Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Yarmouth, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 115ft / 34.9mTotal length
  • $24,840,000Total costs
  • 225,565Total average daily traffic
  • 11,875Total average daily truck traffic
  • 388,350Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Yarmouth
  • No street view available for this location

New bridges in Yarmouth, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31950-1959
  • 31960-1969
  • 31970-1979
  • 12020-2022
Reconstructed bridges in Yarmouth, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Yarmouth, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 40.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 27.3%Good
  • 27.3%Satisfactory
  • 36.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: B130201EEMUNNBI,  Location: 1 M SE OF BLACKSTONE ST (Lat: 42.048917,  Lng: -71.520211),  Route carried "on" structure: City street ,  Year Built: 1880,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,021 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,317 (year 2033),  Features Intersected: WATER MILL RIVER,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $677,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: Y01002BNFDOTNBI,  Location: 2 MI W OF DENNIS TL (Lat: 41.649097,  Lng: -70.223425),  Route carried "on" structure: State highway 28,  Year Built: 2021,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 26,508 (year 2021),  Truck Traffic: 3%,  Design Load: HL 93,  Features Intersected: WATER PARKERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: Y01005474DOTNBI,  Location: 4.0 M E OF RTE 132 (Lat: 41.687381,  Lng: -70.257128),  Route carried "on" structure: US 6,  Year Built: 1953,  Year Reconstructed: 1997,  Status: Temporarily open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 25,900 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 67,910 (year 2032),  Design Load: H 20,  Features Intersected: COMB WILLOW ST & MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.377,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,229,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $4,844,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: Y01005475DOTNBI,  Location: 4.0 M E OF RTE 132 (Lat: 41.687044,  Lng: -70.257225),  Route carried "on" structure: US 6,  Year Built: 1966,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 27,179 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 67,910 (year 2032),  Design Load: H 20,  Features Intersected: COMB WILLOW ST & MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.377,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,552,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $5,329,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: Y0100647ADOTNBI,  Location: 2.3 M E OF WILLOW ST (Lat: 41.690319,  Lng: -70.214742),  Route carried "on" structure: US 6,  Year Built: 1954,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 39,369 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 39,482 (year 2032),  Design Load: H 20,  Features Intersected: HWY UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.603,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.7m (64.6ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,140,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,711,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: Y010074BFDOTNBI,  Location: 3.8 M E OF WILLOW ST (Lat: 41.691881,  Lng: -70.183742),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 5.29m (17.36ft),  Average Daily Traffic: 7,142 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,952 (year 2032),  Design Load: H 20,  Features Intersected: US 6 MID CAPE HWY,  Facility Carried by Structure: HWY N DENNIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,499,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $3,749,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: Y0101247BDOTNBI,  Location: 2.3 M E OF WILLOW ST (Lat: 41.689986,  Lng: -70.214378),  Route carried "on" structure: US 6,  Year Built: 1970,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 39,400 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 39,482 (year 2032),  Design Load: H 20,  Features Intersected: HWY UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.635,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,236,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,855,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: Y01013478DOTNBI,  Location: 1.8 M E OF WILLOW ST (Lat: 41.689206,  Lng: -70.221936),  Route carried "on" structure: US 6,  Year Built: 1970,  Status: Open,  Structure Length: 2.05m (6.73ft),  Average Daily Traffic: 24,404 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 78,649 (year 2032),  Design Load: H 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.008,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.0m (62.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,073,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,610,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: Y01014479DOTNBI,  Location: 1.8 M E OF WILLOW ST (Lat: 41.689622,  Lng: -70.222847),  Route carried "on" structure: US 6,  Year Built: 1971,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 17,442 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 41,062 (year 2032),  Design Load: H 20,  Features Intersected: RR MACRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 118.911,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $511,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: Y01015477DOTNBI,  Location: 1.5 M E OF WILLOW ST (Lat: 41.687261,  Lng: -70.228922),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 2.75m (9.02ft),  Average Daily Traffic: 8,100 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,793 (year 2031),  Design Load: H 20,  Features Intersected: US 6 EB/MID CAPE HWY,  Facility Carried by Structure: HWY W YARMTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.829,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.7m (87.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,518,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $2,278,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: Y01016476DOTNBI,  Location: 1.5 M E OF WILLOW ST (Lat: 41.687919,  Lng: -70.229131),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 2.75m (9.02ft),  Average Daily Traffic: 8,100 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,793 (year 2032),  Design Load: H 20,  Features Intersected: US 6 WB/MID CAPE HWY,  Facility Carried by Structure: HWY W YARMTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.829,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.6m (87.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,517,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $2,276,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Yarmouth, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.