Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Angola, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 80Number of bridges
  • 745ft / 227mTotal length
  • 396,938Total average daily traffic
  • 97,324Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Angola
  • No street view available for this location

New bridges in Angola, IN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 121950-1959
  • 401960-1969
  • 71970-1979
  • 31980-1989
  • 11990-1999
  • 52000-2009
  • 72010-2019
  • 12020-2022
Reconstructed bridges in Angola, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 71990-1999
  • 102000-2009
  • 42010-2019
Average Bridge Daily Traffic in Angola, IN
Average Bridge Truck Traffic in Angola, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.3%Excellent
  • 20.5%Very good
  • 45.5%Good
  • 20.5%Satisfactory
  • 11.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.6%Very good
  • 40.0%Good
  • 31.1%Satisfactory
  • 11.1%Fair
  • 2.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.3%Very good
  • 48.9%Good
  • 31.1%Satisfactory
  • 2.2%Fair
  • 4.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 40.0%Good
  • 36.0%Satisfactory
  • 4.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 7600017,  Location: 0.70 MILES N OF CR 400 S (Lat: 41.596389,  Lng: -84.975531),  Route carried "on" structure: Alternate City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 52 (year 2021),  Average Future Daily Traffic: 73 (year 2041),  Design Load: HS 20,  Features Intersected: PIGEON CREEK,  Facility Carried by Structure: S BILL DELLER Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7600028,  Location: 0.10 MILES N OF CR 200 S (Lat: 41.613611,  Lng: -85.076469),  Route carried "on" structure: Alternate County highway 131,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 56 (year 2021),  Average Future Daily Traffic: 79 (year 2041),  Design Load: HS 20,  Features Intersected: PIGEON CREEK,  Facility Carried by Structure: CR 450W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 760003,  Location: 0.30 MILES N OF US 20 (Lat: 41.646669,  Lng: -85.160319),  Route carried "on" structure: Alternate County highway 1,  Year Built: 1966,  Status: Open,  Structure Length: 2.34m (7.68ft),  Average Daily Traffic: 719 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,004 (year 2041),  Design Load: H 20,  Features Intersected: PIGEON CREEK,  Facility Carried by Structure: CR 900W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7600034,  Location: 0.10 MILES E OF CREEK BAN (Lat: 41.638061,  Lng: -85.112550),  Route carried "on" structure: Alternate County highway 113,  Year Built: 1975,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 44 (year 2021),  Average Future Daily Traffic: 62 (year 2041),  Design Load: HS 20,  Features Intersected: PIGEON CREEK,  Facility Carried by Structure: CR 25S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7600037,  Location: 0.10 MILES S OF CR 400 N (Lat: 41.699439,  Lng: -85.048231),  Route carried "on" structure: Alternate County highway 29,  Year Built: 2002,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 2,816 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,929 (year 2041),  Design Load: HS 20,  Features Intersected: CHANNEL AT LAKE JAMES,  Facility Carried by Structure: CR 300W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7600043,  Location: 0.30 MILES N OF EDUNHAM R (Lat: 41.645211,  Lng: -84.840989),  Route carried "on" structure: County highway 1,  Year Built: 1967,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 241 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 337 (year 2041),  Design Load: H 20,  Features Intersected: G POWERS/WEST BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7600044,  Location: 0.60 MILES S OF CR 400 S (Lat: 41.576939,  Lng: -85.008611),  Route carried "on" structure: County highway 27,  Year Built: 1927,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 5,462 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,620 (year 2041),  Design Load: HS 20,  Features Intersected: PIGEON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7600047,  Location: 0.50 MILES W OF OLD SR 27 (Lat: 41.624161,  Lng: -85.009289),  Route carried "on" structure: Alternate City street ,  Year Built: 1978,  Status: Open,  Structure Length: 3.19m (10.47ft),  Average Daily Traffic: 695 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 970 (year 2041),  Design Load: HS 20,  Features Intersected: INDIANA NORTHEASTERN RR,  Facility Carried by Structure: FOX LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7600053,  Location: 0.80 MILES S OF CR 300 N (Lat: 41.673339,  Lng: -85.067281),  Route carried "on" structure: Alternate County highway 141,  Year Built: 1982,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,052 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,468 (year 2041),  Design Load: HS 20,  Features Intersected: CHANNEL of CROOKED LAKE,  Facility Carried by Structure: CR 400W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7600061,  Location: 0.30 MILES W OF CR 275 E (Lat: 41.604439,  Lng: -84.942481),  Route carried "on" structure: Alternate County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 351 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 490 (year 2041),  Design Load: HL 93,  Features Intersected: PIGEON CREEK,  Facility Carried by Structure: HANSELMAN Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.5m (67.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2592,  Location: 00.07 E SR 127 (Lat: 41.729800,  Lng: -85.000275),  Route carried "under" structure: Interstate 69,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,994 (year 2021),  Truck Traffic: 34%,  Features Intersected: I-69 NB,  Facility Carried by Structure: SR 120
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 249.802,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 2592,  Location: 00.07 E SR 127 (Lat: 41.729800,  Lng: -85.000275),  Route carried "under" structure: Interstate 69,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,994 (year 2021),  Truck Traffic: 34%,  Features Intersected: I-69 SB,  Facility Carried by Structure: SR 120
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 249.802,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 4079,  Location: 02.95 S US 20 (Lat: 41.594389,  Lng: -85.053986),  Route carried "under" structure: Interstate 69,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,899 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-69 NB,  Facility Carried by Structure: CR 325W
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 554.451,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 4079,  Location: 02.95 S US 20 (Lat: 41.594389,  Lng: -85.053986),  Route carried "under" structure: Interstate 69,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,899 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-69 SB,  Facility Carried by Structure: CR 325W
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 554.451,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 4082,  Location: 01.80 S US 20 (Lat: 41.609161,  Lng: -85.046867),  Route carried "under" structure: County highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 384 (year 2019),  Truck Traffic: 13%,  Features Intersected: FOX LAKE RD,  Facility Carried by Structure: I-69 NB
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 4083,  Location: 01.80 S US 20 (Lat: 41.609161,  Lng: -85.047194),  Route carried "under" structure: County highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 384 (year 2019),  Truck Traffic: 13%,  Features Intersected: FOX LAKE RD,  Facility Carried by Structure: I-69 SB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 4084,  Location: 01.62 N US 20 (Lat: 41.656900,  Lng: -85.040153),  Route carried "under" structure: Interstate 69,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 10,204 (year 2020),  Truck Traffic: 28%,  Features Intersected: I-69 NB,  Facility Carried by Structure: CR 100N
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 561.806,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 4084,  Location: 01.62 N US 20 (Lat: 41.656900,  Lng: -85.040153),  Route carried "under" structure: Interstate 69,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,831 (year 2020),  Truck Traffic: 28%,  Features Intersected: I-69 SB,  Facility Carried by Structure: CR 100N
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 561.806,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 4085,  Location: 02.43 N US 20 (Lat: 41.664089,  Lng: -85.028436),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,479 (year 2020),  Truck Traffic: 5%,  Features Intersected: NB CR 200W,  Facility Carried by Structure: I-69 NB
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.9m (42.3ft)

Find on map >>   Show street view

Structure Number: 4085,  Location: 02.43 N US 20 (Lat: 41.664089,  Lng: -85.028436),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,479 (year 2020),  Truck Traffic: 5%,  Features Intersected: SB CR 200W,  Facility Carried by Structure: I-69 SB
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.9m (42.3ft)

Find on map >>   Show street view

Structure Number: 4086,  Location: 02.43 N US 20 (Lat: 41.664331,  Lng: -85.028442),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,479 (year 2020),  Truck Traffic: 5%,  Features Intersected: NB CR 200W,  Facility Carried by Structure: I-69 SB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.9m (42.3ft)

Find on map >>   Show street view

Structure Number: 4086,  Location: 02.43 N US 20 (Lat: 41.664331,  Lng: -85.028442),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,479 (year 2020),  Truck Traffic: 5%,  Features Intersected: SB CR 200W,  Facility Carried by Structure: I-69 SB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.9m (42.3ft)

Find on map >>   Show street view

Structure Number: 4087,  Location: 02.52 S SR-127 (Lat: 41.671381,  Lng: -85.009864),  Route carried "under" structure: Interstate 69,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,910 (year 2020),  Truck Traffic: 34%,  Features Intersected: I-69 NB,  Facility Carried by Structure: CR 200N
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 564.896,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 4087,  Location: 02.52 S SR-127 (Lat: 41.671381,  Lng: -85.009864),  Route carried "under" structure: Interstate 69,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 8,317 (year 2020),  Truck Traffic: 34%,  Features Intersected: I-69 SB,  Facility Carried by Structure: CR 200N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 564.896,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 4088,  Location: 01.65 S SR 127 (Lat: 41.682700,  Lng: -85.003953),  Route carried "under" structure: Interstate 69,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,910 (year 2020),  Truck Traffic: 34%,  Features Intersected: I-69 NB,  Facility Carried by Structure: CR 275N
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 566.312,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.1m (62.7ft)

Find on map >>   Show street view

Structure Number: 4088,  Location: 01.65 S SR 127 (Lat: 41.682700,  Lng: -85.003953),  Route carried "under" structure: Interstate 69,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 8,317 (year 2020),  Truck Traffic: 34%,  Features Intersected: I-69 SB,  Facility Carried by Structure: CR 275N
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 566.312,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.1m (62.7ft)

Find on map >>   Show street view

Structure Number: 4091,  Location: 00.37 S SR 127 (Lat: 41.701061,  Lng: -85.004403),  Route carried "under" structure: Interstate 69,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 8,317 (year 2020),  Truck Traffic: 34%,  Features Intersected: I-69 SB & RAMP,  Facility Carried by Structure: CR 400N
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 568.372,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>   Show street view

Structure Number: 4091,  Location: 00.37 S SR 127 (Lat: 41.701061,  Lng: -85.004403),  Route carried "under" structure: Interstate 69,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 7,910 (year 2020),  Truck Traffic: 34%,  Features Intersected: I-69 NB & RAMP,  Facility Carried by Structure: CR 400N
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 568.372,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>   Show street view

Structure Number: 4092,  Location: 01.68 S SR-120 (Lat: 41.706328,  Lng: -85.004689),  Route carried "under" structure: State highway 127,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 4,487 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 127,  Facility Carried by Structure: I-69 NB
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 8.095,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 4093,  Location: 01.68 S SR-120 (Lat: 41.706361,  Lng: -85.005019),  Route carried "under" structure: State highway 127,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 4,487 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 127,  Facility Carried by Structure: I-69 SB
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 8.127,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 4892,  Location: 02.51 W US 20 (Lat: 41.659019,  Lng: -84.844603),  Route carried "under" structure: County highway ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 301 (year 2004),  Truck Traffic: 10%,  Features Intersected: CR 100N,  Facility Carried by Structure: I-90 WB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.0m (39.4ft)

Find on map >>   Show street view

Structure Number: 4895,  Location: 00.84 W US 20 (Lat: 41.639450,  Lng: -84.829383),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 10,240 (year 2015),  Truck Traffic: 24%,  Features Intersected: I-90 WB,  Facility Carried by Structure: CR 40S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 249.963,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 4895,  Location: 00.84 W US 20 (Lat: 41.639450,  Lng: -84.829383),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 10,240 (year 2015),  Truck Traffic: 24%,  Features Intersected: I-90 EB,  Facility Carried by Structure: CR 40S
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 249.963,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 4898,  Location: 08.67 E SR 827 (Lat: 41.630600,  Lng: -84.817992),  Route carried "under" structure: US 20,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 3,134 (year 2015),  Truck Traffic: 10%,  Features Intersected: US 20,  Facility Carried by Structure: I-90 WB
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 32.300,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 4899,  Location: 00.32 E US 20 (Lat: 41.628331,  Lng: -84.812972),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 10,460 (year 2014),  Truck Traffic: 24%,  Features Intersected: I-90 EB,  Facility Carried by Structure: CR 935E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 251.830,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.5m (67.3ft)

Find on map >>   Show street view

Structure Number: 4899,  Location: 00.32 E US 20 (Lat: 41.628331,  Lng: -84.812972),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 10,460 (year 2014),  Truck Traffic: 24%,  Features Intersected: I-90 WB,  Facility Carried by Structure: CR 935E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 251.830,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.5m (67.3ft)

Find on map >>   Show street view

Structure Number: 60065,  Location: 00.00 POKAGON STATE PARK (Lat: 41.707869,  Lng: -85.032333),  Route carried "under" structure: ServiceState lands road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2004),  Truck Traffic: 1%,  Features Intersected: PARK ROAD,  Facility Carried by Structure: LN 100 LAKE JAMES
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Length of Maximum Span: 8.5m (27.9ft)

Find on map >>   Show street view

Structure Number: 76812,  Location: 02.55 W SR 127 (Lat: 41.634869,  Lng: -85.048042),  Route carried "under" structure: Interstate 69,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 10,018 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-69 NB,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 237.330,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 76812,  Location: 02.55 W SR 127 (Lat: 41.634869,  Lng: -85.048042),  Route carried "under" structure: Interstate 69,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 10,018 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-69 SB,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 237.330,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 76813,  Location: 02.55 W SR-127 (Lat: 41.634989,  Lng: -85.048042),  Route carried "under" structure: Interstate 69,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 10,018 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-69 NB,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 237.330,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 76813,  Location: 02.55 W SR-127 (Lat: 41.634989,  Lng: -85.048042),  Route carried "under" structure: Interstate 69,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 10,018 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-69 SB,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 237.330,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.6m (97.1ft)

Discuss Angola, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.