Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bennington, Vermont (VT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 46Number of bridges
  • 509ft / 155mTotal length
  • $31,028,000Total costs
  • 207,295Total average daily traffic
  • 13,507Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bennington
  • No street view available for this location

New bridges in Bennington, VT - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21910-1919
  • 31920-1929
  • 41930-1939
  • 41940-1949
  • 31950-1959
  • 31960-1969
  • 161970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 52010-2019
Reconstructed bridges in Bennington, VT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 21980-1989
  • 41990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Bennington, VT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 41.7%Very good
  • 36.1%Good
  • 19.4%Satisfactory
  • 2.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 52.8%Very good
  • 16.7%Good
  • 16.7%Satisfactory
  • 13.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 58.3%Good
  • 16.7%Satisfactory
  • 2.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 30.0%Good
  • 16.7%Satisfactory
  • 3.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 200012000302022,  Location: 0.3 MI N JCT VT 67A (Lat: 42.906667,  Lng: -73.211667),  Route carried "under" structure: Alternate State highway 7A,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 1998),  Truck Traffic: 11%,  Features Intersected: VT 279 OVER VT 7A,  Facility Carried by Structure: VT 00279 ML
Minimum Vertical Clearance: 7.39m (24.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 20001203-102022,  Location: 0.3 MI N JCT VT 67A (Lat: 42.906667,  Lng: -73.211667),  Route carried "under" structure: Alternate State highway 7A,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 1998),  Truck Traffic: 11%,  Features Intersected: VT 279 OVER VT 7A,  Facility Carried by Structure: VT 00279 ML
Minimum Vertical Clearance: 7.24m (23.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 200019014A02022,  Location: 1.0 MI N JCT VT 7A @ EX 1 (Lat: 42.905731,  Lng: -73.207861),  Route carried "under" structure: State highway 279,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 1998),  Truck Traffic: 6%,  Features Intersected: US 7 RAMP A OVER VT 279,  Facility Carried by Structure: US 00007 RAMP
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.496,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 200019014S02022,  Location: 1.0 MI N JCT VT 7A @ EX 1 (Lat: 42.905700,  Lng: -73.208236),  Route carried "under" structure: State highway 279,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 1998),  Truck Traffic: 6%,  Features Intersected: US 7 S.B. OVER VT 279,  Facility Carried by Structure: US 00007 ML
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 1.496,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 200110011D02022,  Location: 0.5 MI E JCT. US 7 (Lat: 42.901681,  Lng: -73.191083),  Route carried "under" structure: State highway 279,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 4,550 (year 2010),  Truck Traffic: 6%,  Features Intersected: FAS 1021 OVER VT 279,  Facility Carried by Structure: TH 5/FAS 1021
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 2.300,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 200719013N02022,  Location: 0.5 MI N JCT VT 7A (Lat: 42.902267,  Lng: -73.199561),  Route carried "under" structure: State highway 279,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 13,400 (year 1998),  Truck Traffic: 10%,  Features Intersected: US 7 RAMP OVER VT 279,  Facility Carried by Structure: US 00007 RAMP
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 20.415,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 201000002A02022,  Location: 0.2 MI N JCT. VT.67A (Lat: 42.904331,  Lng: -73.211806),  Route carried "under" structure: Alternate State highway 7A,  Year Built: 1914,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 1998),  Truck Traffic: 2%,  Features Intersected: VT RR OVER VT 7A,  Facility Carried by Structure: RAILROAD
Kilometerpoint: 0.000,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.1m (33.1ft)

Discuss Bennington, Vermont (VT) on our hugely popular Vermont forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.