Bridge Statistics for Cordele, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 73Number of bridges
  • 696ft / 212mTotal length
  • $49,807,000Total costs
  • 846,610Total average daily traffic
  • 29,016Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cordele
  • No street view available for this location

New bridges in Cordele, GA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51930-1939
  • 31940-1949
  • 41950-1959
  • 161960-1969
  • 71970-1979
  • 181980-1989
  • 11990-1999
  • 42000-2009
Reconstructed bridges in Cordele, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 21990-1999
  • 42000-2009
  • 32010-2019
Average Bridge Daily Traffic in Cordele, GA
Average Bridge Truck Traffic in Cordele, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 89.7%Good
  • 7.7%Satisfactory
  • 2.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.5%Very good
  • 53.8%Good
  • 2.6%Satisfactory
  • 5.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 89.7%Good
  • 7.7%Satisfactory
  • 2.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 55.0%Very good
  • 20.0%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 810001,  Location: 1.5 MILE SOUTH OF CORDELE (Lat: 31.931047,  Lng: -83.778039),  Route carried "on" structure: US 41,  Year Built: 1928,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 3,210 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,815 (year 2032),  Design Load: H 15,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.98m (141.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 810002,  Location: CORDELE-NW SECTION (Lat: 31.981147,  Lng: -83.785078),  Route carried "on" structure: US 41,  Year Built: 1952,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 6,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,125 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,002,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,504,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810003,  Location: CORDELE-NW SECTION (Lat: 31.983919,  Lng: -83.790558),  Route carried "on" structure: US 41,  Year Built: 1951,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 6,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,125 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $1,087,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,630,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 810004,  Location: CORDELE-NW SECTION (Lat: 31.983550,  Lng: -83.791089),  Route carried "on" structure: City street 1305,  Year Built: 1982,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20,  Features Intersected: GUM CREEK,  Facility Carried by Structure: JOE WRIGHT DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,055,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 810007,  Location: 2.5 MI E OF CORDELE (Lat: 31.950058,  Lng: -83.704739),  Route carried "on" structure: US 280,  Year Built: 1943,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,910 (year 2012),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,365 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DEEP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 810009,  Location: 4.7 MI E OF CORDELE (Lat: 31.957397,  Lng: -83.671008),  Route carried "on" structure: US 280,  Year Built: 1942,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,910 (year 2012),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,365 (year 2032),  Design Load: H 15,  Features Intersected: REDOAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 810013,  Location: APP 3 MI S OF CORDELE (Lat: 31.906858,  Lng: -83.737678),  Route carried "on" structure: Ramp State highway 33,  Year Built: 1960,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,395 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 96.78N,  Facility Carried by Structure: ROCK-WENONA HOUSE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $824,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,237,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810018,  Location: APP 7 MI. SW OF CORDELE (Lat: 31.913139,  Lng: -83.853039),  Route carried "on" structure: State highway 300,  Year Built: 1981,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 9,010 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,515 (year 2032),  Design Load: HS 20,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $844,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810019,  Location: APP 7 MI. SW OF CORDELE (Lat: 31.913169,  Lng: -83.853250),  Route carried "on" structure: State highway 300,  Year Built: 1981,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 9,010 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,515 (year 2032),  Design Load: HS 20,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $844,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810022,  Location: 2.9 MI NE OF JCT I-75 (Lat: 32.006728,  Lng: -83.737458),  Route carried "on" structure: State highway 257,  Year Built: 1957,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 1,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,625 (year 2032),  Design Load: H 15,  Features Intersected: GUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.70m (140.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 810023,  Location: APP 2.4 MI S OF CORDELE (Lat: 31.925608,  Lng: -83.745339),  Route carried "on" structure: County highway 355,  Year Built: 1960,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 680 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,020 (year 2032),  Design Load: HS 15,  Features Intersected: I-75 MP 98.15,  Facility Carried by Structure: OLD HATLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $863,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,295,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810025,  Location: 2.6 MI S OF CORDELLE (Lat: 31.923228,  Lng: -83.744239),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 35,210 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 52,815 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 157.716,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $429,000
Find on map >>   Show street view

Structure Number: 810026,  Location: 2.1 MI S OF CORDELLE (Lat: 31.930169,  Lng: -83.746728),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 35,210 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 52,815 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 157.716,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $649,000
Find on map >>   Show street view

Structure Number: 810027,  Location: 0.6 MI S OF CORDELLE (Lat: 31.951650,  Lng: -83.750128),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 41,370 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,055 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.934,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $380,000
Find on map >>   Show street view

Structure Number: 810028,  Location: CORDELE - EAST SECTION (Lat: 31.959972,  Lng: -83.751542),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 41,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,835 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 30
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.544,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.6m (129.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 39.6m (129.9ft),  Out-to-Out Width: 41.8m (137.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,291,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,936,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 81003,  Location: 0.2 MI N OF JCT SR 30 (Lat: 31.962989,  Lng: -83.751908),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 41,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,835 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.544,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.6m (129.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 39.6m (129.9ft),  Out-to-Out Width: 41.9m (137.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,193,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,789,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810032,  Location: CORDELLE-EAST SECTION (Lat: 31.966617,  Lng: -83.752600),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 41,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,835 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: M-1311 13TH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.544,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.4m (126.0ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 38.4m (126.0ft),  Out-to-Out Width: 40.3m (132.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,225,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,838,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810034,  Location: CORDELE-EAST SECTION (Lat: 31.968228,  Lng: -83.752769),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 41,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,835 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.544,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 39.0m (128.0ft),  Out-to-Out Width: 40.2m (131.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,368,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810036,  Location: APP 2 MI N OF CORDELE (Lat: 31.994569,  Lng: -83.756858),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 41,810 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,715 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.762,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $355,000
Find on map >>   Show street view

Structure Number: 810037,  Location: APP 3 MI N OF CORDELE (Lat: 32.009339,  Lng: -83.759158),  Route carried "on" structure: Interstate 75,  Year Built: 1960,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 41,740 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 62,610 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.372,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 47.5m (155.8ft),  Out-to-Out Width: 55.2m (181.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $882,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,323,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 81004,  Location: 5 MI NE OF CORDELE (Lat: 32.018489,  Lng: -83.735239),  Route carried "on" structure: County highway 1175,  Year Built: 1986,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 200 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM CREEK TRIB.,  Facility Carried by Structure: SHARON CH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 810042,  Location: CORDELE-NW SECTION (Lat: 31.974450,  Lng: -83.794319),  Route carried "on" structure: City street 1304,  Year Built: 1976,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,460 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,190 (year 2032),  Design Load: HS 20,  Features Intersected: GUM CREEK,  Facility Carried by Structure: NORTH 15TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810043,  Location: CORDELE-N SECTION (Lat: 31.982008,  Lng: -83.774678),  Route carried "on" structure: City street 1308,  Year Built: 1978,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,190 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,785 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM CREEK TRIB.,  Facility Carried by Structure: SECOND ST NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 810054,  Location: 0.9 MI E OF JCT SR 7 (Lat: 32.004228,  Lng: -83.779389),  Route carried "on" structure: County highway 1818,  Year Built: 1954,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,600 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,400 (year 2032),  Design Load: H 15,  Features Intersected: GUM CREEK TRIB.,  Facility Carried by Structure: FARMERS MARKET RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 810055,  Location: 1.8 MILES EAST OF CORDEL (Lat: 32.004039,  Lng: -83.762828),  Route carried "on" structure: County highway 1818,  Year Built: 1961,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,600 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,400 (year 2032),  Design Load: HS 20,  Features Intersected: GUM CREEK,  Facility Carried by Structure: FARMERS MARKET RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Mixed types,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $633,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 81006,  Location: 3.1 MI S OF CORDELE (Lat: 31.923419,  Lng: -83.796950),  Route carried "on" structure: State highway 300,  Year Built: 1984,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 7,630 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 11,445 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810061,  Location: 3.1 MI S OF CORDELE (Lat: 31.923231,  Lng: -83.797117),  Route carried "on" structure: State highway 300,  Year Built: 1985,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 7,630 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 11,445 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810062,  Location: 3.1 MI S OF CORDELE (Lat: 31.923158,  Lng: -83.782319),  Route carried "on" structure: State highway 300,  Year Built: 1985,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,630 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 11,445 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000
Find on map >>   Show street view

Structure Number: 810063,  Location: 3.2 MI S OF CORDELE (Lat: 31.923058,  Lng: -83.771556),  Route carried "on" structure: State highway 300,  Year Built: 1984,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 7,630 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 11,445 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 7 (US 41)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 19.9m (65.3ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,139,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,708,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810064,  Location: 3.2 MI S OF CORDELE (Lat: 31.923267,  Lng: -83.771669),  Route carried "on" structure: State highway 300,  Year Built: 1984,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 7,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,505 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 7 (US 41)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $1,336,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810065,  Location: 3.2 MI SE OF CORDELE (Lat: 31.923078,  Lng: -83.768708),  Route carried "on" structure: State highway 300,  Year Built: 1984,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 7,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,505 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810066,  Location: 3.2 MI SE OF CORDELE (Lat: 31.923269,  Lng: -83.768797),  Route carried "on" structure: State highway 300,  Year Built: 1985,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 7,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,505 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 19 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 21.4m (70.2ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,044,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810067,  Location: 2.8 MI SE OF CORDELE (Lat: 31.928878,  Lng: -83.756219),  Route carried "on" structure: State highway 300,  Year Built: 1985,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 7,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,505 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $254,000
Find on map >>   Show street view

Structure Number: 810068,  Location: 2.9 MILES SOUTHEAST OF CO (Lat: 31.934447,  Lng: -83.747444),  Route carried "on" structure: State highway 300,  Year Built: 1984,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 7,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,505 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 1,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $764,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,147,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 810069,  Location: 2.9 MI SE OF CORDELE (Lat: 31.934639,  Lng: -83.747478),  Route carried "on" structure: State highway 300,  Year Built: 1984,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 7,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,505 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,577,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 81007,  Location: 2.6 MI E OF CORDELE (Lat: 31.950028,  Lng: -83.703289),  Route carried "on" structure: US 280,  Year Built: 1988,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 2,910 (year 2012),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,365 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $930,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,395,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 815002,  Location: 3.5 MI S OF CORDELE (Lat: 31.916478,  Lng: -83.806428),  Route carried "on" structure: County highway 1,  Year Built: 1985,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: PATEVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $393,000
Find on map >>   Show street view

Structure Number: 815017,  Location: 5.5 MI NE OF CORDELE (Lat: 31.999589,  Lng: -83.697489),  Route carried "on" structure: County highway 97,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 90 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 135 (year 2032),  Features Intersected: GUM CREEK TRIB.,  Facility Carried by Structure: TWIN PINES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 815023,  Location: 2.5 MI N OF CORDELE (Lat: 32.000158,  Lng: -83.764547),  Route carried "on" structure: County highway 161,  Year Built: 1945,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 210 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 315 (year 2032),  Features Intersected: GUM CREEK,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 44.17m (144.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 815024,  Location: 5.5 MI NE OF CORDELE (Lat: 32.020758,  Lng: -83.721400),  Route carried "on" structure: County highway 175,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 30 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2032),  Features Intersected: GUM CREEK,  Facility Carried by Structure: NAPPA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 815025,  Location: 4 MI N OF CORDELE (Lat: 32.019569,  Lng: -83.754819),  Route carried "on" structure: County highway 177,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2032),  Features Intersected: MIMS BRANCH,  Facility Carried by Structure: WHITLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other