Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Alabaster, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 51Number of bridges
  • 531ft / 162mTotal length
  • $69,275,000Total costs
  • 767,166Total average daily traffic
  • 116,066Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Alabaster
  • No street view available for this location

New bridges in Alabaster, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 11940-1949
  • 141950-1959
  • 11960-1969
  • 91970-1979
  • 31980-1989
  • 41990-1999
  • 122000-2009
  • 32010-2019
Reconstructed bridges in Alabaster, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 21970-1979
  • 11980-1989
Average Bridge Daily Traffic in Alabaster, AL
Average Bridge Truck Traffic in Alabaster, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 12.5%Good
  • 41.7%Satisfactory
  • 29.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 29.2%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Very good
  • 41.7%Good
  • 38.9%Satisfactory
  • 13.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 38.1%Good
  • 47.6%Satisfactory
  • 4.8%Fair
Find on map >>   Show street view

Structure Number: 20121,  Location: SUBDIVISION (Lat: 33.182606,  Lng: -86.819317),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 280 (year 2040),  Design Load: HS 20,  Features Intersected: UT TO SPRING CK,  Facility Carried by Structure: GOLDEN MEADOWS DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $851,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20237,  Location: 0.5 MI NO. CR 26 (Lat: 33.257792,  Lng: -86.936928),  Route carried "on" structure: County highway 17,  Year Built: 2011,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 7,730 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,485 (year 2042),  Design Load: HS 20,  Features Intersected: BEAVERDAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $617,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $679,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20465,  Location: 0.3 MI. NORTH CR 68 (Lat: 33.261125,  Lng: -86.795403),  Route carried "on" structure: County highway 11,  Year Built: 2013,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 12,213 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,309 (year 2041),  Design Load: HS 20,  Features Intersected: PEAVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,787,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $1,966,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20815,  Location: .4MI W. JCT. ST. 119 (Lat: 33.223842,  Lng: -86.829658),  Route carried "on" structure: County highway 264,  Year Built: 2016,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 8,714 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,948 (year 2040),  Design Load: HS 20,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,145,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $2,360,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6491,  Location: I 65 * CO RD 26 (Lat: 33.214656,  Lng: -86.800503),  Route carried "under" structure: County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 631 (year 2021),  Truck Traffic: 16%,  Features Intersected: CO RD 26,  Facility Carried by Structure: I - 65 SOUTH
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 6492,  Location: I 65 * CO RD 26 (Lat: 33.214444,  Lng: -86.799722),  Route carried "under" structure: Business County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 526 (year 2021),  Truck Traffic: 16%,  Features Intersected: CO RD 26,  Facility Carried by Structure: I - 65 NORTH
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 6493,  Location: 3 . 5 MI N JCT CO RD 87 (Lat: 33.218611,  Lng: -86.802500),  Route carried "under" structure: Alternate County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 16%,  Features Intersected: L * N RR * CO RD 87,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 7.21m (23.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 6494,  Location: 3 . 5 MI N JCT CO RD 87 (Lat: 33.218611,  Lng: -86.802500),  Route carried "under" structure: Alternate City street ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 510 (year 2002),  Truck Traffic: 16%,  Features Intersected: L & N RR / OLD US 31,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 7.21m (23.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 11184,  Location: US 31 * I 65 @ ALABASTER (Lat: 33.230469,  Lng: -86.806806),  Route carried "under" structure: Interstate 65,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 77,840 (year 2021),  Truck Traffic: 17%,  Features Intersected: I - 65,  Facility Carried by Structure: AL - 3 (US 31)
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 383.619,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 11356,  Location: I 65 * SHELBY CO RD 11 (Lat: 33.258378,  Lng: -86.799328),  Route carried "under" structure: Interstate 65,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 77,840 (year 2020),  Truck Traffic: 17%,  Features Intersected: I65,  Facility Carried by Structure: CO RD 11
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 386.803,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Alabaster, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.