Bridge Statistics for Greenville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 57Number of bridges
  • 679ft / 207mTotal length
  • $70,882,000Total costs
  • 446,352Total average daily traffic
  • 102,193Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greenville
  • No street view available for this location

New bridges in Greenville, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 11940-1949
  • 41950-1959
  • 321960-1969
  • 51970-1979
  • 51980-1989
  • 21990-1999
  • 42000-2009
Reconstructed bridges in Greenville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in Greenville, AL
Average Bridge Truck Traffic in Greenville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Very good
  • 14.3%Good
  • 42.9%Satisfactory
  • 35.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.6%Very good
  • 28.6%Good
  • 32.1%Satisfactory
  • 32.1%Fair
  • 3.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Very good
  • 21.4%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 33.3%Good
  • 38.9%Satisfactory
  • 5.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Good
  • 72.2%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 18312,  Location: MASHVILLE (Lat: 31.809850,  Lng: -86.541533),  Route carried "on" structure: County highway 56,  Year Built: 2002,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 82 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 190 (year 2040),  Design Load: HS 20,  Features Intersected: FORK OF FOUR MILE BRANCH,  Facility Carried by Structure: CR. 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18766,  Location: 1.5 MI. E. MASHVILLE ?? (Lat: 31.816667,  Lng: -86.600000),  Route carried "on" structure: County highway 65,  Year Built: 2004,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 224 (year 2018),  Truck Traffic: 26%,  Average Future Daily Traffic: 340 (year 2040),  Design Load: HS 20,  Features Intersected: FOUR MILE MILL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $789,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18782,  Location: PERSIMMON CRK * I-65 (Lat: 31.868700,  Lng: -86.622200),  Route carried "on" structure: County highway 41,  Year Built: 1968,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 953 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,492 (year 2034),  Design Load: HS 20,  Features Intersected: PERSIMMON CREEK
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $542,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21581,  Location: 1100' from sch highlands (Lat: 31.817861,  Lng: -86.629667),  Route carried "on" structure: State lands road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 520 (year 2040),  Design Load: HS 20,  Features Intersected: Branch,  Facility Carried by Structure: Government Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.507,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $428,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21582,  Location: 800' from Sch Highlands (Lat: 31.816889,  Lng: -86.625139),  Route carried "on" structure: State lands road 3,  Year Built: 1980,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 520 (year 2040),  Design Load: HS 20,  Features Intersected: Branch,  Facility Carried by Structure: Ogelsby Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 272,  Location: GRNVILLE-.2MI E OF AL 185 (Lat: 31.828333,  Lng: -86.628333),  Route carried "under" structure: State highway 10,  Year Built: 1925,  Structure Length: 0. m,  Average Daily Traffic: 6,120 (year 2013),  Truck Traffic: 4%,  Features Intersected: AL 10,  Facility Carried by Structure: CSX RR
Minimum Vertical Clearance: 3.00m (9.84ft),  Kilometerpoint: 198.213,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 4.9m (16.1ft)

Find on map >>   Show street view

Structure Number: 9256,  Location: 1.4 MI S OF AL 10 (Lat: 31.804106,  Lng: -86.669539),  Route carried "under" structure: Interstate 65,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 25,990 (year 2013),  Truck Traffic: 27%,  Features Intersected: I65,  Facility Carried by Structure: CO RD 22
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 203.297,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 9259,  Location: AL 10 AND I65 INTERCHANGE (Lat: 31.822925,  Lng: -86.665031),  Route carried "under" structure: State highway 10,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 4,370 (year 2013),  Truck Traffic: 7%,  Features Intersected: AL 10,  Facility Carried by Structure: I65 SBL
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 194.520,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 926,  Location: AL 10 AND I65 INTERCHANGE (Lat: 31.823056,  Lng: -86.663856),  Route carried "under" structure: State highway 10,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 4,370 (year 2013),  Truck Traffic: 7%,  Features Intersected: AL 10,  Facility Carried by Structure: I65 NBL
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 194.620,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 9521,  Location: CO 42 AND I65 (Lat: 31.845722,  Lng: -86.647275),  Route carried "under" structure: Interstate 65,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 29,320 (year 2013),  Truck Traffic: 25%,  Features Intersected: I65,  Facility Carried by Structure: CO 42
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 208.452,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 9522,  Location: 1.6 MI N OF AL 185 (Lat: 31.868447,  Lng: -86.622233),  Route carried "under" structure: County highway 41,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 928 (year 2003),  Truck Traffic: 1%,  Features Intersected: CO RD 41 * PERSIMMON CRK,  Facility Carried by Structure: I65 SBL
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 2.699,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 9523,  Location: 1.6 MI N OF AL 185 (Lat: 31.868331,  Lng: -86.621989),  Route carried "under" structure: County highway 41,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 640 (year 2003),  Truck Traffic: 1%,  Features Intersected: CO RD 41 * PERSIMMON CRK,  Facility Carried by Structure: I65 NBL
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 2.260,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 9526,  Location: I65 OVER CO 45 (Lat: 31.894000,  Lng: -86.602244),  Route carried "under" structure: County highway 45,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 646 (year 2003),  Truck Traffic: 1%,  Features Intersected: CO 45,  Facility Carried by Structure: I65 SBL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 50.239,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 9527,  Location: I65 OVER CO 45 (Lat: 31.893803,  Lng: -86.602061),  Route carried "under" structure: County highway 45,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 646 (year 2003),  Truck Traffic: 1%,  Features Intersected: CO 45,  Facility Carried by Structure: I65 NBL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 50.239,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 13508,  Location: CO RD 30 * I65 (Lat: 31.772956,  Lng: -86.692067),  Route carried "under" structure: Interstate 65,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 25,990 (year 2013),  Truck Traffic: 27%,  Features Intersected: I65,  Facility Carried by Structure: CO RD 30
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 199.145,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16642,  Location: I-65 * AL 185 INT (Lat: 31.850161,  Lng: -86.640761),  Route carried "under" structure: Interstate 65,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 29,320 (year 2013),  Truck Traffic: 25%,  Features Intersected: I-65,  Facility Carried by Structure: AL 185
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 209.289,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)