Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Conneaut, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 48Number of bridges
  • 745ft / 227mTotal length
  • $562,000Total costs
  • 269,231Total average daily traffic
  • 72,641Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Conneaut
  • No street view available for this location

New bridges in Conneaut, OH - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 61900-1909
  • 41940-1949
  • 21950-1959
  • 251960-1969
  • 31980-1989
  • 21990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Conneaut, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31970-1979
  • 31980-1989
  • 51990-1999
  • 72000-2009
  • 12010-2019
Average Bridge Daily Traffic in Conneaut, OH
Average Bridge Truck Traffic in Conneaut, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.1%Excellent
  • 45.9%Very good
  • 32.4%Good
  • 8.1%Satisfactory
  • 5.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.8%Excellent
  • 32.4%Very good
  • 37.8%Good
  • 10.8%Satisfactory
  • 8.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Excellent
  • 32.4%Very good
  • 37.8%Good
  • 8.1%Satisfactory
  • 10.8%Fair
  • 2.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.0%Excellent
  • 60.0%Very good
  • 16.0%Good
  • 12.0%Satisfactory
  • 4.0%Fair
Find on map >>   Show street view

Structure Number: 400963,  Location: JCT OF SR 7 AND IR 90 (Lat: 41.916589,  Lng: -80.568550),  Route carried "under" structure: Interstate 90,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 19,820 (year 2015),  Truck Traffic: 30%,  Features Intersected: SR 7,  Facility Carried by Structure: SR 7
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 41.489,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 40447,  Location: 2.61 MI E OF SR 84 (Lat: 41.899589,  Lng: -80.623119),  Route carried "under" structure: County highway 22,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 403 (year 2015),  Truck Traffic: 5%,  Features Intersected: IR 90,  Facility Carried by Structure: I.R. 90
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 4.780,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 4045,  Location: 2.61 MI E OF SR 84 (Lat: 41.899261,  Lng: -80.622869),  Route carried "under" structure: County highway 22,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 403 (year 2015),  Truck Traffic: 5%,  Features Intersected: IR 90,  Facility Carried by Structure: I.R. 90
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 4.812,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 404535,  Location: 1.90 MI W OF SR 7 (Lat: 41.906789,  Lng: -80.603411),  Route carried "under" structure: Interstate 90,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 25,343 (year 2016),  Truck Traffic: 32%,  Features Intersected: KEEFUS RD CR-421,  Facility Carried by Structure: KEEFUS ROAD CR 421
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 38.415,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.1m (105.3ft)

Find on map >>   Show street view

Structure Number: 404594,  Location: 1.22 MI W OF SR 7 (Lat: 41.910689,  Lng: -80.590669),  Route carried "under" structure: Interstate 90,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 25,343 (year 2016),  Truck Traffic: 32%,  Features Intersected: PARRISH RD MR-372M,  Facility Carried by Structure: PARRISH RD MR-372M
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 39.542,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 404683,  Location: 0.75 MI E OF SR 7 (Lat: 41.920131,  Lng: -80.555239),  Route carried "under" structure: Interstate 90,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,736 (year 2016),  Truck Traffic: 28%,  Features Intersected: DORMAN RD MR-295,  Facility Carried by Structure: DORMAN ROAD MR-295
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 42.673,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 404713,  Location: 1.48 MI E OF SR 7 (Lat: 41.925289,  Lng: -80.542800),  Route carried "under" structure: Interstate 90,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,736 (year 2016),  Truck Traffic: 28%,  Features Intersected: MIDDLE RD MR-351,  Facility Carried by Structure: MIDDLE ROAD MR-351
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 43.851,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 404748,  Location: 1.92 MI E OF SR 11 (Lat: 41.929531,  Lng: -80.535550),  Route carried "under" structure: County highway 426,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 759 (year 2015),  Truck Traffic: 5%,  Features Intersected: IR 90,  Facility Carried by Structure: I.R. 90
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 7.532,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 404772,  Location: 1.92 MI E OF SR 11 (Lat: 41.929161,  Lng: -80.535331),  Route carried "under" structure: County highway 426,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 759 (year 2015),  Truck Traffic: 5%,  Features Intersected: IR 90,  Facility Carried by Structure: I.R. 90
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 7.500,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Discuss Conneaut, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.