Old 01-19-2010, 10:58 AM
 
Location: San Antonio
1,314 posts, read 3,178,695 times
Reputation: 848

Advertisements

Here's what I wrote about this project on my blog; it should answer most of the questions posed above:
I just got home from TxDOT’s public hearing on their long-planned improvements to I-10 West. As I mentioned earlier this week, my recollection was that the proposed changes would include adding an extra freeway lane in each direction and removing the existing outbound DeZavala exit. That indeed still forms the core of the improvements package, but there were a few other goodies.

First of all, there will actually be a fifth lane added to the inbound side from Loop 1604 down to the Huebner exit. This means that traffic entering I-10 from 1604 will have all the way to Huebner to merge over if necessary, and in fact one of the two lanes added at 1604 (the one that drops at the DeZavala exit now) will continue through all the way to downtown. This will greatly smooth inbound traffic.

As mentioned, the existing exit to DeZavala on the outbound side will be removed and the existing Woodstone exit will be widened to two lanes and will become the DeZavala exit. The existing entrance from Huebner will also be removed and the existing entrance from Fredericksburg (the one at the top of the hill in front of Chili’s) will become the entrance for both Huebner and Fred. An extra lane will be added to the frontage road, making for smoother merging and transitions there. These changes will eliminate several bad problems: the dangerous weaving that takes place on the frontage road at the current DeZavala exit and the equally dangerous and congestion-inducing weaving that takes place on the freeway lanes at the existing entrance from Huebner.

On the outbound freeway lanes, the four lanes that currently exist north of Wurzbach will be extended all the way to Loop 1604 instead of dropping down to three at the DeZavala exit as is the case today. At Loop 1604, the right lane will exit to 1604 along with the auxiliary lane added from the entrance from UTSA Blvd. This will eliminate that afternoon rush-hour bottleneck.

In addition to the lane and ramp changes mentioned above, this project will also add the “missing” turnaround at UTSA Blvd., will raise the I-10 overpass over DeZavala (it’s been hit several times), will replace one of the bridge decks on I-10 at Fredericksburg to resolve a long-standing maintenance issue, and repave the whole stretch of I-10 (also long overdue.)

This project, which is estimated will cost $40 million, does not have any funding yet. However, TxDOT is updating its plans and environmental documents so that this project is ready to go if funding should become available. Just like with the recent Wurzbach Parkway project, which was able to take advantage of newly-available Prop 12 funds because TxDOT kept their ducks in a row on that project, officials want to make sure that this long-proposed and badly-needed project is ready to get either additional Prop 12 funds, which could become available later this year or next, or be in line to receive any stimulus funds that may be leftover as a result of cost underruns or if any projects fail to make the deadline for those funds (March 2010). My gut-feeling is that this project will be funded by this fall.

And, the question that seems to be first on everyone’s minds: this will not be a toll project.
Reply With Quote Quick reply to this message

 
Old 01-19-2010, 12:29 PM
 
436 posts, read 1,614,254 times
Reputation: 166
thanks for the update.

sounds like it will be wonderful once it is completed. the construction, on the otherhand, sounds like a nightmare.
Reply With Quote Quick reply to this message
 
Old 01-19-2010, 01:42 PM
 
Location: San Antonio
1,314 posts, read 3,178,695 times
Reputation: 848
Quote:
Originally Posted by needsomeinfo View Post
the construction, on the otherhand, sounds like a nightmare.
Unfortunately, it almost always is.
Reply With Quote Quick reply to this message
 
Old 01-19-2010, 02:18 PM
 
56 posts, read 115,785 times
Reputation: 27
Thanks for the update, very in depth. I do not mind the short term inconvenience, this will be a huge improvement to the traffic problems here.
Reply With Quote Quick reply to this message
 
Old 01-19-2010, 02:58 PM
 
1,448 posts, read 1,187,925 times
Reputation: 1268
Quote:
Originally Posted by TexHwyMan View Post
This project, which is estimated will cost $40 million, does not have any funding yet.
Seems like an awful lot of construction for only $40 million.
Reply With Quote Quick reply to this message
Please register to post and access all features of our very popular forum. It is free and quick. Over $68,000 in prizes has already been given out to active posters on our forum. Additional giveaways are planned.

Detailed information about all U.S. cities, counties, and zip codes on our site: City-data.com.


Reply
Please update this thread with any new information or opinions. This open thread is still read by thousands of people, so we encourage all additional points of view.

Quick Reply
Message:


Settings
X
Data:
Loading data...
Based on 2000-2020 data
Loading data...

123
Hide US histogram


Over $104,000 in prizes was already given out to active posters on our forum and additional giveaways are planned!

Go Back   City-Data Forum > U.S. Forums > Texas > San Antonio
Similar Threads
View detailed profiles of:

All times are GMT -6. The time now is 05:37 PM.

© 2005-2024, Advameg, Inc. · Please obey Forum Rules · Terms of Use and Privacy Policy · Bug Bounty

City-Data.com - Contact Us - Archive 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37 - Top