Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Danville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 50Number of bridges
  • 427ft / 130mTotal length
  • $1,089,000Total costs
  • 347,005Total average daily traffic
  • 94,859Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Danville
  • No street view available for this location

New bridges in Danville, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 21940-1949
  • 31950-1959
  • 211960-1969
  • 91970-1979
  • 31980-1989
  • 51990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Danville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 71980-1989
  • 11990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Danville, PA
Average Bridge Truck Traffic in Danville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.8%Very good
  • 40.6%Good
  • 21.9%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.8%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 15.6%Fair
  • 3.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.1%Very good
  • 56.3%Good
  • 34.4%Satisfactory
  • 6.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.9%Very good
  • 8.6%Good
  • 20.0%Satisfactory
  • 34.3%Fair
  • 14.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 46843,  Location: 1.0 MI NE OF MAUSDALE (Lat: 40.993517,  Lng: -76.618797),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 45 (year 2017),  Average Future Daily Traffic: 53 (year 2039),  Design Load: HL 93,  Features Intersected: MAHONING CREEK,  Facility Carried by Structure: T-386 CTY BR#20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12488,  Location: 4 MI E OF DANVILLE EXIT (Lat: 41.003333,  Lng: -76.566667),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 15,264 (year 2021),  Truck Traffic: 45%,  Features Intersected: I-80 EBL & WBL,  Facility Carried by Structure: W HEMLOCKRD SR4053
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 12488,  Location: 4 MI E OF DANVILLE EXIT (Lat: 41.003333,  Lng: -76.566667),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 14,851 (year 2021),  Truck Traffic: 45%,  Features Intersected: I-80 EBL & WBL,  Facility Carried by Structure: W HEMLOCKRD SR4053
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 28351,  Location: DANVILLE INTERCHANGE (Lat: 40.996153,  Lng: -76.644517),  Route carried "under" structure: State highway 54,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 6,873 (year 2021),  Truck Traffic: 13%,  Features Intersected: SR 54 & INDIAN CREEK,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 14.912,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 28351,  Location: DANVILLE INTERCHANGE (Lat: 40.996153,  Lng: -76.644517),  Route carried "under" structure: State highway 54,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 6,650 (year 2021),  Truck Traffic: 13%,  Features Intersected: SR 54 & INDIAN CREEK,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 14.911,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 28352,  Location: DANVILLE INTERCHANGE (Lat: 40.996181,  Lng: -76.644997),  Route carried "under" structure: State highway 54,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 6,873 (year 2021),  Truck Traffic: 13%,  Features Intersected: SR 54 & INDIAN CREEK,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 14.912,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 28352,  Location: DANVILLE INTERCHANGE (Lat: 40.996181,  Lng: -76.644997),  Route carried "under" structure: State highway 54,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 6,650 (year 2021),  Truck Traffic: 13%,  Features Intersected: SR 54 & INDIAN CREEK,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 14.911,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 28374,  Location: 4.5 MI NE OF DANVILLE (Lat: 40.999944,  Lng: -76.615253),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 15,264 (year 2021),  Truck Traffic: 45%,  Features Intersected: OVER I-80 EBL AND WBL,  Facility Carried by Structure: SR 642
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 14.655,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 28374,  Location: 4.5 MI NE OF DANVILLE (Lat: 40.999944,  Lng: -76.615253),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 14,851 (year 2021),  Truck Traffic: 45%,  Features Intersected: OVER I-80 EBL AND WBL,  Facility Carried by Structure: SR 642
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 14.602,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 28403,  Location: 2.5 MI E OF DANVILLE EXIT (Lat: 41.002375,  Lng: -76.592081),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 15,264 (year 2021),  Truck Traffic: 45%,  Features Intersected: SR 2007 OVER I-80,  Facility Carried by Structure: SR 2007
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 16.298,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 28403,  Location: 2.5 MI E OF DANVILLE EXIT (Lat: 41.002375,  Lng: -76.592081),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 14,851 (year 2021),  Truck Traffic: 45%,  Features Intersected: SR 2007 OVER I-80,  Facility Carried by Structure: SR 2007
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 16.203,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Discuss Danville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.