Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Thorsby, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 46ft / 14.4mTotal length
  • $7,039,000Total costs
  • 31,346Total average daily traffic
  • 2,788Total average daily truck traffic
  • 38,683Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Thorsby
  • No street view available for this location

New bridges in Thorsby, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31950-1959
  • 21960-1969
  • 31970-1979
  • 12010-2019
Reconstructed bridges in Thorsby, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Thorsby, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 60.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Excellent
  • 50.0%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 4187,  Location: 6775 FT W JCT 69 (Lat: 34.361753,  Lng: -86.448067),  Route carried "on" structure: County highway 418,  Year Built: 1951,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 1,100 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 10,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: COUNTY HIGHWAY141
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 36.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $424,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4192,  Location: 1730 FT S JCT 1372 (Lat: 34.268706,  Lng: -86.130289),  Route carried "on" structure: County highway 548,  Year Built: 1970,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 150 (year 2000),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: H 10,  Features Intersected: CREEK,  Facility Carried by Structure: COUNTY HIGHWAY154
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 4193,  Location: 3420 FT N JCT 1513 (Lat: 34.374275,  Lng: -86.145181),  Route carried "on" structure: County highway 562,  Year Built: 1951,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 136 (year 2000),  Truck Traffic: 1%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 10,  Features Intersected: DRY CREEK,  Facility Carried by Structure: CLAUDE HILL RD.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $241,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4197,  Location: VERBENA (Lat: 32.755167,  Lng: -86.512433),  Route carried "on" structure: US 31,  Year Built: 1925,  Year Reconstructed: 1952,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 4,070 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,228 (year 2033),  Design Load: H 15,  Features Intersected: CHESTNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 341.532,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.7m (28.5ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.34m (17.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,575,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,733,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6108,  Location: CR50 1M NE PATES CHAPELCH (Lat: 32.916356,  Lng: -86.744267),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,200 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,350 (year 2030),  Design Load: H 20,  Features Intersected: PATE CREEK,  Facility Carried by Structure: CR50PLEASANT GRV R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $518,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1062,  Location: 0.7MI N.US.231 (Lat: 32.421944,  Lng: -86.243333),  Route carried "on" structure: Bypass State highway 152,  Year Built: 1971,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 23,320 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,455 (year 2033),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.461,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,504,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,654,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16509,  Location: CR229 2 MSW CROSSROAD SCH (Lat: 32.869894,  Lng: -86.732694),  Route carried "on" structure: County highway ,  Year Built: 1971,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 220 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2029),  Features Intersected: CR229 EILAND BRANCH,  Facility Carried by Structure: CR229 LIVEOAK ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $602,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $662,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17046,  Location: CR5 1.2M NE MT.CARMEL CH (Lat: 32.883000,  Lng: -86.755031),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 200 (year 1997),  Average Future Daily Traffic: 210 (year 2029),  Design Load: H 15,  Features Intersected: GALE CREEK,  Facility Carried by Structure: CR5 MT CARMEL RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $714,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $785,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20135,  Location: CR50 1.5 M E OF US HWY 31 (Lat: 32.924972,  Lng: -86.699639),  Route carried "on" structure: County highway 50,  Year Built: 1967,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 750 (year 2008),  Average Future Daily Traffic: 900 (year 2030),  Design Load: HS 20,  Features Intersected: CO. RD. 50 * LEAF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $517,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20734,  Location: 1.5 MI NW OF THORSBY (Lat: 32.923300,  Lng: -86.742600),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 240 (year 2041),  Design Load: HS 20,  Features Intersected: RAM CREEK,  Facility Carried by Structure: MEDICAL CENTER DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $204,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $224,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Thorsby, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.