Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ackley, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 322ft / 98.0mTotal length
  • 29,540Total average daily traffic
  • 8,703Total average daily truck traffic
  • 29,850Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ackley
  • No street view available for this location

New bridges in Ackley, IA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 91950-1959
  • 61960-1969
  • 41970-1979
  • 41980-1989
  • 61990-1999
  • 42000-2009
  • 72010-2019
  • 22020-2022
Reconstructed bridges in Ackley, IA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 01980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Ackley, IA
Average Bridge Truck Traffic in Ackley, IA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.6%Excellent
  • 15.8%Very good
  • 28.9%Good
  • 26.3%Satisfactory
  • 18.4%Fair
  • 7.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.6%Excellent
  • 23.7%Very good
  • 26.3%Good
  • 28.9%Satisfactory
  • 15.8%Fair
  • 2.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.6%Excellent
  • 28.9%Very good
  • 21.1%Good
  • 23.7%Satisfactory
  • 5.3%Fair
  • 5.3%Poor
  • 13.2%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.3%Excellent
  • 20.9%Very good
  • 25.6%Good
  • 34.9%Satisfactory
  • 11.6%Fair
  • 4.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 16.7%Good
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 2703,  Location: 1.6 MILES WEST OF SR S56 (Lat: 42.556717,  Lng: -93.087194),  Route carried "on" structure: State highway 57,  Year Built: 1960,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1,440 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,440 (year 2040),  Design Load: H 20,  Features Intersected: W BRANCH CEDAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.534,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27041,  Location: 1.0 MI. E OF W JCT SR S56 (Lat: 42.556778,  Lng: -93.047706),  Route carried "on" structure: State highway 57,  Year Built: 2013,  Status: Open,  Structure Length: 11.37m (37.30ft),  Average Daily Traffic: 1,440 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,440 (year 2040),  Design Load: HL 93,  Features Intersected: CC RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.777,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3485,  Location: 1.0 mi. W of Jct. SR P-53 (Lat: 41.502417,  Lng: -94.210228),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 22,200 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 22,200 (year 2040),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.114,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 8718,  Location: 090180702 (Lat: 42.618431,  Lng: -93.026608),  Route carried "on" structure: County highway ,  Year Built: 1965,  Year Reconstructed: 1984,  Status: Posted for load,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 40 (year 2013),  Average Future Daily Traffic: 40 (year 2041),  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.841,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $30,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 87241,  Location: 090181602 (Lat: 42.609700,  Lng: -92.986539),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 30 (year 2041),  Design Load: HS 20,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 87251,  Location: 090181702 (Lat: 42.604753,  Lng: -93.006153),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 60 (year 2021),  Average Future Daily Traffic: 60 (year 2041),  Design Load: H 15,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.524,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.70m (41.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8726,  Location: 090181801 (Lat: 42.615175,  Lng: -93.025886),  Route carried "on" structure: County highway ,  Year Built: 1941,  Year Reconstructed: 2002,  Status: Posted for load-capacity,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 25 (year 2013),  Average Future Daily Traffic: 25 (year 2041),  Design Load: HS 20,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.063,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 873,  Location: 090181902 (Lat: 42.591314,  Lng: -93.026803),  Route carried "on" structure: County highway ,  Year Built: 1949,  Status: Posted for load,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 90 (year 2013),  Average Future Daily Traffic: 90 (year 2041),  Design Load: H 15,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.830,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 24.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8737,  Location: 090182802 (Lat: 42.572658,  Lng: -92.986689),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 40 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 40 (year 2041),  Design Load: H 15,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.772,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Operating Rating: 9.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 14.80m (48.56ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $49,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 87401,  Location: 090183104 (Lat: 42.563556,  Lng: -93.026886),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH BEAVER CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.748,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.40m (50.52ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15624,  Location: 090191502 (Lat: 42.612656,  Lng: -93.086211),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 25 (year 2021),  Average Future Daily Traffic: 25 (year 2040),  Design Load: H 15,  Features Intersected: N BEAVER CREEK,  Facility Carried by Structure: VINE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.984,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $186,000,  Roadway Improvement Cost: $25,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156251,  Location: 090191601 (Lat: 42.615217,  Lng: -93.086719),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 25 (year 2013),  Average Future Daily Traffic: 25 (year 2038),  Design Load: HS 20,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL 60TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.745,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 15626,  Location: 090191601 (Lat: 42.615283,  Lng: -93.088942),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 25 (year 2013),  Average Future Daily Traffic: 25 (year 2040),  Design Load: H 15,  Features Intersected: NORTH BEAVER CREEK,  Facility Carried by Structure: LOCAL 60TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.563,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156311,  Location: 90192102 (Lat: 42.590344,  Lng: -93.105419),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 10 (year 2013),  Average Future Daily Traffic: 10 (year 2040),  Features Intersected: SMALL STREAM,  Facility Carried by Structure: TIMBER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.108,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 156331,  Location: 090192201 (Lat: 42.600344,  Lng: -93.073606),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 35 (year 2021),  Average Future Daily Traffic: 35 (year 2041),  Design Load: H 15,  Features Intersected: N BEAVER CREEK,  Facility Carried by Structure: FM (50TH ST)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.667,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $30,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156341,  Location: 090192601 (Lat: 42.583369,  Lng: -93.066186),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 35 (year 2013),  Average Future Daily Traffic: 35 (year 2040),  Design Load: HL 93,  Features Intersected: NORTH BEAVER CREEK,  Facility Carried by Structure: WARBLER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.953,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156351,  Location: 090192604 (Lat: 42.583656,  Lng: -93.056378),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 520 (year 2021),  Average Future Daily Traffic: 520 (year 2041),  Design Load: HS 20,  Features Intersected: N BEAVER CREEK,  Facility Carried by Structure: FM WREN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.182,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.50m (37.73ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $52,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156361,  Location: 090192701 (Lat: 42.585733,  Lng: -93.067267),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 35 (year 2013),  Average Future Daily Traffic: 35 (year 2038),  Design Load: HL 93,  Features Intersected: NORTH BEAVER CREEK,  Facility Carried by Structure: 40TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.708,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156371,  Location: 090192801 (Lat: 42.585853,  Lng: -93.097181),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 30 (year 2040),  Design Load: H 15,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL 40TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.252,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156395,  Location: 090192804 (Lat: 42.575194,  Lng: -93.095961),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 45 (year 2013),  Average Future Daily Traffic: 45 (year 2040),  Design Load: H 20,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: LOCAL TULIP AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.058,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $11,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1564,  Location: 090192804 (Lat: 42.584764,  Lng: -93.095664),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 45 (year 2013),  Average Future Daily Traffic: 45 (year 2040),  Design Load: H 15,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL TULIP AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.130,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $50,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156411,  Location: 90192904 (Lat: 42.575539,  Lng: -93.125083),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 30 (year 2038),  Design Load: HL 93,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: THRUSH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.087,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 156441,  Location: 090193202 (Lat: 42.564847,  Lng: -93.125106),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 30 (year 2038),  Design Load: HS 20,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: THRUSH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $7,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156451,  Location: 090193401 (Lat: 42.571208,  Lng: -93.075372),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 45 (year 2017),  Truck Traffic: 27%,  Average Future Daily Traffic: 45 (year 2040),  Design Load: H 15,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: LOCAL 30TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.585,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $25,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 156461,  Location: 090193504 (Lat: 42.563375,  Lng: -93.066022),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 130 (year 2017),  Truck Traffic: 28%,  Average Future Daily Traffic: 130 (year 2040),  Design Load: H 20,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.732,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.80m (41.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $305,000,  Roadway Improvement Cost: $50,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16097,  Location: 070410802 (Lat: 40.873428,  Lng: -95.594589),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1963,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 10 (year 2016),  Truck Traffic: 17%,  Average Future Daily Traffic: 320 (year 2041),  Design Load: H 15,  Features Intersected: DRISCOLL CREEK,  Facility Carried by Structure: 310 AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.589,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 166171,  Location: 089180702 (Lat: 42.537347,  Lng: -93.026883),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 20 (year 2017),  Average Future Daily Traffic: 20 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH BEAVER CREEK,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.171,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16624,  Location: 089181702 (Lat: 42.521989,  Lng: -93.006692),  Route carried "on" structure: County highway ,  Year Built: 1957,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 45 (year 2017),  Average Future Daily Traffic: 45 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH BEAVER CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.725,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 166251,  Location: 089181801 (Lat: 42.528847,  Lng: -93.023272),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 100 (year 2017),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: BR BEAVER CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 16626,  Location: 089181801 (Lat: 42.528878,  Lng: -93.018289),  Route carried "on" structure: County highway ,  Year Built: 1952,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 100 (year 2017),  Average Future Daily Traffic: 100 (year 2041),  Features Intersected: MIDDLE FORK BEAVER CREEK,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 6.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $19,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 166281,  Location: 089181802 (Lat: 42.526550,  Lng: -93.026786),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 15 (year 2017),  Average Future Daily Traffic: 15 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH BEAVER CREEK,  Facility Carried by Structure: A AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.972,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16629,  Location: 089182001 (Lat: 42.514350,  Lng: -93.005464),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 80 (year 2021),  Average Future Daily Traffic: 80 (year 2040),  Design Load: H 15,  Features Intersected: BEAVER CREEK ,BRANCH,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.746,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1663,  Location: 089182001 (Lat: 42.514339,  Lng: -92.996483),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 80 (year 2021),  Average Future Daily Traffic: 80 (year 2041),  Design Load: H 15,  Features Intersected: BEAVER CREEK ,BRANCH,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.485,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $16,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 166311,  Location: 089182001 (Lat: 42.514333,  Lng: -92.993086),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 80 (year 2021),  Average Future Daily Traffic: 80 (year 2040),  Design Load: H 20,  Features Intersected: BEAVER CREEK ,BRANCH,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.763,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 176501,  Location: 089191203 (Lat: 42.543325,  Lng: -93.031719),  Route carried "on" structure: County highway ,  Year Built: 1960,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 70 (year 2021),  Average Future Daily Traffic: 70 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.254,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 176511,  Location: 089192602 (Lat: 42.493761,  Lng: -93.066036),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 30 (year 2013),  Average Future Daily Traffic: 30 (year 2039),  Design Load: H 20,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.123,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 176561,  Location: 089193501 (Lat: 42.485617,  Lng: -93.063969),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 70 (year 2021),  Average Future Daily Traffic: 70 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.027,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.0m,  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 32758,  Location: 068083003 (Lat: 40.660678,  Lng: -91.825556),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 10 (year 2014),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.203,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Poor,  Operating Rating: 9.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 6.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $16,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 35619,  Location: 099212202 (Lat: 43.382267,  Lng: -93.320181),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 20 (year 2013),  Average Future Daily Traffic: 20 (year 2041),  Features Intersected: ELK CREEK,  Facility Carried by Structure: JONQUIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.233,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 18.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $25,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 365125,  Location: 089182002 (Lat: 42.512414,  Lng: -93.006825),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 40 (year 2017),  Average Future Daily Traffic: 40 (year 2039),  Design Load: HS 20,  Features Intersected: TRIB TO BEAVER CREEK,  Facility Carried by Structure: B AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.663,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $5,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Ackley, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.