Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for McNair, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 70Number of bridges
  • 846ft / 258mTotal length
  • $4,860,000Total costs
  • 2,174,800Total average daily traffic
  • 35,661Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for McNair
  • No street view available for this location

New bridges in McNair, VA - historical statistics
  • New bridges - historical statistics
  • 121960-1969
  • 191980-1989
  • 301990-1999
  • 92000-2009
Reconstructed bridges in McNair, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in McNair, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 69.7%Good
  • 27.3%Satisfactory
  • 3.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.2%Very good
  • 57.6%Good
  • 24.2%Satisfactory
  • 3.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.0%Very good
  • 57.6%Good
  • 36.4%Satisfactory
  • 3.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.0%Very good
  • 40.0%Good
  • 40.0%Satisfactory
  • 5.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Good
  • 88.9%Satisfactory
Find on map >>   Show street view

Structure Number: 2100067P,  Location: 1.6 MILES FROM DULLES AIR (Lat: 38.964083,  Lng: -77.428528),  Route carried "on" structure: State lands road ,  Year Built: 1994,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 13,000 (year 2006),  Average Future Daily Traffic: 15,600 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: VA ROUTE 28,  Facility Carried by Structure: DULLES ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.570,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: Metropolitan Washington Airports Service,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2100068P,  Location: 0.50 MILES FROM DULLES AC (Lat: 38.963561,  Lng: -77.438731),  Route carried "on" structure: Ramp Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 1.76m (5.77ft),  Average Daily Traffic: 1,000 (year 2006),  Average Future Daily Traffic: 1,200 (year 2026),  Features Intersected: ECONOMY PARKING CONNECTO,  Facility Carried by Structure: RAMP "G"
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: Metropolitan Washington Airports Service,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6819,  Location: 00.61 665 / 00.10SCL HERN (Lat: 38.952764,  Lng: -77.389003),  Route carried "under" structure: State highway 267,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 99,435 (year 2008),  Features Intersected: RTE 267 & DAR,  Facility Carried by Structure: SBL MONROE ST.
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 25.841,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 6819,  Location: 00.61 665 / 00.10SCL HERN (Lat: 38.952764,  Lng: -77.389003),  Route carried "under" structure: State highway 267,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2008),  Features Intersected: RTE 267 & DAR,  Facility Carried by Structure: SBL MONROE ST.
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 14.915,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 6819,  Location: 00.61 665 / 00.10SCL HERN (Lat: 38.952764,  Lng: -77.389003),  Route carried "under" structure: State highway 267,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2008),  Features Intersected: RTE 267 & DAR,  Facility Carried by Structure: SBL MONROE ST.
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 14.899,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 6819,  Location: 00.61 665 / 00.10SCL HERN (Lat: 38.952764,  Lng: -77.389003),  Route carried "under" structure: State highway 267,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 31,200 (year 1994),  Truck Traffic: 2%,  Features Intersected: RTE 267 & DAR,  Facility Carried by Structure: SBL MONROE ST.
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 25.889,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 11103,  Location: 02.10 668 / 01.21 606 (Lat: 38.961978,  Lng: -77.427397),  Route carried "under" structure: 267,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 90,632 (year 2008),  Features Intersected: DULLES ACCESS RD,  Facility Carried by Structure: Rte. 28 NB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 21.721,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 11103,  Location: 02.10 668 / 01.21 606 (Lat: 38.961978,  Lng: -77.427397),  Route carried "under" structure: Ramp State highway 267,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 90,632 (year 2008),  Features Intersected: DULLES ACCESS RD,  Facility Carried by Structure: Rte. 28 NB
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 21.722,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 11103,  Location: 02.10 668 / 01.21 606 (Lat: 38.961978,  Lng: -77.427397),  Route carried "under" structure: Other road ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 58,285 (year 1994),  Features Intersected: DULLES ACCESS RD,  Facility Carried by Structure: Rte. 28 NB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 24.521,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 11103,  Location: 02.10 668 / 01.21 606 (Lat: 38.961978,  Lng: -77.427397),  Route carried "under" structure: State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 90,632 (year 2008),  Features Intersected: DULLES ACCESS RD,  Facility Carried by Structure: Rte. 28 NB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 21.722,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 11108,  Location: 02.10FR668 / 01.21TO606 (Lat: 38.962000,  Lng: -77.427631),  Route carried "under" structure: State highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1994),  Features Intersected: DULLES ACCESS ROAD,  Facility Carried by Structure: Rte. 28 SB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 11108,  Location: 02.10FR668 / 01.21TO606 (Lat: 38.962000,  Lng: -77.427631),  Route carried "under" structure: State highway 267,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1994),  Features Intersected: DULLES ACCESS ROAD,  Facility Carried by Structure: Rte. 28 SB
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 11108,  Location: 02.10FR668 / 01.21TO606 (Lat: 38.962000,  Lng: -77.427631),  Route carried "under" structure: State highway 267,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1994),  Features Intersected: DULLES ACCESS ROAD,  Facility Carried by Structure: Rte. 28 SB
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 11108,  Location: 02.10FR668 / 01.21TO606 (Lat: 38.962000,  Lng: -77.427631),  Route carried "under" structure: State highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1994),  Features Intersected: DULLES ACCESS ROAD,  Facility Carried by Structure: Rte. 28 SB
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 23873,  Location: 00.60FR28/00.50TO DAAR (Lat: 38.963936,  Lng: -77.427381),  Route carried "under" structure: State highway 28,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 1994),  Features Intersected: SULLY ROAD AND RAMP F,  Facility Carried by Structure: SULLY RD. (RAMP A)
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 23873,  Location: 00.60FR28/00.50TO DAAR (Lat: 38.963936,  Lng: -77.427381),  Route carried "under" structure: State highway 28,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 1994),  Features Intersected: SULLY ROAD AND RAMP F,  Facility Carried by Structure: SULLY RD. (RAMP A)
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 23873,  Location: 00.60FR28/00.50TO DAAR (Lat: 38.963936,  Lng: -77.427381),  Route carried "under" structure: Ramp State highway 28,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 1994),  Features Intersected: SULLY ROAD AND RAMP F,  Facility Carried by Structure: SULLY RD. (RAMP A)
Minimum Vertical Clearance: 6.38m (20.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 23879,  Location: 00.30FR28/00.60TO DAAR (Lat: 38.962817,  Lng: -77.425294),  Route carried "under" structure: Other road 267,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1994),  Features Intersected: RTE.267 CD; EB & WB DAAR,  Facility Carried by Structure: SULLY RD. (RAMP A)
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 23879,  Location: 00.30FR28/00.60TO DAAR (Lat: 38.962817,  Lng: -77.425294),  Route carried "under" structure: Other road ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 1994),  Features Intersected: RTE.267 CD; EB & WB DAAR,  Facility Carried by Structure: SULLY RD. (RAMP A)
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 23879,  Location: 00.30FR28/00.60TO DAAR (Lat: 38.962817,  Lng: -77.425294),  Route carried "under" structure: Other road ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 1994),  Features Intersected: RTE.267 CD; EB & WB DAAR,  Facility Carried by Structure: SULLY RD. (RAMP A)
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 24101,  Location: 02.60FR606/01.40TO657 (Lat: 38.965525,  Lng: -77.428961),  Route carried "under" structure: Other road 28,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 1994),  Truck Traffic: 5%,  Features Intersected: SULLY ROAD (RTE. 28),  Facility Carried by Structure: DULLES GREENWAY WB
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 63.620,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 65.2m (213.9ft)

Find on map >>   Show street view

Structure Number: 24101,  Location: 02.60FR606/01.40TO657 (Lat: 38.965525,  Lng: -77.428961),  Route carried "under" structure: State highway 28,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 111,095 (year 2008),  Truck Traffic: 2%,  Features Intersected: SULLY ROAD (RTE. 28),  Facility Carried by Structure: DULLES GREENWAY WB
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 63.620,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 65.2m (213.9ft)

Find on map >>   Show street view

Structure Number: 24103,  Location: 02.60FR606/01.40TO657 (Lat: 38.964989,  Lng: -77.428647),  Route carried "under" structure: State highway 28,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 111,095 (year 2008),  Truck Traffic: 2%,  Features Intersected: SULLY ROAD (ROUTE 28),  Facility Carried by Structure: DULLES GREENWAY EB
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 63.604,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 65.2m (213.9ft)

Find on map >>   Show street view

Structure Number: 24103,  Location: 02.60FR606/01.40TO657 (Lat: 38.964989,  Lng: -77.428647),  Route carried "under" structure: State highway 28,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 1994),  Truck Traffic: 5%,  Features Intersected: SULLY ROAD (ROUTE 28),  Facility Carried by Structure: DULLES GREENWAY EB
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 65.2m (213.9ft)

Find on map >>   Show street view

Structure Number: 24603,  Location: 00.15FR28NB/02.35TO606 (Lat: 38.968750,  Lng: -77.429317),  Route carried "under" structure: State highway 28,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 47,273 (year 2018),  Truck Traffic: 3%,  Features Intersected: SULLY ROAD SBL (RTE. 28),  Facility Carried by Structure: D. GREENWAY RAMP I
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.6m (179.1ft)

Find on map >>   Show street view

Structure Number: 24604,  Location: 03.00FR606/01.10TO657 (Lat: 38.962822,  Lng: -77.424325),  Route carried "under" structure: Other road ,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 11,500 (year 1996),  Truck Traffic: 3%,  Features Intersected: EBL 267 CD; RAMP B; DAAR,  Facility Carried by Structure: DULLES GREENWAY EB
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 71.9m (235.9ft)

Find on map >>   Show street view

Structure Number: 24604,  Location: 03.00FR606/01.10TO657 (Lat: 38.962822,  Lng: -77.424325),  Route carried "under" structure: Other road ,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 1994),  Truck Traffic: 2%,  Features Intersected: EBL 267 CD; RAMP B; DAAR,  Facility Carried by Structure: DULLES GREENWAY EB
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 71.9m (235.9ft)

Find on map >>   Show street view

Structure Number: 24604,  Location: 03.00FR606/01.10TO657 (Lat: 38.962822,  Lng: -77.424325),  Route carried "under" structure: Other road 267,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 11,500 (year 1996),  Truck Traffic: 3%,  Features Intersected: EBL 267 CD; RAMP B; DAAR,  Facility Carried by Structure: DULLES GREENWAY EB
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 71.9m (235.9ft)

Find on map >>   Show street view

Structure Number: 28572,  Location: 00.40FR605/00.02TO28 (Lat: 38.948306,  Lng: -77.429972),  Route carried "under" structure: State highway 28,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2010),  Truck Traffic: 1%,  Features Intersected: RTE.28 SULLY RD.,  Facility Carried by Structure: FRYING PAN RD.
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 28572,  Location: 00.40FR605/00.02TO28 (Lat: 38.948306,  Lng: -77.429972),  Route carried "under" structure: State highway 28,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2010),  Truck Traffic: 1%,  Features Intersected: RTE.28 SULLY RD.,  Facility Carried by Structure: FRYING PAN RD.
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Discuss McNair, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.