Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Edmore, Michigan (MI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 40Number of bridges
  • 387ft / 118mTotal length
  • $415,000Total costs
  • 257,195Total average daily traffic
  • 20,582Total average daily truck traffic
  • 337,476Total future (year 1977) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Edmore
  • No street view available for this location

New bridges in Edmore, MI - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 41930-1939
  • 21940-1949
  • 11950-1959
  • 121960-1969
  • 41970-1979
  • 51980-1989
  • 31990-1999
  • 22000-2009
  • 32010-2019
  • 22020-2022
Reconstructed bridges in Edmore, MI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Edmore, MI
Average Bridge Truck Traffic in Edmore, MI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Excellent
  • 5.6%Very good
  • 47.2%Good
  • 30.6%Satisfactory
  • 8.3%Fair
  • 2.8%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Excellent
  • 13.9%Very good
  • 30.6%Good
  • 36.1%Satisfactory
  • 11.1%Fair
  • 2.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.8%Excellent
  • 13.9%Very good
  • 36.1%Good
  • 41.7%Satisfactory
  • 5.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.2%Excellent
  • 19.4%Very good
  • 22.6%Good
  • 41.9%Satisfactory
  • 9.7%Fair
  • 3.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 10895,  Location: 2.5 MI S OF US-12 (Lat: 42.171572,  Lng: -83.684383),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 6.30m (20.67ft),  Average Daily Traffic: 150 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 90 (year 1977),  Design Load: H 15,  Features Intersected: US-23,  Facility Carried by Structure: BEMIS RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 7.237,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.1m (69.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Discuss Edmore, Michigan (MI) on our hugely popular Michigan forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.