Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Goshen, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 39ft / 12.0mTotal length
  • $386,000Total costs
  • 343,095Total average daily traffic
  • 16,342Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Goshen
  • No street view available for this location

New bridges in West Goshen, PA - historical statistics
  • New bridges - historical statistics
  • 61950-1959
  • 41960-1969
Average Bridge Daily Traffic in West Goshen, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 75.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 9923,  Location: NEAR WEST CHESTER 32C09 (Lat: 39.966400,  Lng: -75.590844),  Route carried "on" structure: State highway 3,  Year Built: 1960,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 7,929 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,565 (year 2032),  Design Load: HS 20,  Features Intersected: PAOLI PIKE,  Facility Carried by Structure: WEST CHESTER PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.642,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 10094,  Location: NEAR WEST CHESTER 32E11 (Lat: 39.956133,  Lng: -75.580492),  Route carried "on" structure: US 202,  Year Built: 1967,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 59,892 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 66,096 (year 2032),  Design Load: HS 20,  Features Intersected: WESTTOWN ROAD,  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.988,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10096,  Location: EAST WEST CHESTER 32E09 (Lat: 39.967414,  Lng: -75.581650),  Route carried "on" structure: US 202,  Year Built: 1954,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 112,872 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 75,910 (year 2032),  Design Load: HS 20,  Features Intersected: WEST CHESTER PIKE,  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.270,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $386,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10099,  Location: EAST WEST CHESTER 32D08 (Lat: 39.971033,  Lng: -75.582922),  Route carried "on" structure: US 202,  Year Built: 1954,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 112,872 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 75,910 (year 2032),  Design Load: HS 20,  Features Intersected: PAOLI PIKE (OLD US 202),  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.692,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9923,  Location: NEAR WEST CHESTER 32C09 (Lat: 39.966400,  Lng: -75.590844),  Route carried "under" structure: State highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 4,843 (year 2020),  Truck Traffic: 5%,  Features Intersected: PAOLI PIKE,  Facility Carried by Structure: WEST CHESTER PIKE
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 10094,  Location: NEAR WEST CHESTER 32E11 (Lat: 39.956133,  Lng: -75.580492),  Route carried "under" structure: State highway ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 8,174 (year 2022),  Truck Traffic: 5%,  Features Intersected: WESTTOWN ROAD,  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 6.856,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 10096,  Location: EAST WEST CHESTER 32E09 (Lat: 39.967414,  Lng: -75.581650),  Route carried "under" structure: State highway 3,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 11,402 (year 2022),  Truck Traffic: 7%,  Features Intersected: WEST CHESTER PIKE,  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 2.522,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 10096,  Location: EAST WEST CHESTER 32E09 (Lat: 39.967414,  Lng: -75.581650),  Route carried "under" structure: State highway 3,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 10,695 (year 2022),  Truck Traffic: 3%,  Features Intersected: WEST CHESTER PIKE,  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 2.414,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 10099,  Location: EAST WEST CHESTER 32D08 (Lat: 39.971033,  Lng: -75.582922),  Route carried "under" structure: State highway ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 7,208 (year 2022),  Truck Traffic: 4%,  Features Intersected: PAOLI PIKE (OLD US 202),  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.235,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 10099,  Location: EAST WEST CHESTER 32D08 (Lat: 39.971033,  Lng: -75.582922),  Route carried "under" structure: State highway ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 7,208 (year 2022),  Truck Traffic: 4%,  Features Intersected: PAOLI PIKE (OLD US 202),  Facility Carried by Structure: WEST CHESTER BYPAS
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.290,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Discuss West Goshen, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.