Bridge Statistics for Westport, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 335ft / 102mTotal length
  • $88,005,000Total costs
  • 343,188Total average daily traffic
  • 10,079Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Westport
  • No street view available for this location

New bridges in Westport, MA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 11950-1959
  • 181960-1969
  • 12000-2009
Reconstructed bridges in Westport, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Westport, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.8%Good
  • 50.0%Satisfactory
  • 31.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 18.8%Good
  • 43.8%Satisfactory
  • 31.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: D040123XCDOTNBI,  Location: AT WESTPORT TL (Lat: 41.658406,  Lng: -71.057889),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 1,428 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,738 (year 2032),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY HIGHLAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,603,000,  Roadway Improvement Cost: $461,000,  Total Project Cost: $6,905,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W30002AQQMUNNBI,  Location: .7 MI E OF RTE 88 (Lat: 41.570183,  Lng: -71.071714),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 3,011 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 11,845 (year 2031),  Design Load: HS 20,  Features Intersected: WATER E BR WESTPORT RIV,  Facility Carried by Structure: HWY HIXBRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.5m (34.4ft),  Navigation Control: Yes ( Vertical Clearance: 2.2m (7.2ft), Horizontal Clearance: 16.0m (52.5ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 17.5m (57.4ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.80m (35.43ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $2,953,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $4,430,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W300033KJMUNNBI,  Location: .9 MI E OF RTE 88 (Lat: 41.620956,  Lng: -71.059758),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 8,664 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,056 (year 2031),  Design Load: H 20,  Features Intersected: WATER E BR WESTPORT RIV,  Facility Carried by Structure: HWY OLD CNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.674,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $496,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W300043M3MUNNBI,  Location: .3 MI S OF RTE 177 (Lat: 41.631283,  Lng: -71.054006),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1967,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 857 (year 2022),  Average Future Daily Traffic: 3,159 (year 2031),  Design Load: H 20,  Features Intersected: WATER E BR WESTPORT RIV,  Facility Carried by Structure: HWY FORGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2022,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W300123W5DOTNBI,  Location: 1.1 MI E OF ST 88 (Lat: 41.634125,  Lng: -71.062789),  Route carried "on" structure: State highway 177,  Year Built: 1941,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 6,178 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,320 (year 2031),  Design Load: H 20,  Features Intersected: WATER BREAD CHEESE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 83.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.10m (0.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $58,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $88,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W300143W4DOTNBI,  Location: .3 MI SW OF US 6 (Lat: 41.636183,  Lng: -71.049450),  Route carried "on" structure: State highway 177,  Year Built: 1941,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 10,345 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,741 (year 2033),  Design Load: H 20,  Features Intersected: WATER E BR WESTPORT RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $1,015,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,523,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W300163W6DOTNBI,  Location: .8 MI S OF DRIFT RD. (Lat: 41.517253,  Lng: -71.067950),  Route carried "on" structure: State highway 88,  Year Built: 1958,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 31.24m (102.49ft),  Average Daily Traffic: 6,500 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,845 (year 2031),  Design Load: HS 20,  Features Intersected: WATER WESTPORT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.1m (20.0ft), Horizontal Clearance: 15.2m (49.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 13,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 31.30m (102.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $26,926,000,  Roadway Improvement Cost: $2,693,000,  Total Project Cost: $40,390,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W300233W7DOTNBI,  Location: 1.5 MI. S. OF US 6 (Lat: 41.633131,  Lng: -71.078811),  Route carried "on" structure: State highway 88,  Year Built: 1961,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 9,083 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,162 (year 2032),  Design Load: H 20,  Features Intersected: ST177 AMERICAN LGN HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.856,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,344,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $3,517,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W300253UDDOTNBI,  Location: .6 MI E OF FALL RIVER C.L (Lat: 41.679678,  Lng: -71.107544),  Route carried "on" structure: Interstate 195,  Year Built: 1964,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 34,181 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 48,958 (year 2031),  Design Load: HS 20,  Features Intersected: HWY SANFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.701,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,620,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $3,931,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W300253UEDOTNBI,  Location: .6 MI E OF FALL RIVER C.L (Lat: 41.680019,  Lng: -71.107253),  Route carried "on" structure: Interstate 195,  Year Built: 1964,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 29,874 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48,958 (year 2031),  Design Load: HS 20,  Features Intersected: HWY SANFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.701,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $846,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,270,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: W300263WBDOTNBI,  Location: .6 MI N OF US 6 (Lat: 41.673467,  Lng: -71.090408),  Route carried "on" structure: Ramp State highway 88,  Year Built: 1964,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 8,293 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,741 (year 2032),  Design Load: H 20,  Features Intersected: I 195
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,146,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $4,720,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W300283UADOTNBI,  Location: .7 MI W OF DARTMOUTH T.L. (Lat: 41.662133,  Lng: -71.069319),  Route carried "on" structure: Interstate 195,  Year Built: 1965,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 37,379 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 47,853 (year 2031),  Design Load: HS 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.485,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $604,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $907,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W300283UBDOTNBI,  Location: .7 MI W OF DARTMOUTH T.L. (Lat: 41.662106,  Lng: -71.068594),  Route carried "on" structure: Interstate 195,  Year Built: 1965,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 38,304 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 47,853 (year 2031),  Design Load: HS 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.485,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $604,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $907,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W300303WADOTNBI,  Location: .4 MI S OF I 195 (Lat: 41.668083,  Lng: -71.092828),  Route carried "on" structure: State highway 88,  Year Built: 1964,  Status: Open,  Structure Length: 1.41m (4.63ft),  Average Daily Traffic: 22,743 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 41,062 (year 2032),  Design Load: H 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 36.5m (119.8ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 36.1m (118.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,128,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $3,193,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Other
Find on map >>   Show street view

Structure Number: W300313W8DOTNBI,  Location: .5 MI S OF I 195 (Lat: 41.666158,  Lng: -71.093111),  Route carried "on" structure: State highway 88,  Year Built: 1964,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 7,299 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 29,375 (year 2032),  Design Load: HS 20,  Features Intersected: US 6 STATE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.760,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,656,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $5,485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: W300313W9DOTNBI,  Location: .5 MI S OF I 195 (Lat: 41.666356,  Lng: -71.093444),  Route carried "on" structure: State highway 88,  Year Built: 1964,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 11,133 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,269 (year 2032),  Design Load: HS 20,  Features Intersected: US 6 STATE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.739,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,656,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $5,485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: W300323UCDOTNBI,  Location: 195 WB RAMP TO 88SB (Lat: 41.674958,  Lng: -71.094686),  Route carried "on" structure: Ramp Interstate 195,  Year Built: 1964,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 5,392 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,001 (year 2032),  Design Load: H 20,  Features Intersected: I 195
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,703,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $4,055,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: D040123XCDOTNBI,  Location: AT DARTMOUTH T.L. (Lat: 41.666667,  Lng: -71.083333),  Route carried "under" structure: Interstate 195,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 33,369 (year 0000),  Features Intersected: I 195 EB,  Facility Carried by Structure: HWY DAVIS RD.
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: D040123XCDOTNBI,  Location: 083089 STATUTORY (Lat: 41.666667,  Lng: -71.083333),  Route carried "under" structure: Interstate 195,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 33,369 (year 0000),  Features Intersected: I 195 WB,  Facility Carried by Structure: HWY DAVIS RD.
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: W300263WBDOTNBI,  Location: .6 MI N OF US 6 (Lat: 41.666667,  Lng: -71.083333),  Route carried "under" structure: Interstate 195,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,609 (year 0000),  Features Intersected: I 195 EB,  Facility Carried by Structure: ST 88 RAMP
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: W300263WBDOTNBI,  Location: .6 MI N OF US 6 (Lat: 41.683333,  Lng: -71.083333),  Route carried "under" structure: Interstate 195,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,609 (year 0000),  Features Intersected: I 195 WB,  Facility Carried by Structure: ST 88 RAMP
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: W300323UCDOTNBI,  Location: 1.4 MI E OF FALL RIV C.L. (Lat: 41.666667,  Lng: -71.100000),  Route carried "under" structure: Interstate 195,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,284 (year 0000),  Features Intersected: I 195 EB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: W300323UCDOTNBI,  Location: 1.4 MI E OF FALL RIV C.L. (Lat: 41.666667,  Lng: -71.100000),  Route carried "under" structure: Interstate 195,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,284 (year 0000),  Features Intersected: I 195 WB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss Westport, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.