Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hamilton, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 76Number of bridges
  • 948ft / 289mTotal length
  • $147,751,000Total costs
  • 250,048Total average daily traffic
  • 70,071Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hamilton
  • No street view available for this location

New bridges in Hamilton, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 111950-1959
  • 61960-1969
  • 51970-1979
  • 261980-1989
  • 131990-1999
  • 52000-2009
  • 62010-2019
Reconstructed bridges in Hamilton, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Hamilton, AL
Average Bridge Truck Traffic in Hamilton, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.4%Excellent
  • 13.8%Very good
  • 48.3%Good
  • 27.6%Satisfactory
  • 6.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.4%Excellent
  • 17.2%Very good
  • 62.1%Good
  • 6.9%Satisfactory
  • 10.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.4%Excellent
  • 24.1%Very good
  • 55.2%Good
  • 17.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.0%Very good
  • 20.0%Good
  • 46.0%Satisfactory
  • 16.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Very good
  • 18.8%Good
  • 62.5%Satisfactory
  • 15.6%Fair
Find on map >>   Show street view

Structure Number: 15528,  Location: 3.6 MI W JCT AL-253 (Lat: 34.117028,  Lng: -87.860778),  Route carried "on" structure: US 278,  Year Built: 1992,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: HS 20,  Features Intersected: Creek,  Facility Carried by Structure: AL-74
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.908,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,431,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $1,574,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15717,  Location: 2.6 MI E US-43 (Lat: 34.049508,  Lng: -87.933750),  Route carried "on" structure: County highway 4,  Year Built: 1992,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 121 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 300 (year 2040),  Design Load: HS 20,  Features Intersected: I-22,  Facility Carried by Structure: CR-2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.389,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,079,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $2,287,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16044,  Location: JCT US 43 * AL-4 (Lat: 34.072064,  Lng: -87.975950),  Route carried "on" structure: Interstate 22,  Year Built: 1992,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 4,920 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 6,666 (year 2040),  Design Load: HS 20,  Features Intersected: US-43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.196,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.37m (27.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,412,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $2,653,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16045,  Location: JCT US 43 AL-4 (Lat: 34.071806,  Lng: -87.975894),  Route carried "on" structure: Interstate 22,  Year Built: 1992,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 4,920 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 6,666 (year 2040),  Design Load: HS 20,  Features Intersected: US-43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.196,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 66.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.37m (27.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,412,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $2,653,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16059,  Location: 0.9 MI E OF US-43 (Lat: 34.067972,  Lng: -87.961222),  Route carried "on" structure: Interstate 22,  Year Built: 1992,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 10,120 (year 2013),  Truck Traffic: 34%,  Average Future Daily Traffic: 13,711 (year 2038),  Design Load: HS 20,  Features Intersected: Dougan Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.645,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.0m (78.7ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,075,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $3,383,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16314,  Location: 1.6 KM E OF CO RD 11 (Lat: 34.167042,  Lng: -88.090261),  Route carried "on" structure: County highway 94,  Year Built: 1994,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 390 (year 2001),  Truck Traffic: 20%,  Average Future Daily Traffic: 982 (year 2036),  Design Load: HS 20,  Features Intersected: BOARDTREE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 67.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,053,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,158,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16315,  Location: 1.3 KM E OF CO RD 11 (Lat: 34.166700,  Lng: -88.093550),  Route carried "on" structure: County highway 94,  Year Built: 1994,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 390 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 982 (year 2036),  Design Load: HS 20,  Features Intersected: BOARDTREE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18094,  Location: 0.3 MI. East AL-17 (Lat: 34.141306,  Lng: -87.983194),  Route carried "on" structure: US 278,  Year Built: 2008,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 5,055 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: Ragsdale Creek,  Facility Carried by Structure: AL-74
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.095,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.8m (71.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,207,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $3,528,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18587,  Location: 1.1 MI E JCT US-43 (Lat: 34.143333,  Lng: -87.970167),  Route carried "on" structure: US 278,  Year Built: 2015,  Status: Open,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,000 (year 2041),  Design Load: HS 20,  Features Intersected: Buttahatchee River,  Facility Carried by Structure: AL-74
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.366,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.01m (39.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $6,917,000,  Roadway Improvement Cost: $692,000,  Total Project Cost: $7,609,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18663,  Location: 0.2 MI W JCT US 43 (Lat: 34.116942,  Lng: -87.998694),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 280 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2036),  Design Load: HS 20,  Features Intersected: KEY BRANCH,  Facility Carried by Structure: 10 TH AVE S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 83.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $408,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18664,  Location: 0.3 MI W OF JCT US 43 (Lat: 34.110275,  Lng: -88.005683),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 300 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2036),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: STEELE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $265,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1883,  Location: 1.5 MILES EAST OF ST 171 (Lat: 34.131514,  Lng: -87.981486),  Route carried "on" structure: County highway 42,  Year Built: 2004,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 1,751 (year 2003),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,989 (year 2035),  Design Load: HS 20,  Features Intersected: BUTTAHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.42m (37.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,663,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $2,929,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1901,  Location: 2.5 MI. NE. HENSON SPRING (Lat: 34.032389,  Lng: -88.026722),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 50 (year 2003),  Average Future Daily Traffic: 75 (year 2032),  Design Load: HS 20,  Features Intersected: CANTRELL MILL CREEK,  Facility Carried by Structure: FOUR OAKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 88.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.27m (7.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $852,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $937,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20123,  Location: 2 MI S JCT AL-17 (Lat: 34.105944,  Lng: -87.989089),  Route carried "on" structure: US 43,  Year Built: 2017,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 3,891 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,000 (year 2041),  Design Load: HL 93,  Features Intersected: Buttahatchee River,  Facility Carried by Structure: AL-171
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.432,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 13.63m (44.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $7,851,000,  Roadway Improvement Cost: $785,000,  Total Project Cost: $8,636,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 209,  Location: 1/2 mile east of us 43 (Lat: 34.149908,  Lng: -87.977139),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 509 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 758 (year 2038),  Design Load: HS 20,  Features Intersected: Williams Creek,  Facility Carried by Structure: Grandview Drive
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,544,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,698,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20947,  Location: 6 miles east of Miss line (Lat: 34.158031,  Lng: -88.100756),  Route carried "on" structure: County highway 11,  Year Built: 2018,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 100 (year 2001),  Average Future Daily Traffic: 159 (year 2035),  Design Load: HS 20,  Features Intersected: Boardtree Creek
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,468,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,615,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20948,  Location: 6 miles east of Miss Line (Lat: 34.145150,  Lng: -88.094836),  Route carried "on" structure: County highway 9,  Year Built: 2019,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 44 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 65 (year 2039),  Design Load: HS 20,  Features Intersected: BARNESVILLE CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $847,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $932,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21359,  Location: 1700' off St Hwy 253 (Lat: 34.169400,  Lng: -87.836625),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 11 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 16 (year 2038),  Design Load: HS 20,  Features Intersected: Little Camp Creek,  Facility Carried by Structure: Camp Creek Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $411,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2136,  Location: _300' East of St Hwy 19 (Lat: 34.197792,  Lng: -88.069167),  Route carried "on" structure: County highway 122,  Year Built: 2000,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 96 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 143 (year 2038),  Design Load: HS 20,  Features Intersected: _Rason Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $369,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13683,  Location: 3.01 MI W AL-74 (Lat: 34.189889,  Lng: -88.108556),  Route carried "under" structure: Interstate 22,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 11,620 (year 2018),  Truck Traffic: 33%,  Features Intersected: I-22,  Facility Carried by Structure: CR-11
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 7.643,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 13684,  Location: 1.45 MI W AL-74 (Lat: 34.181861,  Lng: -88.086722),  Route carried "under" structure: Interstate 22,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 11,620 (year 2018),  Truck Traffic: 33%,  Features Intersected: I-22,  Facility Carried by Structure: CR-9
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 9.986,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 14503,  Location: JCT AL-74 AND AL-4 (Lat: 34.167222,  Lng: -88.065167),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 11,490 (year 2018),  Truck Traffic: 38%,  Features Intersected: I-22,  Facility Carried by Structure: AL-74
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 12.575,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 14541,  Location: JCT AL-17 AND AL-4 (Lat: 34.120014,  Lng: -88.045828),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 11,620 (year 2019),  Truck Traffic: 33%,  Features Intersected: I-22,  Facility Carried by Structure: AL-17
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 11.399,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 14544,  Location: JCT AL-19 AND AL-4 (Lat: 34.147333,  Lng: -88.059583),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 11,620 (year 2019),  Truck Traffic: 33%,  Features Intersected: I-22,  Facility Carried by Structure: AL-19
Minimum Vertical Clearance: 6.20m (20.34ft),  Kilometerpoint: 9.189,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 14642,  Location: 1.2 MI S AL-19 (Lat: 34.130833,  Lng: -88.058278),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 11,490 (year 2018),  Truck Traffic: 38%,  Features Intersected: I-22,  Facility Carried by Structure: CR-11
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 16.758,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 14643,  Location: 0.9 MI S AL-17 (Lat: 34.113778,  Lng: -88.030972),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 11,330 (year 2018),  Truck Traffic: 38%,  Features Intersected: I-22,  Facility Carried by Structure: CR-11
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 20.020,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 14644,  Location: 2.8 MI W AL-171 (Lat: 34.095472,  Lng: -88.013972),  Route carried "under" structure: County highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2018),  Features Intersected: Buttahatchee River,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 14.019,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 14645,  Location: 2.8 MI W OF AL-171 (Lat: 34.095778,  Lng: -88.013972),  Route carried "under" structure: County highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2018),  Features Intersected: Buttahatchee River,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 23.461,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 14646,  Location: 2.4 MI W AL-171 (Lat: 34.090778,  Lng: -88.008361),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 9,840 (year 2018),  Truck Traffic: 38%,  Features Intersected: I-22,  Facility Carried by Structure: CR-35
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 23.157,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 14647,  Location: 1.4 MI W AL-171 (Lat: 34.079250,  Lng: -87.996639),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 9,840 (year 2018),  Truck Traffic: 38%,  Features Intersected: I-22,  Facility Carried by Structure: CR-55
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 25.132,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 14648,  Location: 0.3 MI N AL-171 (Lat: 34.072250,  Lng: -87.981389),  Route carried "under" structure: Interstate 22,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 9,840 (year 2018),  Truck Traffic: 38%,  Features Intersected: I-22,  Facility Carried by Structure: Berryhill Road
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 26.889,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 15717,  Location: 2.6 MI E US-43 (Lat: 34.049508,  Lng: -87.933750),  Route carried "under" structure: Interstate 22,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 10,120 (year 2018),  Truck Traffic: 34%,  Features Intersected: I-22,  Facility Carried by Structure: CR-2
Minimum Vertical Clearance: 7.49m (24.57ft),  Kilometerpoint: 31.886,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 16044,  Location: JCT US 43 * AL-4 (Lat: 34.072064,  Lng: -87.975950),  Route carried "under" structure: US 43,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 6,360 (year 2018),  Truck Traffic: 14%,  Features Intersected: US-43,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 110.398,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 16045,  Location: JCT US 43 AL-4 (Lat: 34.071806,  Lng: -87.975894),  Route carried "under" structure: US 43,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 6,360 (year 2018),  Truck Traffic: 14%,  Features Intersected: US-43,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 110.390,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Discuss Hamilton, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.