Bridge Statistics for Troy, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Troy, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 21 Total length: 206 meters (676ft) Total costs: $50,680,000 Total average daily traffic: 329,966 Total average daily truck traffic: 22,943 National Bridge Inventory (NBI) Registered Bridges for Troy
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 100016, Location: BURDEN AVE RT378 S.TROY (Lat: 42.704344, Lng: -73.696369), Route carried "on" structure: State highway 378, Year Built: 1932, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 33,904 (year 2005), Truck Traffic: 5%, Average Future Daily Traffic: 49,846 (year 2025), Features Intersected: WYNANTS KILL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.750, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.1m (39.7ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 2.4m (7.9ft), Curb-To-Curb Width: 29.8m (97.8ft), Out-to-Out Width: 35.6m (116.8ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $1,419,000, Roadway Improvement Cost: $844,000, Total Project Cost: $2,263,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 105432, Location: JCT.1ST&2ND STE FERRY ST. (Lat: 42.727886, Lng: -73.692953), Route carried "on" structure: City street , Year Built: 1965, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 30,000 (year 1978), Truck Traffic: 6%, Average Future Daily Traffic: 43,323 (year 1998), Features Intersected: FERRY ST RT 2 EB, Facility Carried by Structure: FIRST & SECOND ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.8m (38.7ft), Curb or Sidewalk Widths: Left: 3.6m (11.8ft), Right: 3.6m (11.8ft), Curb-To-Curb Width: 18.8m (61.7ft), Out-to-Out Width: 156.8m (514.4ft) Condition: Culverts: Fair, Operating Rating: 81.0 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $478,000, Roadway Improvement Cost: $285,000, Total Project Cost: $763,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 107086C, Location: CITY OF TROY (Lat: 42.739969, Lng: -73.685828), Route carried "on" structure: State highway 787, Year Built: 1981, Status: Open, Structure Length: 33.28m (109.19ft), Average Daily Traffic: 55,542 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 87,018 (year 2025), Design Load: HS 20, Features Intersected: RTE 4, FIFTH AVENUE, SIX Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.163, Lanes on structure: 2, Lanes under structure: 7, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 67.0m (219.8ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.9m (39.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 87.8 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 33.28m (109.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $179,000, Roadway Improvement Cost: $107,000, Total Project Cost: $286,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 107086D, Location: CITY OF TROY (Lat: 42.739969, Lng: -73.683517), Route carried "on" structure: Ramp City street , Year Built: 1981, Status: Open, Structure Length: 2.77m (9.09ft), Average Daily Traffic: 8,000 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 10,496 , Design Load: HS 20, Features Intersected: VACANT LAND, Facility Carried by Structure: SIXTH AV TO HOOSK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Operating Rating: 92.1 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.77m (9.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $179,000, Roadway Improvement Cost: $107,000, Total Project Cost: $286,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 107086E, Location: CITY OF TROY (Lat: 42.739611, Lng: -73.685947), Route carried "on" structure: State highway 787, Year Built: 1981, Status: Open, Structure Length: 35.05m (114.99ft), Average Daily Traffic: 55,542 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 87,018 (year 2025), Design Load: HS 20, Features Intersected: RTE 4, 5TH AVENUE, 6 th Minimum Vertical Clearance: 6.52m (21.39ft), Kilometerpoint: 0.319, Lanes on structure: 2, Lanes under structure: 11, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 63.3m (207.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.0m, Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.9m (39.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 86.7 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 35.05m (114.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $9,016,000, Roadway Improvement Cost: $5,230,000, Total Project Cost: $14,246,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 107086F, Location: CITY OF TROY (Lat: 42.739781, Lng: -73.683547), Route carried "on" structure: Ramp City street , Year Built: 1981, Status: Open, Structure Length: 3.81m (12.50ft), Average Daily Traffic: 3,840 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 5,038 (year 2001), Design Load: HS 20, Features Intersected: CDTA PARKING LOT, Facility Carried by Structure: HOOSICK ST/6TH AV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 37.7m (123.7ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Fair, Superstructure: Very good, Substructure: Satisfactory, Operating Rating: 99.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.81m (12.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $9,016,000, Roadway Improvement Cost: $5,230,000, Total Project Cost: $14,246,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 200017, Location: 1.2 MI.N.JCT SH 378 & US4 (Lat: 42.720200, Lng: -73.691494), Route carried "on" structure: US , Year Built: 1886, Year Reconstructed: 1989, Status: Open, Structure Length: 2.40m (7.87ft), Average Daily Traffic: 14,327 (year 1993), Truck Traffic: 7%, Average Future Daily Traffic: 17,565 (year 2013), Design Load: HS 20, Features Intersected: POESTEN KILL, Facility Carried by Structure: County highway 4 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 325.066, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.5m (73.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Good, Channel: Satisfactory, Operating Rating: 63.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,555,000, Roadway Improvement Cost: $925,000, Total Project Cost: $2,480,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 200093, Location: VANDENBURGH AVE TROY SO (Lat: 42.703956, Lng: -73.688717), Route carried "on" structure: US 4, Year Built: 1934, Status: Open, Structure Length: 1.06m (3.48ft), Average Daily Traffic: 11,593 (year 1999), Truck Traffic: 7%, Average Future Daily Traffic: 14,213 (year 2019), Features Intersected: WYNANTS KILL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.041, Lanes on structure: 4, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 24.0m (78.7ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.3m (33.8ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Out-to-Out Width: 50.0m (164.0ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Channel: Fair, Operating Rating: 64.1 metric tons, Inventory Rating: 27.2 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.06m (3.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,149,000, Roadway Improvement Cost: $684,000, Total Project Cost: $1,833,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 200094, Location: 1.2 MI N JCT SH378 & US4 (Lat: 42.719653, Lng: -73.691611), Route carried "on" structure: US , Year Built: 1875, Year Reconstructed: 1998, Status: Open, Structure Length: 2.59m (8.50ft), Average Daily Traffic: 14,327 (year 1993), Truck Traffic: 7%, Average Future Daily Traffic: 17,565 (year 2013), Design Load: HS 25, Features Intersected: POESTEN KILL, Facility Carried by Structure: U.S.4 SOUTHBOUND Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 323.473, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Material/Design: Masonry, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 3.5m (11.5ft), Right: 3.6m (11.8ft), Curb-To-Curb Width: 11.2m (36.7ft), Out-to-Out Width: 18.4m (60.4ft) Condition: Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 82.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.59m (8.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,029,000, Roadway Improvement Cost: $612,000, Total Project Cost: $1,641,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 202465, Location: CITY OF TROY WINTER ST. (Lat: 42.701639, Lng: -73.656731), Route carried "on" structure: City street , Year Built: 1985, Status: Open, Structure Length: 2.59m (8.50ft), Average Daily Traffic: 6,782 (year 1999), Truck Traffic: 7%, Average Future Daily Traffic: 8,735 (year 2019), Design Load: HS 20, Features Intersected: WYNANTS KILL, Facility Carried by Structure: WINTER ST -CR 405 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.9m (81.7ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 12.3m (40.4ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Channel: Fair, Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.59m (8.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,888,000, Roadway Improvement Cost: $1,123,000, Total Project Cost: $3,011,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 202466, Location: 0.1 MI S JCT 66 & 2 (Lat: 42.721672, Lng: -73.675372), Route carried "on" structure: City street 66, Year Built: 1875, Year Reconstructed: 1987, Status: Open, Structure Length: 2.86m (9.38ft), Average Daily Traffic: 11,263 (year 2004), Truck Traffic: 7%, Average Future Daily Traffic: 14,507 (year 2024), Design Load: HS 20, Features Intersected: POESTEN KILL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Material/Design: Masonry, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 14.6m (47.9ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.4m (7.9ft), Curb-To-Curb Width: 12.4m (40.7ft), Out-to-Out Width: 16.9m (55.4ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Poor, Operating Rating: 83.0 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.86m (9.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,043,000, Roadway Improvement Cost: $621,000, Total Project Cost: $1,664,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 220229, Location: JCT CAMPBEL AV&WYNANTSKIL (Lat: 42.708061, Lng: -73.675700), Route carried "on" structure: City street , Year Built: 1980, Status: Open, Structure Length: 2.89m (9.48ft), Average Daily Traffic: 11,380 (year 1997), Truck Traffic: 7%, Average Future Daily Traffic: 14,657 (year 2017), Design Load: HS 20, Features Intersected: WYNANTS KILL, Facility Carried by Structure: CAMPBELL AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 20 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.0m (91.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 18.3m (60.0ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 88.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 52.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.89m (9.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,146,000, Roadway Improvement Cost: $681,000, Total Project Cost: $1,827,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 220233, Location: FIRST ST IN TROY SOUTH (Lat: 42.720347, Lng: -73.695344), Route carried "on" structure: City street , Year Built: 1900, Status: Open, Structure Length: 2.46m (8.07ft), Average Daily Traffic: 3,589 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 5,183 (year 2017), Features Intersected: POESTEN KILL, Facility Carried by Structure: FIRST STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.6m (34.8ft), Material/Design: Masonry, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 3, Length of Maximum Span: 8.8m (28.9ft), Curb or Sidewalk Widths: Left: 3.0m (9.8ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 18.2m (59.7ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Poor, Channel: Fair, Operating Rating: 46.7 metric tons, Inventory Rating: 19.5 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 2.46m (8.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $972,000, Roadway Improvement Cost: $578,000, Total Project Cost: $1,550,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 220234, Location: SECOND ST- CITY OF TROY (Lat: 42.720181, Lng: -73.694075), Route carried "on" structure: City street , Year Built: 1930, Year Reconstructed: 1989, Status: Open, Structure Length: 2.37m (7.78ft), Average Daily Traffic: 2,870 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 4,145 (year 2017), Design Load: HS 20, Features Intersected: POESTEN KILL, Facility Carried by Structure: SECOND STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.2m (72.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Satisfactory, Channel: Good, Inventory Rating: 62.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.37m (7.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $972,000, Roadway Improvement Cost: $578,000, Total Project Cost: $1,550,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 220237, Location: SPRING AVE CITY OF TROY (Lat: 42.719378, Lng: -73.684858), Route carried "on" structure: City street , Year Built: 1940, Status: Open, Structure Length: 3.71m (12.17ft), Average Daily Traffic: 5,461 (year 1997), Truck Traffic: 6%, Average Future Daily Traffic: 7,886 (year 2017), Features Intersected: POESTEN KILL, Facility Carried by Structure: SPRING AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 5 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.6m (103.7ft), Curb or Sidewalk Widths: Left: 2.6m (8.5ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 18.5m (60.7ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Fair, Channel: Good, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 3.71m (12.17ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2007, Critical Feature Inspection Date: June 2007, Bridge Improvement Cost: $1,823,000, Roadway Improvement Cost: $1,090,000, Total Project Cost: $2,913,000 ( Estimate for 2007), Deck Structure Type: Steel plate, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 220246, Location: CITY OF TROY (Lat: 42.753236, Lng: -73.676689), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 0.60m (1.97ft), Average Daily Traffic: 100 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 131 , Features Intersected: EX-BOS & MAINE RR, Facility Carried by Structure: OAKWOOD CEMETERY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.1m (16.7ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft) Condition: Culverts: Good, Operating Rating: 85.6 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.60m (1.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $76,000, Roadway Improvement Cost: $45,000, Total Project Cost: $121,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 105432, Location: JCT.1ST&2ND STE FERRY ST. (Lat: 42.727886, Lng: -73.692953), Route carried "under" structure: City street , Year Built: 1965, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 30,000 (year 1978), Truck Traffic: 7%, Features Intersected: FERRY ST RT 2 EB, Facility Carried by Structure: FIRST & SECOND ST Minimum Vertical Clearance: 4.29m (14.07ft), Kilometerpoint: 1.609, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Culvert, Length of Maximum Span: 11.8m (38.7ft) Find on map >>
Structure Number: 107086C, Location: CITY OF TROY (Lat: 42.739969, Lng: -73.685828), Route carried "under" structure: US 4, Year Built: 1981, Structure Length: 33.28m (109.19ft), Average Daily Traffic: 9,123 (year 2006), Truck Traffic: 7%, Features Intersected: RTE 4, FIFTH AVENUE, SIX, Facility Carried by Structure: RTE I787 Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 5.857, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 67.0m (219.8ft) Find on map >>
Structure Number: 107086C, Location: CITY OF TROY (Lat: 42.739969, Lng: -73.685828), Route carried "under" structure: City street , Year Built: 1981, Structure Length: 33.28m (109.19ft), Average Daily Traffic: 4,100 (year 2007), Truck Traffic: 6%, Features Intersected: RTE 4, FIFTH AVENUE, SIX, Facility Carried by Structure: RTE I787 Minimum Vertical Clearance: 12.99m (42.62ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 67.0m (219.8ft) Find on map >>
Structure Number: 107086E, Location: CITY OF TROY (Lat: 42.739611, Lng: -73.685947), Route carried "under" structure: US 4, Year Built: 1981, Structure Length: 35.05m (114.99ft), Average Daily Traffic: 9,123 (year 2006), Truck Traffic: 7%, Features Intersected: RTE 4, 5TH AVENUE, 6 th, Facility Carried by Structure: RTE I787 Minimum Vertical Clearance: 12.99m (42.62ft), Kilometerpoint: 5.825, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 63.3m (207.7ft) Find on map >>
Structure Number: 226606, Location: 0.7 MI S OF HOOSICK ST (Lat: 42.729442, Lng: -73.677597), Route carried "under" structure: City street , Year Built: 1980, Structure Length: 3.10m (10.17ft), Average Daily Traffic: 9,100 (year 1978), Truck Traffic: 7%, Features Intersected: 15th Street, Facility Carried by Structure: PEDES.BR.AT RPI Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 2.623, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.4m (99.7ft) Discuss this city on our hugely popular New York forum Back to: Troy, NY, New York, All US cities.
|
![]() |