Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Chambersburg, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 56Number of bridges
  • 354ft / 108mTotal length
  • $12,781,000Total costs
  • 586,857Total average daily traffic
  • 157,695Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chambersburg
  • No street view available for this location

New bridges in Chambersburg, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 11910-1919
  • 11920-1929
  • 51930-1939
  • 31940-1949
  • 11950-1959
  • 241960-1969
  • 11970-1979
  • 31980-1989
  • 31990-1999
  • 62000-2009
  • 52010-2019
Reconstructed bridges in Chambersburg, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11900-1909
  • 01910-1919
  • 01920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 32000-2009
  • 72010-2019
Average Bridge Daily Traffic in Chambersburg, PA
Average Bridge Truck Traffic in Chambersburg, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.6%Very good
  • 41.2%Good
  • 20.6%Satisfactory
  • 2.9%Fair
  • 14.7%Poor
  • 2.9%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.8%Excellent
  • 25.0%Very good
  • 19.4%Good
  • 25.0%Satisfactory
  • 13.9%Fair
  • 11.1%Poor
  • 2.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.9%Very good
  • 30.6%Good
  • 41.7%Satisfactory
  • 13.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 32.1%Good
  • 28.6%Satisfactory
  • 28.6%Fair
  • 3.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 75.0%Satisfactory
Find on map >>   Show street view

Structure Number: DAPAMCLET000015,  Location: BTWN LA AVE & E-4 RD (Lat: 39.985511,  Lng: -77.704150),  Route carried "on" structure: Other road ,  Year Built: 1943,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 35 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2043),  Features Intersected: SMALL STREAM,  Facility Carried by Structure: GEORGIA AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,000,  Total Project Cost: $2,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPAMCLET000022,  Location: SE OF BUILDING 1570 (Lat: 39.980889,  Lng: -77.700639),  Route carried "on" structure: Other road ,  Year Built: 1942,  Status: Posted for load,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 20 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 22 (year 2043),  Features Intersected: SMALL STREAM,  Facility Carried by Structure: SOUTH PATROL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 17.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17375,  Location: 2 ML. N. OF MARION (Lat: 39.892300,  Lng: -77.669042),  Route carried "under" structure: Interstate 81,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 29,266 (year 2021),  Truck Traffic: 43%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-467; GLFRD SPRNG
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 19.317,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 17375,  Location: 2 ML. N. OF MARION (Lat: 39.892300,  Lng: -77.669042),  Route carried "under" structure: Interstate 81,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 27,746 (year 2021),  Truck Traffic: 45%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-467; GLFRD SPRNG
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 19.307,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 17377,  Location: 2 ML. S.OF CHAMBERSBURG (Lat: 39.901247,  Lng: -77.661772),  Route carried "under" structure: Interstate 81,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 29,266 (year 2021),  Truck Traffic: 43%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-491; KRINER RD
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 20.925,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 17377,  Location: 2 ML. S.OF CHAMBERSBURG (Lat: 39.901247,  Lng: -77.661772),  Route carried "under" structure: Interstate 81,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 27,746 (year 2021),  Truck Traffic: 45%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-491; KRINER RD
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 20.925,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 17381,  Location: WAYNE AVE. CHAMBERSBURG (Lat: 39.909131,  Lng: -77.648561),  Route carried "under" structure: State highway 316,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 4,065 (year 2020),  Truck Traffic: 4%,  Features Intersected: PA 316; SR 0316,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 23.960,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 17381,  Location: WAYNE AVE. CHAMBERSBURG (Lat: 39.909131,  Lng: -77.648561),  Route carried "under" structure: State highway 316,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 4,065 (year 2020),  Truck Traffic: 4%,  Features Intersected: PA 316; SR 0316,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 23.960,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 17382,  Location: WAYNE AVE. S.CHAMBERSBURG (Lat: 39.909219,  Lng: -77.648975),  Route carried "under" structure: State highway 316,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 4,065 (year 2020),  Truck Traffic: 4%,  Features Intersected: PA 316; SR 0316,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 23.960,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 17382,  Location: WAYNE AVE. S.CHAMBERSBURG (Lat: 39.909219,  Lng: -77.648975),  Route carried "under" structure: State highway 316,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 4,065 (year 2020),  Truck Traffic: 4%,  Features Intersected: PA 316; SR 0316,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 23.960,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 17383,  Location: 0.5ML. N. OF WAYNE AVE. (Lat: 39.920203,  Lng: -77.639283),  Route carried "under" structure: Interstate 81,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 24,991 (year 2022),  Truck Traffic: 34%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-513; MCKINLEY ST
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 17383,  Location: 0.5ML. N. OF WAYNE AVE. (Lat: 39.920203,  Lng: -77.639283),  Route carried "under" structure: Interstate 81,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 25,332 (year 2022),  Truck Traffic: 28%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-513; MCKINLEY ST
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 24.147,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 17385,  Location: U.S.30 CHAMBERSBURG (Lat: 39.929058,  Lng: -77.634819),  Route carried "under" structure: US 30,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,779 (year 2020),  Truck Traffic: 4%,  Features Intersected: US 30; SR 0030,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 30.965,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 17385,  Location: U.S.30 CHAMBERSBURG (Lat: 39.929058,  Lng: -77.634819),  Route carried "under" structure: US 30,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,779 (year 2020),  Truck Traffic: 4%,  Features Intersected: US 30; SR 0030,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 30.965,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 17387,  Location: U.S. 30 CHAMBURSBURG (Lat: 39.928956,  Lng: -77.635208),  Route carried "under" structure: US 30,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,779 (year 2020),  Truck Traffic: 4%,  Features Intersected: US 30; SR 0030,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 30.965,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 17387,  Location: U.S. 30 CHAMBURSBURG (Lat: 39.928956,  Lng: -77.635208),  Route carried "under" structure: US 30,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,779 (year 2020),  Truck Traffic: 4%,  Features Intersected: US 30; SR 0030,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 30.965,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 43238,  Location: 1 MI.N.OF CHAMBERSBURG (Lat: 39.941206,  Lng: -77.622331),  Route carried "under" structure: Interstate 81,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 24,933 (year 2021),  Truck Traffic: 19%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 1010; WALKER RD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 26.575,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 43238,  Location: 1 MI.N.OF CHAMBERSBURG (Lat: 39.941206,  Lng: -77.622331),  Route carried "under" structure: Interstate 81,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 24,570 (year 2021),  Truck Traffic: 18%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 1010; WALKER RD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 26.570,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.5m (86.9ft)

Discuss Chambersburg, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.