Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Mineral, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 92ft / 28.3mTotal length
  • $1,708,000Total costs
  • 6,694Total average daily traffic
  • 1,184Total average daily truck traffic
  • 9,993Total future (year 2041) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Mineral
  • No street view available for this location

New bridges in West Mineral, KS - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 61930-1939
  • 21960-1969
  • 11970-1979
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in West Mineral, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Very good
  • 14.3%Good
  • 14.3%Satisfactory
  • 14.3%Fair
  • 14.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Very good
  • 14.3%Satisfactory
  • 28.6%Fair
  • 14.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.4%Very good
  • 21.4%Good
  • 7.1%Satisfactory
  • 35.7%Fair
  • 14.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Good
  • 71.4%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 11029,  Location: 4.0N 0.5E OF HALLOWELL (Lat: 37.236667,  Lng: -94.983333),  Route carried "on" structure: County highway 1166,  Year Built: 1935,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 69 (year 2007),  Average Future Daily Traffic: 72 (year 2041),  Features Intersected: DEER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 11033,  Location: 3.8N OF WEST MINERAL (Lat: 37.337222,  Lng: -94.921667),  Route carried "on" structure: County highway 1168,  Year Built: 1935,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 417 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 425 (year 2041),  Features Intersected: TRIB. TO LIGHTNING CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 6.182,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 11.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $68,000
Find on map >>   Show street view

Structure Number: 11057,  Location: 1.5S 2.0W OF WEST MINERAL (Lat: 37.260278,  Lng: -94.958333),  Route carried "on" structure: County highway 1699,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 317 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 330 (year 2041),  Features Intersected: DEER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 8.983,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $60,000
Find on map >>   Show street view

Structure Number: 11058,  Location: 1.0N 2.0W WEST MINERAL (Lat: 37.298333,  Lng: -94.958333),  Route carried "on" structure: County highway 1699,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 82 (year 2007),  Average Future Daily Traffic: 90 (year 2041),  Features Intersected: PLUM CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 13.152,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 23.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $64,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $96,000
Find on map >>   Show street view

Structure Number: 111077006705,  Location: 3.0W 1.6N OF WEST MINERAL (Lat: 37.305167,  Lng: -94.976667),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Posted for load,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 30 (year 2007),  Average Future Daily Traffic: 30 (year 2041),  Features Intersected: PLUM CREEK,  Facility Carried by Structure: LOCAL RD. G-3.4
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $79,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $119,000
Find on map >>   Show street view

Structure Number: 11107740668,  Location: 3.0N 2.6W OF WEST MINERAL (Lat: 37.325000,  Lng: -94.968333),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 25 (year 2007),  Average Future Daily Traffic: 25 (year 2041),  Features Intersected: LIGHTNING CREEK,  Facility Carried by Structure: LOCAL RD. 2-G.4
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $390,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11107940682,  Location: 4.0S 1.7W OF MINERAL (Lat: 37.223333,  Lng: -94.950333),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 30 (year 2004),  Average Future Daily Traffic: 30 (year 2041),  Features Intersected: TRIB. TO CHERRY CREEK,  Facility Carried by Structure: LOCAL RD. 9-H.4
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $52,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $78,000
Find on map >>   Show street view

Structure Number: 111081006823,  Location: 2.8N OF SHERWIN (Lat: 37.218667,  Lng: -94.940583),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 30 (year 2007),  Average Future Daily Traffic: 30 (year 2041),  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: LOCAL RD. I-9.2
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 12.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $205,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11108350676,  Location: 1.0S 0.4E OF WEST MINERAL (Lat: 37.266667,  Lng: -94.914250),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 25 (year 2007),  Average Future Daily Traffic: 25 (year 2041),  Features Intersected: TRIB. TO CHERRY CREEK,  Facility Carried by Structure: LOCAL RD. 6-J.4
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Serious,  Channel: Fair,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $150,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 11108350678,  Location: 2.0S 4.5W OF ROSELAND (Lat: 37.252167,  Lng: -94.913611),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 3.13m (10.27ft),  Average Daily Traffic: 25 (year 2007),  Average Future Daily Traffic: 25 (year 2041),  Design Load: HS 20,  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: LOCAL RD. 7-J.5
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $267,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 111085006769,  Location: 0.6N 4.0W OF SKIDMORE (Lat: 37.254417,  Lng: -94.904944),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 30 (year 2006),  Average Future Daily Traffic: 35 (year 2041),  Design Load: HS 20,  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: LOCAL RD. K-6.9
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11108520676,  Location: 1.0S 1.2E OF WEST MINERAL (Lat: 37.266667,  Lng: -94.900000),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 30 (year 2007),  Average Future Daily Traffic: 35 (year 2041),  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: LOCAL RD. 6-K.2
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $275,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 999910200110841,  Location: 3.08 MI W K-7 (Lat: 37.281389,  Lng: -94.888333),  Route carried "on" structure: State highway 102,  Year Built: 1992,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 739 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 902 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE CHERRY CREEK DRG
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 3.080,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.29m (46.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999940000110901,  Location: 7.68 MI E LABETTE COLN (Lat: 37.340000,  Lng: -94.935278),  Route carried "on" structure: US 400,  Year Built: 1994,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 4,845 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 7,939 (year 2041),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK DRAINAGE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 12.379,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 51.5m (169.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss West Mineral, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.