Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hurst, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 108Number of bridges
  • 2,851ft / 869mTotal length
  • $3,472,000Total costs
  • 3,918,807Total average daily traffic
  • 128,645Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hurst
  • No street view available for this location

New bridges in Hurst, TX - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 21940-1949
  • 11950-1959
  • 301960-1969
  • 51970-1979
  • 11980-1989
  • 81990-1999
  • 212000-2009
  • 352010-2019
Reconstructed bridges in Hurst, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 31980-1989
  • 61990-1999
Average Bridge Daily Traffic in Hurst, TX
Average Bridge Truck Traffic in Hurst, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 50.0%Good
  • 30.4%Satisfactory
  • 5.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 39.3%Good
  • 26.8%Satisfactory
  • 3.6%Fair
  • 1.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.1%Very good
  • 60.7%Good
  • 21.4%Satisfactory
  • 1.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.4%Very good
  • 78.6%Good
  • 16.7%Satisfactory
  • 2.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 26.3%Good
  • 68.4%Satisfactory
  • 5.3%Fair
Find on map >>   Show street view

Structure Number: 22200000814516,  Location: IH820 ML Viaduct @ SH183 (Lat: 32.832506,  Lng: -97.204097),  Route carried "under" structure: State highway 183,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 77,000 (year 2013),  Truck Traffic: 3%,  Features Intersected: IH 820 ML VIADUCT,  Facility Carried by Structure: IH-820 ML Viaduct
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 11,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.5m (182.1ft)

Find on map >>   Show street view

Structure Number: 22200000814525,  Location: IH820 ML VIADUCT @ SH183 (Lat: 32.834219,  Lng: -97.198672),  Route carried "under" structure: State highway 183,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 38,500 (year 2013),  Truck Traffic: 1%,  Features Intersected: IH 820 EB VIADUCT,  Facility Carried by Structure: IH 820 EB VIADUCT
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2220003640141,  Location: 700' W OF BEDFORD EULESS (Lat: 32.833075,  Lng: -97.202592),  Route carried "under" structure: Ramp State highway 121,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2018),  Truck Traffic: 3%,  Features Intersected: RAMP M
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 38.327,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 22200036401411,  Location: 600' W OF BEDFORD EULESS (Lat: 32.833436,  Lng: -97.202589),  Route carried "under" structure: Ramp State highway 121,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2018),  Truck Traffic: 3%,  Features Intersected: RAMP M
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 38.327,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 22200036401414,  Location: SH 121 AT BEDFORD EULESS (Lat: 32.834208,  Lng: -97.200244),  Route carried "under" structure: Ramp City street 121,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,250 (year 2018),  Features Intersected: BEDFORD EULESS RD RAMP M
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 38.277,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 22200036401415,  Location: IH 820 AT SH 121 (Lat: 32.830683,  Lng: -97.203831),  Route carried "under" structure: State highway 121,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 125,000 (year 2018),  Features Intersected: SH 121 ML & RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.117,  Lanes on structure: 1,  Lanes under structure: 11,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 70.7m (232.0ft)

Find on map >>   Show street view

Structure Number: 22200036401663,  Location: 0.4 MI. E. OF PRECINCT LN (Lat: 32.840194,  Lng: -97.177758),  Route carried "under" structure: State highway 121,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 160,780 (year 2010),  Truck Traffic: 5%,  Features Intersected: HURTSVIEW DR,  Facility Carried by Structure: HURSTVIEW DRIVE
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 14,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 22200036401666,  Location: 0.48 MI W OF HURSTVIEW (Lat: 32.838681,  Lng: -97.186117),  Route carried "under" structure: State highway 3029,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 18,500 (year 2013),  Truck Traffic: 1%,  Features Intersected: SH 121/183 EB GP,  Facility Carried by Structure: SH 121/183 EB GP
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 22200036401667,  Location: 0.3 MI W OF FM 3029 (Lat: 32.837861,  Lng: -97.192636),  Route carried "under" structure: State highway 121,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2013),  Truck Traffic: 5%,  Features Intersected: SH 121/183 EB ON RMP
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 22200036401668,  Location: 0.15 MI W OF FM 3029 (Lat: 32.838989,  Lng: -97.190317),  Route carried "under" structure: State highway 121,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 35,500 (year 2013),  Truck Traffic: 5%,  Features Intersected: SH 121/183 WBML EXIT
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 22200036401669,  Location: 0.48 MI W OF HURSTVIEW (Lat: 32.839181,  Lng: -97.185939),  Route carried "under" structure: State highway 3029,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 18,500 (year 2013),  Truck Traffic: 1%,  Features Intersected: SH 121/183 EBML,  Facility Carried by Structure: SH 121/183 EB ML
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 2220003640167,  Location: 0.48 MI W OF HURSTVIEW (Lat: 32.839358,  Lng: -97.186147),  Route carried "under" structure: State highway 3029,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 18,500 (year 2013),  Truck Traffic: 1%,  Features Intersected: SH 121/183 WBML,  Facility Carried by Structure: SH 121/183 WB ML
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 22200036401671,  Location: 0.48 MI W OF HURSTVIEW (Lat: 32.839725,  Lng: -97.186486),  Route carried "under" structure: State highway 3029,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 18,500 (year 2013),  Truck Traffic: 1%,  Features Intersected: SH 121/183 WB GP,  Facility Carried by Structure: SH 121/183 WB GP
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 22200036401673,  Location: 0.3 MI W OF FM 3029 (Lat: 32.837514,  Lng: -97.193219),  Route carried "under" structure: Ramp State highway 121,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 25,800 (year 2013),  Truck Traffic: 5%,  Features Intersected: SH 121/183 EB ON RMP
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 22200036401674,  Location: 0.15 MI W OF FM 3029 (Lat: 32.839275,  Lng: -97.189208),  Route carried "under" structure: ServiceState highway 121,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2013),  Truck Traffic: 5%,  Features Intersected: SH 121 WB GP EXIT
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 22200036401675,  Location: 1.2 MI E OF FM 3029 (Lat: 32.839314,  Lng: -97.167836),  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 8,010 (year 2013),  Features Intersected: SH 121/183 EB GP,  Facility Carried by Structure: SH 121/183 EB GP
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 22200036401676,  Location: 1.2 MI E OF FM 3029 (Lat: 32.839658,  Lng: -97.168008),  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 8,010 (year 2013),  Features Intersected: Norwood Drive,  Facility Carried by Structure: SH 121/183 EB ML
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 22200036401677,  Location: 1.2 MI E OF FM 3029 (Lat: 32.840053,  Lng: -97.167903),  Route carried "under" structure: City street ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 8,010 (year 2013),  Features Intersected: SH 121/183 WB,  Facility Carried by Structure: SH 121/183 WB ML
Minimum Vertical Clearance: 5.41m (17.75ft),  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 22200036401678,  Location: 1.2 MI E OF FM 3029 (Lat: 32.837339,  Lng: -97.099908),  Route carried "under" structure: City street ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 8,010 (year 2013),  Features Intersected: SH 121/183 WB GP,  Facility Carried by Structure: SH-121/183 WB GP
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Discuss Hurst, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.