Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cranston, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 92Number of bridges
  • 797ft / 243mTotal length
  • $195,936,000Total costs
  • 2,644,609Total average daily traffic
  • 226,626Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cranston
  • No street view available for this location

New bridges in Cranston, RI - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 31920-1929
  • 11930-1939
  • 21940-1949
  • 121950-1959
  • 571960-1969
  • 11970-1979
  • 21980-1989
  • 42000-2009
  • 32010-2019
  • 42020-2022
Reconstructed bridges in Cranston, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 141980-1989
  • 71990-1999
  • 22000-2009
Average Bridge Daily Traffic in Cranston, RI
Average Bridge Truck Traffic in Cranston, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Very good
  • 23.5%Good
  • 37.3%Satisfactory
  • 21.6%Fair
  • 7.8%Poor
  • 2.0%Serious
  • 2.0%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.9%Very good
  • 5.2%Good
  • 31.0%Satisfactory
  • 34.5%Fair
  • 19.0%Poor
  • 3.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.8%Good
  • 44.8%Satisfactory
  • 25.9%Fair
  • 15.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 26.1%Good
  • 30.4%Satisfactory
  • 39.1%Fair
  • 4.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 663,  Location: 3.5 Mi N of JCT RI 37 (Lat: 41.781403,  Lng: -71.422819),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2008),  Truck Traffic: 2%,  Features Intersected: WELLINGTON AV & AMTRAK,  Facility Carried by Structure: I-95 RAMP B-EL
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 664,  Location: 2.2 Mi S of JCT I-195 (Lat: 41.782922,  Lng: -71.423817),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 115,700 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-95 NB & SB,  Facility Carried by Structure: RI 10 RAMP BC
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 665,  Location: 3.0 Mi N of JCT RI 37 (Lat: 41.781894,  Lng: -71.423492),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 110,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-95 NB & SB, AMTRAK,  Facility Carried by Structure: RI 10 HUNTNGTN EXP
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.5m (159.1ft)

Find on map >>   Show street view

Structure Number: 665,  Location: 3.0 Mi N of JCT RI 37 (Lat: 41.781894,  Lng: -71.423492),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 110,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-95 NB & SB, AMTRAK,  Facility Carried by Structure: RI 10 HUNTNGTN EXP
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.5m (159.1ft)

Find on map >>   Show street view

Structure Number: 666,  Location: 2.2 Mi S of JCT I-195 (Lat: 41.780806,  Lng: -71.424836),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 110,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-95 NB & SB,  Facility Carried by Structure: RI 10 RAMP DB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 668,  Location: 0.1 Mi W of JCT I-95 (Lat: 41.782678,  Lng: -71.430653),  Route carried "under" structure: State highway 10,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 51,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: RI 10 HUNTINGTON EXPRESS,  Facility Carried by Structure: PONTIAC AV
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 675,  Location: 0.5 Mi E of JCT I-95 (Lat: 41.775614,  Lng: -71.418428),  Route carried "under" structure: State highway 10,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 20,200 (year 2021),  Truck Traffic: 4%,  Features Intersected: RI 10 NORTH, RAMP LANE,  Facility Carried by Structure: RI 12 PARK AV
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 676,  Location: 0.3 Mi W of JCT US 1 (Lat: 41.777036,  Lng: -71.426231),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 10,900 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-95 NB & SB,  Facility Carried by Structure: RI 12 PARK AV
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.2m (89.2ft)

Find on map >>   Show street view

Structure Number: 677,  Location: 0.1 Mi W of WELLINGTON AV (Lat: 41.772664,  Lng: -71.427828),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 147,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-95 NB & SB,  Facility Carried by Structure: LAURENS ST
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 678,  Location: 0.1 Mi W of WELLINGTON AV (Lat: 41.767219,  Lng: -71.429803),  Route carried "under" structure: Interstate 95,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 147,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-95 NB & SB,  Facility Carried by Structure: MILFORD ST
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.2m (89.2ft)

Find on map >>   Show street view

Structure Number: 728,  Location: 0.2 Mi E of JCT RI 5 (Lat: 41.755656,  Lng: -71.480244),  Route carried "under" structure: Interstate 295,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 31,251 (year 2021),  Truck Traffic: 10%,  Features Intersected: I-295 NB,  Facility Carried by Structure: RI 37 EB & WB
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 7282,  Location: 0.2 MI E of JCT RI 5 (Lat: 41.755442,  Lng: -71.481194),  Route carried "under" structure: Interstate 295,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 31,251 (year 2021),  Truck Traffic: 10%,  Features Intersected: I-295 SB,  Facility Carried by Structure: RI 37 EB & WB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 729,  Location: 1.25 Mi S of JCT RI 5 (Lat: 41.766831,  Lng: -71.482028),  Route carried "under" structure: Interstate 295,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 11,658 (year 2021),  Truck Traffic: 5%,  Features Intersected: I-295 NB,  Facility Carried by Structure: RI 51 PHENIX AV
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 7292,  Location: 1.25 Mi S of JCT RI 5 (Lat: 41.765533,  Lng: -71.482506),  Route carried "under" structure: Interstate 295,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 11,658 (year 2021),  Truck Traffic: 5%,  Features Intersected: I-295 SB,  Facility Carried by Structure: RI 51 PHENIX AV
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.5m (90.2ft)

Find on map >>   Show street view

Structure Number: 731,  Location: 1.6 Mi W of JCT RI 5 (Lat: 41.780350,  Lng: -71.500944),  Route carried "under" structure: Interstate 295,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 9,841 (year 2021),  Truck Traffic: 9%,  Features Intersected: I-295 NB & SB,  Facility Carried by Structure: RI 12 SCITUATE AV
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 7325,  Location: I-295 @ Exit 4 (Lat: 41.788956,  Lng: -71.506061),  Route carried "under" structure: State highway 14,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2008),  Features Intersected: RI 14 PLAINFIELD PIKE,  Facility Carried by Structure: I-295 NB
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 7327,  Location: I-295 @ Exit 4 (Lat: 41.788925,  Lng: -71.506592),  Route carried "under" structure: State highway 14,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 42,300 (year 2021),  Truck Traffic: 32%,  Features Intersected: RI 14 PLAINFIELD PIKE,  Facility Carried by Structure: I-295 SB
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Discuss Cranston, Rhode Island (RI) on our hugely popular Rhode Island forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.