Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Little Rock, Arkansas (AR)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 640Number of bridges
  • 11,677ft / 3,559mTotal length
  • $76,837,000Total costs
  • 14,587,333Total average daily traffic
  • 541,775Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Little Rock
  • No street view available for this location

New bridges in Little Rock, AR - historical statistics
  • New bridges - historical statistics
  • 71920-1929
  • 181930-1939
  • 111940-1949
  • 251950-1959
  • 611960-1969
  • 821970-1979
  • 401980-1989
  • 381990-1999
  • 402000-2009
  • 292010-2019
  • 22020-2022
Reconstructed bridges in Little Rock, AR - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 21960-1969
  • 201970-1979
  • 131980-1989
  • 51990-1999
  • 22000-2009
  • 42010-2019
Average Bridge Daily Traffic in Little Rock, AR
Average Bridge Truck Traffic in Little Rock, AR
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.1%Excellent
  • 13.0%Very good
  • 41.4%Good
  • 32.6%Satisfactory
  • 9.6%Fair
  • 0.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.4%Excellent
  • 18.8%Very good
  • 31.0%Good
  • 29.9%Satisfactory
  • 14.6%Fair
  • 2.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.3%Excellent
  • 16.1%Very good
  • 34.9%Good
  • 33.3%Satisfactory
  • 13.0%Fair
  • 0.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.8%Excellent
  • 41.1%Very good
  • 27.0%Good
  • 9.3%Satisfactory
  • 0.8%Fair
  • 0.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.4%Excellent
  • 20.7%Very good
  • 51.1%Good
  • 21.7%Satisfactory
  • 1.1%Fair
Find on map >>   Show street view

Structure Number: 521,  Location: 2.65 Mi W Of Jct Sh 1 No (Lat: 35.252569,  Lng: -90.841039),  Route carried "on" structure: US 64,  Year Built: 1963,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 3,900 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 4,549 (year 2028),  Design Load: HS 20,  Features Intersected: Caney Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.186,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 66,  Location: 5.3 MI NE CLARK CO LN (Lat: 34.235497,  Lng: -92.947089),  Route carried "on" structure: US 67,  Year Built: 1929,  Year Reconstructed: 1957,  Status: Open,  Structure Length: 14.97m (49.11ft),  Average Daily Traffic: 2,700 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,364 (year 2028),  Design Load: H 15,  Features Intersected: OUACHITA RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.578,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 10.8m (35.4ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.97m (49.11ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Total Project Cost: $699,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 671,  Location: 0.02 MI NO OF JCT SH 116 (Lat: 35.106839,  Lng: -93.923711),  Route carried "on" structure: State highway 23,  Year Built: 1961,  Status: Open,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 2,900 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,893 (year 2028),  Design Load: H 20,  Features Intersected: Petit Jean River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1538,  Location: 1.18 M W US 70 (Lat: 34.754531,  Lng: -92.295081),  Route carried "on" structure: State highway 10,  Year Built: 1930,  Status: Open,  Structure Length: 25.15m (82.51ft),  Average Daily Traffic: 21,884 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,794 (year 2028),  Design Load: HS 20,  Features Intersected: GILL ST, RR, ROSE CREEK
Minimum Vertical Clearance: 7.74m (25.39ft),  Kilometerpoint: 23.282,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 27,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.37m (86.52ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,005,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1926,  Location: .30 MI E JCT OF I-30 (Lat: 34.723750,  Lng: -92.261461),  Route carried "on" structure: State highway 365,  Year Built: 1935,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 15,000 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,443 (year 2028),  Design Load: H 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Roadway Improvement Cost: $362,000,  Total Project Cost: $632,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1938,  Location: 4.17 MI W JCT SH 9 (Lat: 33.862108,  Lng: -92.750469),  Route carried "on" structure: State highway 128,  Year Built: 1952,  Status: Open,  Structure Length: 12.74m (41.80ft),  Average Daily Traffic: 838 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 907 (year 2028),  Design Load: H 15,  Features Intersected: TULIP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.709,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.90m (45.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Roadway Improvement Cost: $117,000,  Total Project Cost: $851,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1939,  Location: 3.61 MI NW JCT SH 9 (Lat: 33.858897,  Lng: -92.741669),  Route carried "on" structure: State highway 128,  Year Built: 1952,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 838 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 907 (year 2028),  Design Load: H 15,  Features Intersected: WHITE OAK CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.808,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.44m (27.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Roadway Improvement Cost: $117,000,  Total Project Cost: $575,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 194,  Location: 0.62 Mi W Jct US71B (Lat: 36.070083,  Lng: -94.166914),  Route carried "on" structure: City street 35820,  Year Built: 1936,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 2,736 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,500 (year 2036),  Design Load: H 15,  Features Intersected: Ar. & Mo. RR - Wash. Co.,  Facility Carried by Structure: Maple Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Roadway Improvement Cost: $262,000,  Total Project Cost: $550,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1972,  Location: 0.94 MI S SH 286 (Lat: 35.052839,  Lng: -92.422228),  Route carried "on" structure: State highway 365,  Year Built: 1935,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 5,200 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,426 (year 2028),  Design Load: H 15,  Features Intersected: STONE DAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.513,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Roadway Improvement Cost: $125,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2113,  Location: 2600 WRIGHT AVE (Lat: 34.731547,  Lng: -92.304078),  Route carried "on" structure: City street 2230,  Year Built: 1940,  Status: Open,  Structure Length: 16.70m (54.79ft),  Average Daily Traffic: 11,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,500 (year 2032),  Design Load: H 15,  Features Intersected: UNION PACIFIC RAILROAD,  Facility Carried by Structure: Wright Ave.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.108,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 9,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.92m (58.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Roadway Improvement Cost: $362,000,  Total Project Cost: $2,198,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2228,  Location: 2.28 M E of SH 27 (Lat: 34.978831,  Lng: -93.351100),  Route carried "on" structure: State highway 28,  Year Built: 1952,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,044 (year 2028),  Design Load: H 15,  Features Intersected: Gilkey Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.669,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.33m (14.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Other Special Inspection Date: July 2021,  Roadway Improvement Cost: $117,000,  Total Project Cost: $368,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2362,  Location: 3.63 MI W SH 300 (Lat: 34.837550,  Lng: -92.551281),  Route carried "on" structure: State highway 10,  Year Built: 1948,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 4,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,574 (year 2028),  Design Load: H 20,  Features Intersected: NOWLIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.06m (16.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Roadway Improvement Cost: $156,000,  Total Project Cost: $535,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2364,  Location: 2.8 MI W SH 300 (Lat: 34.831311,  Lng: -92.538731),  Route carried "on" structure: State highway 10,  Year Built: 1948,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 4,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,574 (year 2028),  Design Load: H 20,  Features Intersected: KINLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.039,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Roadway Improvement Cost: $156,000,  Total Project Cost: $472,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2405,  Location: 2.54 Mi E US 167-Sheridan (Lat: 34.318992,  Lng: -92.357997),  Route carried "on" structure: US 270,  Year Built: 1948,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 6,200 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 8,200 (year 2038),  Design Load: H 20,  Features Intersected: Hubbard Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.088,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Roadway Improvement Cost: $400,000,  Total Project Cost: $915,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2713,  Location: .60 MI S OF SH 300 I-10 (Lat: 34.703097,  Lng: -92.382431),  Route carried "on" structure: State highway 70,  Year Built: 1950,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 10,123 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,258 (year 2028),  Design Load: H 15,  Features Intersected: BRODIE CREEK,  Facility Carried by Structure: SH 5-9 Log 5.57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.273,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Roadway Improvement Cost: $306,000,  Total Project Cost: $702,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2768,  Location: 1.2 MI S JCT I-40 (Lat: 34.744869,  Lng: -92.262919),  Route carried "on" structure: Interstate 30,  Year Built: 1958,  Status: Open,  Structure Length: 92.66m (304.00ft),  Average Daily Traffic: 119,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 150,355 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: SH100 SH10 RR ARK RIV
Minimum Vertical Clearance: 9.08m (29.79ft),  Kilometerpoint: 225.968,  Lanes on structure: 6,  Lanes under structure: 17,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 18.1m (59.4ft), Horizontal Clearance: 54.8m (179.8ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 23,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 92.66m (304.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: September 2021,  Total Project Cost: $13,117,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2979,  Location: .07 MI W OF US 70 (Lat: 34.749869,  Lng: -92.276192),  Route carried "on" structure: State highway 10,  Year Built: 1956,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 27,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,331 (year 2028),  Design Load: HS 20,  Features Intersected: ARCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.069,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Roadway Improvement Cost: $389,000,  Total Project Cost: $691,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2984,  Location: 0.55 MI W OF US 70 I-8 (Lat: 34.752519,  Lng: -92.283439),  Route carried "on" structure: State highway 10,  Year Built: 1956,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 27,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,500 (year 2030),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.296,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Roadway Improvement Cost: $214,000,  Total Project Cost: $595,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3173,  Location: .5 MI E JCT OF US 70 (Lat: 34.678831,  Lng: -92.344081),  Route carried "on" structure: Interstate 30,  Year Built: 1960,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 76,467 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 51,199 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: GEYER SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 213.753,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3174,  Location: 1.1 MI E SH 70 (Lat: 34.678650,  Lng: -92.332611),  Route carried "on" structure: City street 55130,  Year Built: 1960,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 5,400 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,347 (year 2007),  Design Load: H 20,  Features Intersected: I 30-LOG 133.46,  Facility Carried by Structure: STANTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.99m (26.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Roadway Improvement Cost: $199,000,  Total Project Cost: $683,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3175,  Location: 2.0 MI E OF US 70 (Lat: 34.679631,  Lng: -92.319400),  Route carried "on" structure: City street 51770,  Year Built: 1961,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 6,600 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,577 (year 2007),  Design Load: HS 20,  Features Intersected: I 30-LOG 134.22,  Facility Carried by Structure: Scott Hamilton
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.366,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3176,  Location: 3.10 MI E OF US 70 (Lat: 34.688889,  Lng: -92.305819),  Route carried "on" structure: Interstate 30,  Year Built: 1959,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 89,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 55,735 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: 65TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.696,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 19.1m (62.7ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.39m (17.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Total Project Cost: $521,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3177,  Location: 3.30 MI E OF US 70 (Lat: 34.692211,  Lng: -92.303769),  Route carried "on" structure: Interstate 30,  Year Built: 1959,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 89,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 55,735 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: UNION PACIFIC R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 218.114,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Total Project Cost: $551,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3178,  Location: 3.90 MI NE OF US 70 (Lat: 34.699900,  Lng: -92.298981),  Route carried "on" structure: Interstate 30,  Year Built: 1959,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 89,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 55,735 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: LITTLE FOURCHE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 219.033,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Total Project Cost: $534,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3179,  Location: 4.7 MI NE OF US70 (Lat: 34.706061,  Lng: -92.288139),  Route carried "on" structure: Interstate 30,  Year Built: 1961,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 71.29m (233.89ft),  Average Daily Traffic: 89,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 55,735 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: SH 367, RR, CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 220.335,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 35,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 70.26m (230.51ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Total Project Cost: $5,867,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3332,  Location: SO TERMINAL INTCHG (Lat: 34.708361,  Lng: -92.270989),  Route carried "on" structure: Interstate 530,  Year Built: 1960,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 5.78m (18.96ft),  Average Daily Traffic: 45,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 54,439 (year 2028),  Design Load: HS 20,  Features Intersected: I-530 / I-30 SW RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 3363,  Location: 1.2 Mi S. Jct SH10 (Lat: 34.806369,  Lng: -92.525558),  Route carried "on" structure: County highway 41,  Year Built: 1960,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 2,800 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 135 (year 2007),  Design Load: H 15,  Features Intersected: Little Maumelle Rvr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.658,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 344,  Location: I-30 OFF RAMP (Lat: 34.746131,  Lng: -92.263550),  Route carried "on" structure: Ramp State highway 10,  Year Built: 1963,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 2,320 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,444 (year 2025),  Design Load: HS 20,  Features Intersected: 2ND ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.532,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3441,  Location: OFF RAMP I-30 (Lat: 34.746489,  Lng: -92.264300),  Route carried "on" structure: Ramp State highway 10,  Year Built: 1963,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 2,320 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,592 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: 2ND ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.693,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3491,  Location: 4.3 MI E OF I-30 (Lat: 34.745389,  Lng: -92.334489),  Route carried "on" structure: City street 19270,  Year Built: 1965,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 14,375 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,837 (year 2007),  Design Load: HS 20,  Features Intersected: I-630 LOG 4.09,  Facility Carried by Structure: FAIR PARK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3492,  Location: 4.01 MI W I-30 (Lat: 34.744919,  Lng: -92.329261),  Route carried "on" structure: City street 29710,  Year Built: 1965,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 158 (year 1987),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,450 (year 2007),  Design Load: HS 20,  Features Intersected: I 630 SEC 21 LOG 3.80,  Facility Carried by Structure: JONESBORO STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3494,  Location: 3.35 MI W INT I-30 (Lat: 34.744839,  Lng: -92.317689),  Route carried "on" structure: City street 9900,  Year Built: 1965,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 3,946 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,164 (year 2007),  Design Load: HS 20,  Features Intersected: I 630 SEC 21 LOG 3.14,  Facility Carried by Structure: CEDAR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3495,  Location: 3.29 MI W OF I-30 (Lat: 34.744811,  Lng: -92.316589),  Route carried "on" structure: City street 45360,  Year Built: 1965,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 3,588 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,302 (year 2007),  Design Load: HS 20,  Features Intersected: I 630 SEC 21 LOG 3.08,  Facility Carried by Structure: PINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3497,  Location: JCT I-630 & WOODROW ST. (Lat: 34.743739,  Lng: -92.305581),  Route carried "on" structure: City street 63550,  Year Built: 1967,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,920 (year 2007),  Design Load: HS 20,  Features Intersected: I 630 SEC 21 Log 2.43,  Facility Carried by Structure: WOODROW STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Total Project Cost: $606,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 35,  Location: 2.1 MI W JCT I-30 (Lat: 34.743711,  Lng: -92.293869),  Route carried "on" structure: City street 3580,  Year Built: 1980,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 1,685 (year 1987),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,325 (year 2007),  Design Load: HS 20,  Features Intersected: I 630-SEC 21 Log 1.77,  Facility Carried by Structure: BATTERY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3501,  Location: .02 M SO JCT 7TH ST (Lat: 34.744050,  Lng: -92.291450),  Route carried "on" structure: City street 36240,  Year Built: 1980,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 920 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,428 (year 2007),  Design Load: HS 20,  Features Intersected: I 630-SEC 21 Log 1.64,  Facility Carried by Structure: MARSHALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3502,  Location: 1.7 MI W OF JCT I-30 (Lat: 34.743769,  Lng: -92.288219),  Route carried "on" structure: City street 36315,  Year Built: 1980,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 11,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,378 (year 2007),  Design Load: HS 20,  Features Intersected: I 630-SEC 21 Log 1.45,  Facility Carried by Structure: DR MARTIN L. KING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Roadway Improvement Cost: $388,000,  Total Project Cost: $1,135,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3503,  Location: 1.3 MI W JCT I-30 (Lat: 34.741719,  Lng: -92.282619),  Route carried "on" structure: City street 10680,  Year Built: 1979,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 10,633 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,640 (year 2007),  Design Load: HS 20,  Features Intersected: I 630-SEC 21 Log 1.10,  Facility Carried by Structure: CHESTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 5,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Little Rock, Arkansas (AR) on our hugely popular Arkansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.