Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Charlotte, North Carolina (NC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,090Number of bridges
  • 10,591ft / 3,228mTotal length
  • 32,882,618Total average daily traffic
  • 4,671,732Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Charlotte
  • No street view available for this location

New bridges in Charlotte, NC - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 71930-1939
  • 101940-1949
  • 411950-1959
  • 741960-1969
  • 2131970-1979
  • 1561980-1989
  • 1981990-1999
  • 2282000-2009
  • 1482010-2019
  • 122020-2022
Reconstructed bridges in Charlotte, NC - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31940-1949
  • 41950-1959
  • 51960-1969
  • 51970-1979
  • 161980-1989
  • 121990-1999
  • 192000-2009
  • 12010-2019
Average Bridge Daily Traffic in Charlotte, NC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.1%Excellent
  • 40.3%Very good
  • 40.3%Good
  • 8.4%Satisfactory
  • 1.0%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 29.5%Excellent
  • 45.3%Very good
  • 17.5%Good
  • 6.0%Satisfactory
  • 1.7%Fair
  • 0.7%Poor
  • 0.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.6%Excellent
  • 48.7%Very good
  • 24.5%Good
  • 9.8%Satisfactory
  • 1.9%Fair
  • 0.5%Poor
  • 0.2%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.2%Excellent
  • 1.8%Very good
  • 73.8%Good
  • 18.9%Satisfactory
  • 4.0%Fair
  • 0.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 1.1%Excellent
  • 36.6%Very good
  • 44.6%Good
  • 16.7%Satisfactory
  • 1.1%Fair
  • 0.5%Serious
Find on map >>   Show street view

Structure Number: 1191229,  Location: 1.2 MI. W. JCT. US29 (Lat: 35.346461,  Lng: -80.735300),  Route carried "under" structure: Ramp Interstate 85,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 16,125 (year 2015),  Truck Traffic: 16%,  Features Intersected: I85 RAMP,I485 RAMP
Minimum Vertical Clearance: 7.70m (25.26ft),  Kilometerpoint: 14.444,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 1191265,  Location: 1.2 MI. E. JCT. NC 115 (Lat: 35.367542,  Lng: -80.806069),  Route carried "under" structure: Interstate 485,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 2011),  Truck Traffic: 16%,  Features Intersected: SR 2480
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 1191265,  Location: 1.2 MI. E. JCT. NC 115 (Lat: 35.367542,  Lng: -80.806069),  Route carried "under" structure: Interstate 485,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 2011),  Truck Traffic: 16%,  Features Intersected: SR 2480
Minimum Vertical Clearance: 6.44m (21.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 1191266,  Location: 0.25 MI.S.JCT.SR2601 (Lat: 35.369092,  Lng: -80.789492),  Route carried "under" structure: Interstate 485,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2015),  Truck Traffic: 16%,  Features Intersected: SR6050
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 7.955,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1191266,  Location: 0.25 MI.S.JCT.SR2601 (Lat: 35.369092,  Lng: -80.789492),  Route carried "under" structure: Interstate 485,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2015),  Truck Traffic: 16%,  Features Intersected: SR6050
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 7.955,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1191267,  Location: 0.2 MI. N. JCT. SR2477 (Lat: 35.368883,  Lng: -80.784403),  Route carried "under" structure: Interstate 485,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2019),  Truck Traffic: 16%,  Features Intersected: PROSPERITY CH. RD.
Minimum Vertical Clearance: 5.42m (17.78ft),  Kilometerpoint: 8.016,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1191267,  Location: 0.2 MI. N. JCT. SR2477 (Lat: 35.368883,  Lng: -80.784403),  Route carried "under" structure: Interstate 485,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2019),  Truck Traffic: 16%,  Features Intersected: PROSPERITY CH. RD.
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 8.016,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1191268,  Location: 0.28 MI.S.JCT.SR2601 (Lat: 35.368775,  Lng: -80.780000),  Route carried "under" structure: Interstate 485,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2015),  Truck Traffic: 16%,  Features Intersected: SR6052
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 8.119,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1191268,  Location: 0.28 MI.S.JCT.SR2601 (Lat: 35.368775,  Lng: -80.780000),  Route carried "under" structure: Interstate 485,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2015),  Truck Traffic: 16%,  Features Intersected: SR6052
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 8.119,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1191271,  Location: 0.1 MI. S. JCT. SR2464 (Lat: 35.361944,  Lng: -80.749389),  Route carried "under" structure: Interstate 485,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2013),  Truck Traffic: 16%,  Features Intersected: SR2467
Minimum Vertical Clearance: 5.85m (19.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.8m (97.8ft)

Find on map >>   Show street view

Structure Number: 1191271,  Location: 0.1 MI. S. JCT. SR2464 (Lat: 35.361944,  Lng: -80.749389),  Route carried "under" structure: Interstate 485,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2013),  Truck Traffic: 16%,  Features Intersected: SR2467
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 8.814,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.8m (97.8ft)

Find on map >>   Show street view

Structure Number: 1191272,  Location: 0.1 MI. E. JCT. SR2463 (Lat: 35.363250,  Lng: -80.746861),  Route carried "under" structure: State highway 2464,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 6,750 (year 2014),  Truck Traffic: 7%,  Features Intersected: SR2601
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.0m (78.7ft)

Find on map >>   Show street view

Structure Number: 1191272,  Location: 0.1 MI. E. JCT. SR2463 (Lat: 35.363250,  Lng: -80.746861),  Route carried "under" structure: State highway 2464,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 6,750 (year 2014),  Truck Traffic: 7%,  Features Intersected: SR2601
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.0m (78.7ft)

Find on map >>   Show street view

Structure Number: 1191317,  Location: .5MI.E.JCT.US29(TRYON ST) (Lat: 35.251861,  Lng: -80.791333),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2014),  Truck Traffic: 7%,  Features Intersected: SR2975SR2975,  Facility Carried by Structure: RALEIGH ST.
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 1191317,  Location: .5MI.E.JCT.US29(TRYON ST) (Lat: 35.251861,  Lng: -80.791333),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2014),  Truck Traffic: 7%,  Features Intersected: SR2975SR2975,  Facility Carried by Structure: BEARWOOD AVE.
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 1191319,  Location: .3 MI.N.JCT.BALLANTYNE CM (Lat: 35.063611,  Lng: -80.848611),  Route carried "under" structure: US 521,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 2012),  Truck Traffic: 6%,  Features Intersected: I485 WBL RAMP
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 1191319,  Location: .3 MI.N.JCT.BALLANTYNE CM (Lat: 35.063611,  Lng: -80.848611),  Route carried "under" structure: Interstate 485,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 43,250 (year 2013),  Truck Traffic: 16%,  Features Intersected: I485 WBL RAMP
Minimum Vertical Clearance: 9.06m (29.72ft),  Kilometerpoint: 18.727,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 1191319,  Location: .3 MI.N.JCT.BALLANTYNE CM (Lat: 35.063611,  Lng: -80.848611),  Route carried "under" structure: Interstate 485,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 43,250 (year 2013),  Truck Traffic: 16%,  Features Intersected: I485 WBL RAMP
Minimum Vertical Clearance: 7.31m (23.98ft),  Kilometerpoint: 18.727,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 1191319,  Location: .3 MI.N.JCT.BALLANTYNE CM (Lat: 35.063611,  Lng: -80.848611),  Route carried "under" structure: US 521,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 2012),  Truck Traffic: 6%,  Features Intersected: I485 WBL RAMP
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 1191326,  Location: 0.09 MI. S,JCT.I85 (Lat: 35.347111,  Lng: -80.732694),  Route carried "under" structure: Interstate 85,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2015),  Truck Traffic: 14%,  Features Intersected: I-485E OUTER LOOP
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 1191327,  Location: 0.10 MI S. JCT. I-85 (Lat: 35.347214,  Lng: -80.732361),  Route carried "under" structure: Ramp Interstate 85,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2014),  Truck Traffic: 16%,  Features Intersected: I-485W OUTER LOOP
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 1191328,  Location: 1.2 MI. E. JCT. SR2467 (Lat: 35.346131,  Lng: -80.732014),  Route carried "under" structure: Ramp Interstate 485,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2014),  Truck Traffic: 16%,  Features Intersected: I485 INNER
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 1191329,  Location: 0.10 MI. S. JCT. I-85 (Lat: 35.346389,  Lng: -80.731667),  Route carried "under" structure: Ramp Interstate 85,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2014),  Truck Traffic: 16%,  Features Intersected: I-485W OUTER LOOP
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 1191338,  Location: I-277 ramp flyover from I (Lat: 35.244861,  Lng: -80.846278),  Route carried "under" structure: Interstate 77,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 85,500 (year 2018),  Truck Traffic: 16%,  Features Intersected: Ramp I-277 To I-77 NB H
Minimum Vertical Clearance: 8.22m (26.97ft),  Kilometerpoint: 1.524,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 1191339,  Location: I-77 between Lasalle St. (Lat: 35.267583,  Lng: -80.844911),  Route carried "under" structure: Interstate 77,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 80,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I-77 Northbound Hot Lane
Minimum Vertical Clearance: 6.29m (20.64ft),  Kilometerpoint: 3.962,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.6m (116.8ft)

Find on map >>   Show street view

Structure Number: 119134,  Location: I-77 between Lasalle St. (Lat: 35.273281,  Lng: -80.843722),  Route carried "under" structure: Interstate 85,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 83,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I-77 NB Hot Lanes
Minimum Vertical Clearance: 6.42m (21.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>   Show street view

Structure Number: 119134,  Location: I-77 between Lasalle St. (Lat: 35.273281,  Lng: -80.843722),  Route carried "under" structure: Interstate 85,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 83,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I-77 NB Hot Lanes
Minimum Vertical Clearance: 5.96m (19.55ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>   Show street view

Structure Number: 1191341,  Location: I-77 between I-85 and I-7 (Lat: 35.276003,  Lng: -80.843986),  Route carried "under" structure: Interstate 85,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 63,500 (year 2018),  Truck Traffic: 16%,  Features Intersected: I-77 NB Hot Lanes
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 4.114,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1191342,  Location: I77NB BW. I85 & CINDY LN. (Lat: 35.278056,  Lng: -80.845278),  Route carried "under" structure: Interstate 77,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 57,000 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-77 NB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 1191344,  Location: I-77 between Lasalle St. (Lat: 35.273056,  Lng: -80.844444),  Route carried "under" structure: Interstate 85,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 63,500 (year 2018),  Truck Traffic: 16%,  Features Intersected: Ramp to I-77 SB Hot Lane
Minimum Vertical Clearance: 7.75m (25.43ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.1m (121.7ft)

Find on map >>   Show street view

Structure Number: 1191344,  Location: I-77 between Lasalle St. (Lat: 35.273056,  Lng: -80.844444),  Route carried "under" structure: Interstate 85,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 63,500 (year 2018),  Truck Traffic: 16%,  Features Intersected: Ramp to I-77 SB Hot Lane
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.1m (121.7ft)

Find on map >>   Show street view

Structure Number: 1191357,  Location: 0.5 MI.W.OF NC 29 (Lat: 35.298333,  Lng: -80.763611),  Route carried "under" structure: Interstate 85,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 72,000 (year 2019),  Truck Traffic: 16%,  Features Intersected: UNIV.POINTE BLVD
Minimum Vertical Clearance: 6.32m (20.73ft),  Kilometerpoint: 6.522,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 1191357,  Location: 0.5 MI.W.OF NC 29 (Lat: 35.298333,  Lng: -80.763611),  Route carried "under" structure: Interstate 85,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 72,000 (year 2019),  Truck Traffic: 16%,  Features Intersected: UNIV.POINTE BLVD
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 6.522,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 11914,  Location: 1.2 MI. E. JCT.SR2467 (Lat: 35.348906,  Lng: -80.735556),  Route carried "under" structure: Ramp Interstate 85,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 38,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I485 INNER RAMP
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 1191401,  Location: 1.4MI. E. JCT.SR2467 (Lat: 35.346967,  Lng: -80.734819),  Route carried "under" structure: Interstate 85,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2015),  Truck Traffic: 14%,  Features Intersected: I485 INNER RAMP
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: Toll bridge is a segment,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 1191401,  Location: 1.4MI. E. JCT.SR2467 (Lat: 35.346967,  Lng: -80.734819),  Route carried "under" structure: Interstate 85,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 104,600 (year 2008),  Truck Traffic: 15%,  Features Intersected: I485 INNER RAMP
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 14.447,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: Toll bridge is a segment,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 1191401,  Location: 1.4MI. E. JCT.SR2467 (Lat: 35.346967,  Lng: -80.734819),  Route carried "under" structure: Interstate 85,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 104,600 (year 2008),  Truck Traffic: 15%,  Features Intersected: I485 INNER RAMP
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 14.447,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: Toll bridge is a segment,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 1191408,  Location: 0.6M. E. JCT.OLD DOWNS RD (Lat: 35.220981,  Lng: -80.943947),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2016),  Truck Traffic: 7%,  Features Intersected: JOSH BIRMINGHAM,  Facility Carried by Structure: AIRPORT LOOP RD.
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 119141,  Location: .27M.S.JCT.WILKINSON BLVD (Lat: 35.231428,  Lng: -80.940211),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2012),  Truck Traffic: 7%,  Features Intersected: N.JOSH BIRMINGHAM,  Facility Carried by Structure: RC JOSH BIRMINGHAM
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 1191411,  Location: 0.35M. W. JCT.HARLEE AVE. (Lat: 35.233167,  Lng: -80.939583),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2016),  Truck Traffic: 7%,  Features Intersected: RCJOSH BIRMINGHAM,  Facility Carried by Structure: N.JOSH BIRMINGHAM
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Discuss Charlotte, North Carolina (NC) on our hugely popular North Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.