Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Grandview, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 58Number of bridges
  • 594ft / 181mTotal length
  • $2,329,000Total costs
  • 885,004Total average daily traffic
  • 105,966Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Grandview
  • No street view available for this location

New bridges in Grandview, MO - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 51960-1969
  • 71970-1979
  • 71980-1989
  • 41990-1999
  • 182000-2009
  • 142010-2019
Reconstructed bridges in Grandview, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 31980-1989
  • 01990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Grandview, MO
Average Bridge Truck Traffic in Grandview, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 40.6%Good
  • 46.9%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.8%Excellent
  • 6.3%Very good
  • 43.8%Good
  • 28.1%Satisfactory
  • 3.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 21.9%Excellent
  • 15.6%Very good
  • 21.9%Good
  • 34.4%Satisfactory
  • 6.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.3%Very good
  • 34.8%Good
  • 34.8%Satisfactory
  • 26.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 32207,  Location: S 25 T 47 N R 33 W (Lat: 38.857928,  Lng: -94.527267),  Route carried "under" structure: State highway 150,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 7,778 (year 2021),  Truck Traffic: 7%,  Features Intersected: MO 150,  Facility Carried by Structure: OR 49 N
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 32.535,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 33162,  Location: S 35 T 47 N R 33 W (Lat: 38.858631,  Lng: -94.546717),  Route carried "under" structure: State highway 150,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 9,934 (year 2021),  Truck Traffic: 3%,  Features Intersected: MO 150,  Facility Carried by Structure: BOTTS RD S
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 34.220,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.8m (68.2ft)

Find on map >>   Show street view

Structure Number: 33162,  Location: S 35 T 47 N R 33 W (Lat: 38.858631,  Lng: -94.546717),  Route carried "under" structure: State highway 150,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 11,261 (year 2021),  Truck Traffic: 5%,  Features Intersected: MO 150,  Facility Carried by Structure: BOTTS RD S
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 7.075,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.8m (68.2ft)

Find on map >>   Show street view

Structure Number: 33987,  Location: S 35 T 47 N R 33 W (Lat: 38.858883,  Lng: -94.551939),  Route carried "under" structure: State highway 150,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 9,934 (year 2021),  Truck Traffic: 3%,  Features Intersected: MO 150
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 35.291,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 33987,  Location: S 35 T 47 N R 33 W (Lat: 38.858883,  Lng: -94.551939),  Route carried "under" structure: State highway 150,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 11,261 (year 2021),  Truck Traffic: 5%,  Features Intersected: MO 150
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 6.003,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 35265,  Location: S 14 T 47 N R 33 W (Lat: 38.888892,  Lng: -94.525158),  Route carried "under" structure: Interstate 49,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 41,668 (year 2021),  Truck Traffic: 17%,  Features Intersected: IS 49,  Facility Carried by Structure: MAIN ST E
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 289.982,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.6m (93.8ft)

Find on map >>   Show street view

Structure Number: 35265,  Location: S 14 T 47 N R 33 W (Lat: 38.888892,  Lng: -94.525158),  Route carried "under" structure: Interstate 49,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 54,526 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 49,  Facility Carried by Structure: MAIN ST E
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 6.088,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.6m (93.8ft)

Find on map >>   Show street view

Structure Number: 35395,  Location: S 35 T 47 N R 33 W (Lat: 38.843647,  Lng: -94.529444),  Route carried "under" structure: Interstate 49,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 35,708 (year 2021),  Truck Traffic: 17%,  Features Intersected: IS 49,  Facility Carried by Structure: 155TH ST E
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 284.953,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 35395,  Location: S 35 T 47 N R 33 W (Lat: 38.843647,  Lng: -94.529444),  Route carried "under" structure: Interstate 49,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 49,628 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 49,  Facility Carried by Structure: 155TH ST E
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 11.116,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 66,  Location: S 12 T 47 N R 33 W (Lat: 38.908203,  Lng: -94.523778),  Route carried "under" structure: Interstate 49,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 48,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: IS 49,  Facility Carried by Structure: BLUE RIDGE BLVD S
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 3.953,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 66,  Location: S 12 T 47 N R 33 W (Lat: 38.908203,  Lng: -94.523778),  Route carried "under" structure: Interstate 49,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 47,288 (year 2021),  Truck Traffic: 17%,  Features Intersected: IS 49,  Facility Carried by Structure: BLUE RIDGE BLVD S
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 292.135,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Discuss Grandview, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.