Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Udell, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 49ft / 15.1mTotal length
  • 6,665Total average daily traffic
  • 632Total average daily truck traffic
  • 6,665Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Udell
  • No street view available for this location

New bridges in Udell, IA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21950-1959
  • 31970-1979
  • 11980-1989
  • 21990-1999
  • 22000-2009
Reconstructed bridges in Udell, IA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Satisfactory
  • 50.0%Fair
  • 16.7%Poor
  • 16.7%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 16.7%Satisfactory
  • 16.7%Fair
  • 16.7%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 16.7%Serious
  • 16.7%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 9.1%Good
  • 45.5%Satisfactory
  • 27.3%Fair
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 13811,  Location: 4.7 MI. E OF JCT. 5 (Lat: 40.739792,  Lng: -92.781083),  Route carried "on" structure: State highway 2,  Year Built: 1978,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,260 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,260 (year 2040),  Design Load: HS 20,  Features Intersected: BR DOGGETT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 276.666,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13821,  Location: 6.0 MI. E OF JCT. IA 5 (Lat: 40.739814,  Lng: -92.756267),  Route carried "on" structure: State highway 2,  Year Built: 1989,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,260 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,260 (year 2040),  Design Load: HS 20,  Features Intersected: DOSSET CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 278.763,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 14021,  Location: 069162706 (Lat: 40.747119,  Lng: -92.695631),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 940 (year 2018),  Average Future Daily Traffic: 940 (year 2039),  Design Load: HS 20,  Features Intersected: FOX RIVER,  Facility Carried by Structure: T61 (310TH AVE)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.513,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 14031,  Location: 069162204 (Lat: 40.765892,  Lng: -92.695769),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 940 (year 2018),  Average Future Daily Traffic: 940 (year 2039),  Design Load: HS 20,  Features Intersected: CENTER BRANCH FOX RIVER,  Facility Carried by Structure: OLD IA 369
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.597,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 64311,  Location: 068170205 (Lat: 40.725308,  Lng: -92.772983),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 40 (year 2014),  Average Future Daily Traffic: 40 (year 2040),  Design Load: H 20,  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.284,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 65261,  Location: 069172304 (Lat: 40.761044,  Lng: -92.781914),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 10 (year 2014),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.973,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 65281,  Location: 069172603 (Lat: 40.750619,  Lng: -92.780642),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 2014),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.447,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Serious,  Channel: Fair,  Operating Rating: 13.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 6529,  Location: 069172604 (Lat: 40.754314,  Lng: -92.781794),  Route carried "on" structure: County highway ,  Year Built: 1900,  Year Reconstructed: 1948,  Status: Closed,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 10 (year 2014),  Average Future Daily Traffic: 10 (year 2039),  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.224,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Fair,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 6537,  Location: 069173604 (Lat: 40.736592,  Lng: -92.767350),  Route carried "on" structure: County highway ,  Year Built: 1958,  Year Reconstructed: 2020,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 100 (year 2018),  Average Future Daily Traffic: 100 (year 2041),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.489,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $19,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 65981,  Location: 070163104 (Lat: 40.813983,  Lng: -92.748328),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 15 (year 2014),  Average Future Daily Traffic: 15 (year 2041),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.713,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6599,  Location: 070163105 (Lat: 40.816217,  Lng: -92.745247),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 80 (year 2018),  Average Future Daily Traffic: 80 (year 2041),  Design Load: H 15,  Features Intersected: SOAP CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.036,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 27.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.80m (41.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Udell, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.