Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Carnesville, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 564ft / 172mTotal length
  • $155,598,000Total costs
  • 497,165Total average daily traffic
  • 49,996Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Carnesville
  • No street view available for this location

New bridges in Carnesville, GA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 11940-1949
  • 11950-1959
  • 171960-1969
  • 31970-1979
  • 31980-1989
  • 21990-1999
  • 42000-2009
  • 12010-2019
  • 32020-2022
Reconstructed bridges in Carnesville, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31940-1949
  • 11950-1959
  • 01960-1969
  • 61970-1979
  • 21980-1989
Average Bridge Daily Traffic in Carnesville, GA
Average Bridge Truck Traffic in Carnesville, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 70.4%Good
  • 18.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.8%Very good
  • 70.4%Good
  • 14.8%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.8%Very good
  • 55.6%Good
  • 29.6%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 29.4%Good
  • 55.9%Satisfactory
  • 5.9%Fair
  • 2.9%Poor
Find on map >>   Show street view

Structure Number: 119001,  Location: 6.2 MI SW OF CARNESVILLE (Lat: 34.335500,  Lng: -83.336558),  Route carried "on" structure: State highway 59,  Year Built: 1930,  Year Reconstructed: 1947,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,090 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,635 (year 2031),  Design Load: H 15,  Features Intersected: NAILS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $879,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1190011,  Location: 3 MI SW OF CARNESVILLE (Lat: 34.355428,  Lng: -83.287728),  Route carried "on" structure: State highway 59,  Year Built: 1938,  Year Reconstructed: 1947,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,260 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,890 (year 2031),  Design Load: H 15,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 1190012,  Location: 1.7 MI SW OF CARNESVILLE (Lat: 34.359919,  Lng: -83.263389),  Route carried "on" structure: State highway 59,  Year Built: 1930,  Year Reconstructed: 1947,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: H 15,  Features Intersected: MIDDLE FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.23m (46.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1190013,  Location: INSIDE CARNESVILLE GA (Lat: 34.368339,  Lng: -83.238478),  Route carried "on" structure: State highway 59,  Year Built: 1947,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 6,480 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,720 (year 2031),  Design Load: H 15,  Features Intersected: STEPHENS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.39m (34.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $508,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $762,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1190014,  Location: 6.2 MI SW OF LAVONIA (Lat: 34.395247,  Lng: -83.202089),  Route carried "on" structure: State highway 59,  Year Built: 1928,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,820 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,230 (year 2031),  Design Load: H 15,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 1190015,  Location: 5.2 MI SW OF LAVONIA (Lat: 34.401919,  Lng: -83.186897),  Route carried "on" structure: State highway 59,  Year Built: 1973,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 2,820 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,230 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NORTH FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1190019,  Location: 2.3 MI S OF CARNESVILLE (Lat: 34.342300,  Lng: -83.254228),  Route carried "on" structure: State highway 106,  Year Built: 1952,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 2,440 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,660 (year 2031),  Design Load: H 15,  Features Intersected: MIDDLE FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.22m (40.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,114,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 119004,  Location: 3.5 MI SW OF CARNESVILLE (Lat: 34.361458,  Lng: -83.294778),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 29%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 260.714,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $860,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,289,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1190041,  Location: 3.5 MI SW OF CARNESVILLE (Lat: 34.361358,  Lng: -83.295478),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 29%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 260.714,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $918,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,377,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1190042,  Location: 2.2 MI SW OF CARNESVILLE (Lat: 34.370469,  Lng: -83.271939),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 29%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 262.323,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,039,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,559,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1190043,  Location: 2.2 MI SW OF CARNESVILLE (Lat: 34.370669,  Lng: -83.272139),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 38,330 (year 2011),  Truck Traffic: 29%,  Average Future Daily Traffic: 57,495 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 262.323,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,039,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,559,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1190044,  Location: 1.2 MI NW OF CARNESVILLE (Lat: 34.378239,  Lng: -83.252589),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 37,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 56,910 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: STEPHENS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 263.932,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $563,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1190045,  Location: 1.2 MI NW OF CARNESVILLE (Lat: 34.378397,  Lng: -83.252789),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 37,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 56,910 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: STEPHENS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 263.932,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $563,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1190046,  Location: 2.4 MI N OF CARNESVILLE (Lat: 34.398803,  Lng: -83.212394),  Route carried "on" structure: Interstate 85,  Year Built: 1962,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 37,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 56,610 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TURKEY CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 268.760,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $245,000
Find on map >>   Show street view

Structure Number: 1190047,  Location: 5 MI SW OF LAVONIA (Lat: 34.410908,  Lng: -83.187250),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 37,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 56,610 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NORTH FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 271.979,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,360,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1190048,  Location: 5 MI SW OF LAVONIA (Lat: 34.411147,  Lng: -83.187447),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 37,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 56,610 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NORTH FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 271.979,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,360,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1190051,  Location: 4 MI NW OF CARNESVILLE (Lat: 34.395758,  Lng: -83.295550),  Route carried "on" structure: State highway 320,  Year Built: 1990,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,540 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,310 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HUNTERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 93.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 1195007,  Location: 3.8 MI NW OF CANON (Lat: 34.376100,  Lng: -83.165969),  Route carried "on" structure: County highway 47,  Year Built: 1988,  Status: Temporarily open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 40 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 60 (year 2031),  Features Intersected: UNAWATTI CREEK,  Facility Carried by Structure: BURROUGHS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.25m (138.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $182,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $273,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195008,  Location: 3 MI SE OF CANON (Lat: 34.355239,  Lng: -83.186689),  Route carried "on" structure: County highway 48,  Year Built: 1961,  Status: Posted for load,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 550 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 825 (year 2031),  Design Load: HS 15,  Features Intersected: NORTH FORK BROAD RIVER,  Facility Carried by Structure: JACKSON BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 22.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $809,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,213,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195009,  Location: 3.5 MI W OF CANON (Lat: 34.353308,  Lng: -83.171978),  Route carried "on" structure: County highway 48,  Year Built: 1961,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 430 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 645 (year 2031),  Design Load: HS 15,  Features Intersected: UNAWATTI CREEK,  Facility Carried by Structure: JACKSON BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 119501,  Location: 2.5 MI NE OF CARNESVILLE (Lat: 34.388247,  Lng: -83.197989),  Route carried "on" structure: County highway 58,  Year Built: 1971,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 670 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,005 (year 2031),  Design Load: H 15,  Features Intersected: TURKEY CREEK,  Facility Carried by Structure: TURKEY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 1195028,  Location: 3.5 MI SE OF CARNESVILLE (Lat: 34.329669,  Lng: -83.209739),  Route carried "on" structure: County highway 151,  Year Built: 1992,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 40 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 60 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: STEPHENS CREEK,  Facility Carried by Structure: DOLLY PHILLIPS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $322,000
Find on map >>   Show street view

Structure Number: 119503,  Location: 1.5 MI S OF CARNESVILLE (Lat: 34.348958,  Lng: -83.229689),  Route carried "on" structure: County highway 156,  Year Built: 1961,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 380 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 570 (year 2031),  Design Load: H 15,  Features Intersected: STEPHENS CREEK,  Facility Carried by Structure: HUBBARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 42.98m (141.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195031,  Location: 3.6 MI S OF CARNESVILLE (Lat: 34.317569,  Lng: -83.222178),  Route carried "on" structure: County highway 158,  Year Built: 1963,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: BRAYS LAKE CREEK,  Facility Carried by Structure: HARRISON BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 1195032,  Location: 3.7 MI S OF CARNESVILLE (Lat: 34.329908,  Lng: -83.232519),  Route carried "on" structure: County highway 158,  Year Built: 1961,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 560 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 840 (year 2031),  Design Load: HS 15,  Features Intersected: MIDDLE FORK BROAD RIVER,  Facility Carried by Structure: HARRISON BRIDGE RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,108,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195033,  Location: 4.3 MI S OF CARNESVILLE (Lat: 34.306647,  Lng: -83.236269),  Route carried "on" structure: County highway 159,  Year Built: 1961,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 210 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 315 (year 2031),  Design Load: H 15,  Features Intersected: BRAYS LAKE CREEK,  Facility Carried by Structure: BRAYS LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 1195034,  Location: 3.7 MI SE OF CARNESVILLE (Lat: 34.319697,  Lng: -83.212919),  Route carried "on" structure: County highway 163,  Year Built: 1975,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 20 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 30 (year 2031),  Features Intersected: MIDDLE FORK BROAD RIVER,  Facility Carried by Structure: ATKINSON BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 42.43m (139.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $422,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195041,  Location: 2.3 MI NW OF CARNESVILLE (Lat: 34.388428,  Lng: -83.268878),  Route carried "on" structure: County highway 190,  Year Built: 1961,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 260 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 390 (year 2031),  Design Load: H 15,  Features Intersected: STEPHENS CREEK,  Facility Carried by Structure: AKINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1195044,  Location: 1.5 MI NW OF CARNESVILLE (Lat: 34.385300,  Lng: -83.254247),  Route carried "on" structure: County highway 191,  Year Built: 1989,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 40 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 60 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: STEPHENS CREEK TRIB,  Facility Carried by Structure: OLD STAGECOACH ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1195045,  Location: 3 MI NW OF CARNESVILLE (Lat: 34.381658,  Lng: -83.286450),  Route carried "on" structure: County highway 196,  Year Built: 1982,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 60 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 90 (year 2031),  Design Load: HS 15,  Features Intersected: MIDDLE FORK BROAD RIVER,  Facility Carried by Structure: GOOLSBY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1195075,  Location: 2 MI E OF CARNESVILLE (Lat: 34.375478,  Lng: -83.186750),  Route carried "on" structure: County highway 384,  Year Built: 1961,  Status: Posted for load,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 970 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,455 (year 2031),  Design Load: H 15,  Features Intersected: NORTH FORK BROAD RIVER,  Facility Carried by Structure: STONE BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,039,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,559,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195094,  Location: 1.6MI N OF CARNESVILLE (Lat: 34.391528,  Lng: -83.228528),  Route carried "on" structure: State highway 106,  Year Built: 2002,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 5,290 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,935 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,074,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,611,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195095,  Location: 1.3MINW OF CARNESVILLE (Lat: 34.375108,  Lng: -83.257947),  Route carried "on" structure: State highway 320,  Year Built: 2002,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 2,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,074,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,611,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195102,  Location: 4 MI S OF CARNESVILLE (Lat: 34.315100,  Lng: -83.227228),  Route carried "on" structure: County highway 279,  Year Built: 2007,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 30 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M FORK BROAD RIVER,  Facility Carried by Structure: DOWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1195103,  Location: 6.4 MI OF CANON (Lat: 34.342658,  Lng: -83.221869),  Route carried "on" structure: County highway 154,  Year Built: 2006,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 40 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 60 (year 2031),  Design Load: HS 20,  Features Intersected: STEPHENS CREEK,  Facility Carried by Structure: ADERHOLD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1195113,  Location: 1.1 MI NW OF CARNESVILLE (Lat: 34.383639,  Lng: -83.245528),  Route carried "on" structure: County highway 187,  Year Built: 2019,  Status: Open,  Structure Length: 8.13m (26.67ft),  Average Daily Traffic: 70 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 105 (year 2031),  Design Load: HL 93,  Features Intersected: I-85,  Facility Carried by Structure: STAGECOACH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.75m (31.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $23,680,000,  Roadway Improvement Cost: $2,368,000,  Total Project Cost: $35,520,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195116,  Location: 3.2 MI NE OF CARNESVILLE (Lat: 34.405547,  Lng: -83.198678),  Route carried "on" structure: County highway 97,  Year Built: 2020,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 760 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,140 (year 2031),  Design Load: HL 93,  Features Intersected: I-85,  Facility Carried by Structure: BROWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.20m (30.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $22,348,000,  Roadway Improvement Cost: $2,235,000,  Total Project Cost: $33,522,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195117,  Location: 4 MI W OF CANON (Lat: 34.338958,  Lng: -83.180169),  Route carried "on" structure: County highway 44,  Year Built: 2020,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 325 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 375 (year 2040),  Design Load: HL 93,  Features Intersected: UNAWATTI CREEK,  Facility Carried by Structure: CASEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $14,060,000,  Roadway Improvement Cost: $1,406,000,  Total Project Cost: $21,090,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1195119,  Location: 3 MI SW OF CARNESVILLE (Lat: 34.366397,  Lng: -83.285289),  Route carried "on" structure: State highway 198,  Year Built: 2021,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 1,400 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2042),  Design Load: HL 93,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.24m (33.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $24,864,000,  Roadway Improvement Cost: $2,486,000,  Total Project Cost: $37,296,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195094,  Location: 1.6MI N OF CARNESVILLE (Lat: 34.391528,  Lng: -83.228528),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 8,900 (year 2002),  Truck Traffic: 10%,  Features Intersected: SR 106,  Facility Carried by Structure: SR 106
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 267.151,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1195095,  Location: 1.3MINW OF CARNESVILLE (Lat: 34.375108,  Lng: -83.257947),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 1,900 (year 2001),  Truck Traffic: 15%,  Features Intersected: SR 320,  Facility Carried by Structure: SR 320
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 263.932,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1195113,  Location: 1.1 MI NW OF CARNESVILLE (Lat: 34.383639,  Lng: -83.245528),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 36,400 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 187 STAGECOACH ROAD,  Facility Carried by Structure: STAGECOACH ROAD
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 265.542,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Carnesville, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.