Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Las Vegas, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 66Number of bridges
  • 876ft / 267mTotal length
  • $3,806,000Total costs
  • 344,153Total average daily traffic
  • 83,883Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Las Vegas
  • No street view available for this location

New bridges in Las Vegas, NM - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 31910-1919
  • 21940-1949
  • 21950-1959
  • 41960-1969
  • 171970-1979
  • 231980-1989
  • 51990-1999
  • 32000-2009
  • 52010-2019
  • 12020-2022
Reconstructed bridges in Las Vegas, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 01980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Las Vegas, NM
Average Bridge Truck Traffic in Las Vegas, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 43.9%Good
  • 41.5%Satisfactory
  • 12.2%Fair
  • 2.4%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Very good
  • 48.8%Good
  • 31.7%Satisfactory
  • 14.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.9%Very good
  • 43.9%Good
  • 24.4%Satisfactory
  • 26.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.6%Very good
  • 38.6%Good
  • 45.5%Satisfactory
  • 2.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 6.7%Excellent
  • 53.3%Good
  • 33.3%Satisfactory
  • 6.7%Fair
Find on map >>   Show street view

Structure Number: 8726,  Location: 0.1 MI N OF BERNALILLO ST (Lat: 35.595158,  Lng: -105.231550),  Route carried "on" structure: City street 47001,  Year Built: 1988,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 162 (year 2020),  Average Future Daily Traffic: 268 (year 2040),  Design Load: HS 20,  Features Intersected: LA MANTECA RIVER,  Facility Carried by Structure: 47-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.024,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018
Find on map >>   Show street view

Structure Number: 8787,  Location: 0.2 MI W OF LOOP-15/VEGAS (Lat: 35.588031,  Lng: -105.218942),  Route carried "on" structure: City street 5562,  Year Built: 1991,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 1,722 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,274 (year 2038),  Design Load: HS 20,  Features Intersected: GALLINAS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.425,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 28.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8937,  Location: JCT PECOS ST/NM104 (Lat: 35.595975,  Lng: -105.211128),  Route carried "on" structure: City street 5662,  Year Built: 1997,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 162 (year 2020),  Average Future Daily Traffic: 268 (year 2040),  Design Load: HS 20,  Features Intersected: OPEN FIELD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8941,  Location: 1.0 M W JCT US 85 & MILLS (Lat: 35.602564,  Lng: -105.228397),  Route carried "on" structure: City street 4560,  Year Built: 1998,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 11,574 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,384 (year 2040),  Design Load: HS 20,  Features Intersected: GALLINAS RIVER,  Facility Carried by Structure: Mills AVE. (LV)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9083,  Location: 0.05 MI E OF NEW MEX. AVE (Lat: 35.586844,  Lng: -105.226864),  Route carried "on" structure: City street 5502,  Year Built: 1997,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 162 (year 2020),  Average Future Daily Traffic: 268 (year 2040),  Design Load: HS 20,  Features Intersected: PAJARITO ARROYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 9177,  Location: 6.4 Mi N LOOP-15-/Vegas (Lat: 35.682489,  Lng: -105.227444),  Route carried "on" structure: State highway 518,  Year Built: 2000,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 3,263 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,804 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.750,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 9222,  Location: STORRIE LAKE PARK (Lat: 35.653561,  Lng: -105.240169),  Route carried "on" structure: State lands road 47007,  Year Built: 2000,  Status: Closed,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 162 (year 2020),  Average Future Daily Traffic: 268 (year 2040),  Design Load: H 15,  Features Intersected: GALLINAS CANAL,  Facility Carried by Structure: SP-4007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 4.1m (13.5ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.4m (11.2ft)

Condition: Deck: Critical,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $500,000 ( Estimate for 2040),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 935,  Location: 0.1 M W JCT GRANT AVE (Lat: 35.622231,  Lng: -105.207300),  Route carried "on" structure: City street 47001,  Year Built: 2004,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 162 (year 2020),  Average Future Daily Traffic: 268 (year 2040),  Design Load: HS 20,  Features Intersected: PECOS ARROYO,  Facility Carried by Structure: 47-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 9623,  Location: 12.2 M N Jct I-25/US-84 (Lat: 35.677900,  Lng: -105.170400),  Route carried "on" structure: County highway 250,  Year Built: 2014,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 593 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,109 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.263,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9651,  Location: 13.1 MI N OF JCT NM-104 (Lat: 35.578608,  Lng: -104.424856),  Route carried "on" structure: State highway 419,  Year Built: 2016,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 49 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 67 (year 2040),  Design Load: HS 20,  Features Intersected: ARROYO MESTENO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.024,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9703,  Location: 3.4 MI NE OF NM-39 (Lat: 35.823403,  Lng: -103.762189),  Route carried "on" structure: State highway 102,  Year Built: 2020,  Status: Open,  Structure Length: 7.67m (25.16ft),  Average Daily Traffic: 80 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: HL 93,  Features Intersected: TEQUESQUITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.451,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $413,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9722,  Location: 18.5 MI SE OF JCT NM-419 (Lat: 35.299511,  Lng: -104.312014),  Route carried "on" structure: State highway 104,  Year Built: 2018,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 181 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 142 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE CUERVO CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 104.363,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9723,  Location: 17.3 MI SE OF JCT NM-419 (Lat: 35.301331,  Lng: -104.341919),  Route carried "on" structure: State highway 104,  Year Built: 2016,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 181 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 142 (year 2038),  Design Load: HS 20,  Features Intersected: PINO CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 102.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7328,  Location: 1.7 M S OF S VEGAS INTRCH (Lat: 35.545764,  Lng: -105.227408),  Route carried "under" structure: Interstate 25,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 10,521 (year 2020),  Truck Traffic: 37%,  Features Intersected: I-25 NBLS/SBLS,  Facility Carried by Structure: FR-2138
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 550.850,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 7331,  Location: 0.9 M S OF S VEGAS INTRCH (Lat: 35.557100,  Lng: -105.224908),  Route carried "under" structure: Interstate 25,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 10,521 (year 2020),  Truck Traffic: 37%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: NM-283
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 552.166,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 7332,  Location: SOUTH LAS VEGAS INTERCHNG (Lat: 35.568839,  Lng: -105.220303),  Route carried "under" structure: State highway 15,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 3,127 (year 2020),  Truck Traffic: 7%,  Features Intersected: LOOP-15/LAS VEGAS,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.233,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 7333,  Location: SOUTH LAS VEGAS INTERCHNG (Lat: 35.569044,  Lng: -105.220497),  Route carried "under" structure: State highway 15,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 3,127 (year 2020),  Truck Traffic: 7%,  Features Intersected: LOOP-15/LAS VEGAS,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.249,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 7893,  Location: 0.2 MI E OF LOOP-15 (Lat: 35.596003,  Lng: -105.210433),  Route carried "under" structure: Interstate 25,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 6,559 (year 2020),  Truck Traffic: 51%,  Features Intersected: I-25/R/R/CITY ST/WATERWY,  Facility Carried by Structure: NM-104
Minimum Vertical Clearance: 9.45m (31.00ft),  Kilometerpoint: 556.869,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 8239,  Location: 1.4 MI S OF JCT NM-104 (Lat: 35.575678,  Lng: -105.212142),  Route carried "under" structure: County highway 47023,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 203 (year 2020),  Truck Traffic: 6%,  Features Intersected: COUNTY RD-21,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.761,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 824,  Location: 1.4 MI S OF JCT NM-104 (Lat: 35.575722,  Lng: -105.212450),  Route carried "under" structure: County highway 47023,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 203 (year 2020),  Truck Traffic: 6%,  Features Intersected: COUNTY RD-21,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.745,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 8251,  Location: 2.0 MI N OF JCT NM-104 (Lat: 35.624650,  Lng: -105.203292),  Route carried "under" structure: State highway 15,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 1,993 (year 2020),  Truck Traffic: 7%,  Features Intersected: LOOP-15,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 6.687,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 8252,  Location: 2.0 MI N OF JCT NM-104 (Lat: 35.624500,  Lng: -105.203600),  Route carried "under" structure: State highway 15,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 4,115 (year 2020),  Truck Traffic: 7%,  Features Intersected: LOOP-15,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 6.671,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 9623,  Location: 12.2 M N Jct I-25/US-84 (Lat: 35.677900,  Lng: -105.170400),  Route carried "under" structure: Interstate 25,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 5,858 (year 2020),  Truck Traffic: 37%,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 566.811,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Discuss Las Vegas, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.