Lng: -74.208425),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 7,164 (year 2020),  Features Intersected: INT.117 SB EXIT RAMP A,  Facility Carried by Structure: PARKWAY SBI
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 361185I,  Location: AT GSP & RT 36 JUNCTION (Lat: 40.419042,  Lng: -74.207969),  Route carried "under" structure: Ramp Other road ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 16,625 (year 2020),  Features Intersected: INT.117 SB EXIT RAMP A,  Facility Carried by Structure: PARKWAY NBI
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 190.707,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 361185U,  Location: AT GSP & RT 36 JUNCTION (Lat: 40.418714,  Lng: -74.210025),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 3,237 (year 2020),  Features Intersected: INT.117 SB EXIT RAMP A,  Facility Carried by Structure: PARKWAY SBO
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 190.707,  Lanes on structure: 3,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 361186U,  Location: 0.25 MI NW OF GSP&RT36 JC (Lat: 40.419989,  Lng: -74.212428),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 44,370 (year 2020),  Truck Traffic: 1%,  Features Intersected: SBO & SB RAMPS A1 & E,  Facility Carried by Structure: LLOYD ROAD (CR 3)
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 191.174,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 361186U,  Location: 0.25 MI NW OF GSP&RT36 JC (Lat: 40.419989,  Lng: -74.212428),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 114 (year 2020),  Truck Traffic: 1%,  Features Intersected: SBO & SB RAMPS A1 & E,  Facility Carried by Structure: LLOYD ROAD (CR 3)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 191.174,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 361186U,  Location: 0.25 MI NW OF GSP&RT36 JC (Lat: 40.419989,  Lng: -74.212428),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 114 (year 2020),  Truck Traffic: 1%,  Features Intersected: SBO & SB RAMPS A1 & E,  Facility Carried by Structure: LLOYD ROAD (CR 3)
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 191.174,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 361191T,  Location: 0.5 MI NW OF GSP &RT36 JC (Lat: 40.423228,  Lng: -74.217167),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 173,927 (year 2020),  Features Intersected: GARDEN STATE PARKWAY,  Facility Carried by Structure: LO MAIN ST (CR516)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 191.641,  Lanes on structure: 2,  Lanes under structure: 12,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss Strathmore, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.