Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bedford, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 607ft / 185mTotal length
  • $44,285,000Total costs
  • 421,284Total average daily traffic
  • 103,597Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bedford
  • No street view available for this location

New bridges in Bedford, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 111930-1939
  • 41940-1949
  • 51960-1969
  • 251970-1979
  • 11990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Bedford, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 162000-2009
  • 22010-2019
Average Bridge Daily Traffic in Bedford, PA
Average Bridge Truck Traffic in Bedford, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.6%Very good
  • 57.1%Good
  • 25.0%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 14.3%Good
  • 42.9%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 32.1%Good
  • 32.1%Satisfactory
  • 35.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Good
  • 43.8%Satisfactory
  • 31.3%Fair
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 4563,  Location: TURNPIKE INTERCHANGE (Lat: 40.055975,  Lng: -78.518481),  Route carried "under" structure: Interstate 99,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 5,618 (year 2020),  Truck Traffic: 20%,  Features Intersected: I-99 / US 220,  Facility Carried by Structure: SR 8007 (EXIT 1)
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 45689,  Location: OVER US 30 (Lat: 40.012719,  Lng: -78.467875),  Route carried "under" structure: US 30,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 8,842 (year 2020),  Truck Traffic: 15%,  Features Intersected: SR 0030,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 28.799,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 45689,  Location: OVER US 30 (Lat: 40.012719,  Lng: -78.467875),  Route carried "under" structure: US 30,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 8,966 (year 2020),  Truck Traffic: 15%,  Features Intersected: SR 0030,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 28.788,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.7m (67.9ft)

Discuss Bedford, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.