Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mobile, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 342Number of bridges
  • 17,884ft / 5,451mTotal length
  • $2,276,753,000Total costs
  • 5,331,403Total average daily traffic
  • 449,063Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mobile
  • No street view available for this location

New bridges in Mobile, AL - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 131930-1939
  • 21940-1949
  • 181950-1959
  • 941960-1969
  • 701970-1979
  • 361980-1989
  • 731990-1999
  • 192000-2009
  • 102010-2019
  • 22020-2022
Reconstructed bridges in Mobile, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 51970-1979
  • 231980-1989
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Mobile, AL
Average Bridge Truck Traffic in Mobile, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.8%Excellent
  • 4.2%Very good
  • 13.4%Good
  • 47.9%Satisfactory
  • 31.9%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.2%Very good
  • 20.2%Good
  • 31.9%Satisfactory
  • 36.1%Fair
  • 1.7%Poor
  • 0.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Very good
  • 23.5%Good
  • 34.5%Satisfactory
  • 32.8%Fair
  • 2.5%Poor
  • 1.7%Serious
  • 0.8%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.6%Very good
  • 39.2%Good
  • 39.2%Satisfactory
  • 9.0%Fair
  • 1.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 13.8%Good
  • 50.9%Satisfactory
  • 35.3%Fair
Find on map >>   Show street view

Structure Number: 11161,  Location: 0.8 MI N HAMILTON BLVD (Lat: 30.561561,  Lng: -88.160808),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 334 (year 2021),  Truck Traffic: 50%,  Average Future Daily Traffic: 497 (year 2041),  Design Load: H 15,  Features Intersected: RABBIT CREEK,  Facility Carried by Structure: TODD ACRES DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.27m (20.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,161,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,277,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11259,  Location: 300' S STAPLES RD (Lat: 30.588533,  Lng: -88.102836),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 870 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,297 (year 2041),  Design Load: H 15,  Features Intersected: PERCH CREEK,  Facility Carried by Structure: ALBA CLUB RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $405,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11263,  Location: 0.2 MI N AIRPORT BLVD. (Lat: 30.678736,  Lng: -88.097794),  Route carried "on" structure: City street ,  Year Built: 1974,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,527 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,765 (year 2042),  Design Load: H 15,  Features Intersected: WOODCOCK BRANCH,  Facility Carried by Structure: MT. ISLAND DR E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $630,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11353,  Location: 3.3 MI N E US 43 (Lat: 30.903292,  Lng: -88.003047),  Route carried "on" structure: Interstate 65,  Year Built: 1975,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 24,693 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 37,039 (year 2038),  Design Load: HS 20,  Features Intersected: JIM BELL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,474,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $2,721,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11411,  Location: 0.2 MI E ALBA CLUB RD (Lat: 30.589136,  Lng: -88.099772),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,838 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,209 (year 2041),  Design Load: HS 20,  Features Intersected: PERCH CREEK,  Facility Carried by Structure: STAPLES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11432,  Location: 500' E EAST ROAD (Lat: 30.646081,  Lng: -88.167797),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 27,525 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 41,012 (year 2041),  Design Load: H 15,  Features Intersected: SPENCER BRANCH,  Facility Carried by Structure: COTTAGE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.499,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 84.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,249,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $2,474,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11461,  Location: 1102' E CODY ROAD (Lat: 30.661119,  Lng: -88.203608),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 24,331 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,253 (year 2041),  Design Load: H 15,  Features Intersected: MILKHOUSE CREEK,  Facility Carried by Structure: GRELOT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 86.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,211,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11462,  Location: 1729' E CODY ROAD (Lat: 30.661111,  Lng: -88.201806),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 24,331 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 35,711 (year 2041),  Design Load: H 15,  Features Intersected: MILKHOUSE CREEK,  Facility Carried by Structure: GRELOT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,310,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11473,  Location: 0.5 MI W I65 (Lat: 30.685619,  Lng: -88.132939),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 23,884 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,587 (year 2041),  Design Load: HS 20,  Features Intersected: MONTLIMAR CREEK,  Facility Carried by Structure: DAUPHIN ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,146,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,261,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1162,  Location: 150' E ALBA CLUB ROAD (Lat: 30.593958,  Lng: -88.098767),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,270 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,852 (year 2040),  Design Load: H 15,  Features Intersected: PERCH CREEK,  Facility Carried by Structure: BOYKIN BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $438,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11637,  Location: 300' E US 45 (Lat: 30.726628,  Lng: -88.092764),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 21 (year 2022),  Average Future Daily Traffic: 31 (year 2042),  Design Load: H 15,  Features Intersected: TOULMIN SPRINGS,  Facility Carried by Structure: GOLDEN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11684,  Location: 300' N BOYKIN BLVD. (Lat: 30.594528,  Lng: -88.099075),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,315 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,920 (year 2041),  Design Load: H 15,  Features Intersected: PERCH CREEK,  Facility Carried by Structure: ALBA CLUB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11691,  Location: 0.3 MI E ATHEY RD. (Lat: 30.705908,  Lng: -88.164897),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 15,287 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,778 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: ZIEGLER BLVD.
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 1.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 82.3m (270.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,170,000,  Roadway Improvement Cost: $217,000,  Total Project Cost: $2,387,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11692,  Location: 0.3 MI W FOREST DALE DR. (Lat: 30.711406,  Lng: -88.166986),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 15,757 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 23,478 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: ZIEGLER BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,050,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,155,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11702,  Location: 1.3 MI S HAMILTON BLVD (Lat: 30.531428,  Lng: -88.123478),  Route carried "on" structure: State highway 193,  Year Built: 1976,  Status: Open,  Structure Length: 48.22m (158.20ft),  Average Daily Traffic: 12,616 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,924 (year 2038),  Design Load: HS 20,  Features Intersected: THEODORE INDS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.970,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Navigation Control: Yes ( Vertical Clearance: 14.3m (46.9ft), Horizontal Clearance: 43.9m (144.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.22m (158.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $13,887,000,  Roadway Improvement Cost: $1,389,000,  Total Project Cost: $15,276,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11791,  Location: HIGHLAND WOODS SUBDIV. (Lat: 30.683756,  Lng: -88.185919),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 22 (year 2021),  Average Future Daily Traffic: 34 (year 2041),  Design Load: H 15,  Features Intersected: TWELVE MILE CREEK,  Facility Carried by Structure: BRANDY RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.369,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 64.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,469,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,616,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1182,  Location: 0.1 MI W I-65 (Lat: 30.708133,  Lng: -88.123933),  Route carried "on" structure: US 98,  Year Built: 1978,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 19,314 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,971 (year 2039),  Design Load: HS 20,  Features Intersected: THREE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.905,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $2,085,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $2,294,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11821,  Location: 0.1 MI W I-65 (Lat: 30.707911,  Lng: -88.124019),  Route carried "on" structure: US 98,  Year Built: 1978,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 19,314 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,971 (year 2039),  Design Load: HS 20,  Features Intersected: THREE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.905,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $2,085,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $2,294,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11827,  Location: 0.2 MI E KNOLLWOOD DR (Lat: 30.653775,  Lng: -88.175675),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,021 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,461 (year 2041),  Design Load: H 15,  Features Intersected: SPENCERS BRANCH,  Facility Carried by Structure: GREEN TREE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $417,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $459,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1183,  Location: 0.2 MI E SR 163 (Lat: 30.658528,  Lng: -88.087044),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,687 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,494 (year 2042),  Design Load: H 15,  Features Intersected: SALTWATER CREEK,  Facility Carried by Structure: HURTEL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $393,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11928,  Location: I10-US90 CHACALOOCHEE BAY (Lat: 30.679864,  Lng: -87.989011),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1978,  Status: Open,  Structure Length: 34.59m (113.48ft),  Average Daily Traffic: 2,851 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,277 (year 2039),  Design Load: HS 20,  Features Intersected: US 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.963,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Number Of Approach Spans: 12,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 34.59m (113.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $6,405,000,  Roadway Improvement Cost: $641,000,  Total Project Cost: $7,046,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1193,  Location: EAST TUNNEL INTERCHANGE (Lat: 30.692000,  Lng: -88.028917),  Route carried "on" structure: Interstate 10,  Year Built: 1978,  Status: Open,  Structure Length: 1210.76m (3972.31ft),  Average Daily Traffic: 32,882 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 49,323 (year 2040),  Design Load: HS 20,  Features Intersected: M. BAY,90,98,I10WB RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.365,  Lanes on structure: 2,  Lanes under structure: 24,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 14 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.3m (24.0ft), Horizontal Clearance: 30.8m (101.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 612,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1210.76m (3972.31ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $348,688,000,  Roadway Improvement Cost: $34,869,000,  Total Project Cost: $383,557,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11931,  Location: EAST TUNNEL INTERCHANGE (Lat: 30.691853,  Lng: -88.028883),  Route carried "on" structure: Interstate 10,  Year Built: 1978,  Status: Open,  Structure Length: 1210.91m (3972.80ft),  Average Daily Traffic: 32,882 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 49,323 (year 2040),  Design Load: HS 20,  Features Intersected: MOBILE BAY * US 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.365,  Lanes on structure: 2,  Lanes under structure: 30,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 14 degrees,  Navigation Control: Yes ( Vertical Clearance: 7.3m (24.0ft), Horizontal Clearance: 30.8m (101.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 610,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1210.91m (3972.80ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $348,732,000,  Roadway Improvement Cost: $34,873,000,  Total Project Cost: $383,605,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11986,  Location: 0.5 MI N COTTAGE HILL RD (Lat: 30.650331,  Lng: -88.173050),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,123 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,674 (year 2041),  Design Load: H 15,  Features Intersected: SPENCERS BRANCH,  Facility Carried by Structure: WILDWOOD PLACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $476,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12016,  Location: 800' S BURMA RD W. (Lat: 30.633156,  Lng: -88.157053),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 13,415 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,988 (year 2041),  Design Load: H 15,  Features Intersected: SPENCERS BRANCH,  Facility Carried by Structure: DEMETROPOLIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.599,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,697,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $1,867,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12017,  Location: 0.2 MI E LONGLEAF DR. (Lat: 30.637569,  Lng: -88.162258),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,778 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,650 (year 2041),  Design Load: H 15,  Features Intersected: SPENCERS BRANCH,  Facility Carried by Structure: BURMA RD. WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $501,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12027,  Location: 0.2 MI E KNOLLWOOD DR (Lat: 30.651389,  Lng: -88.174131),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,556 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,318 (year 2041),  Design Load: H 15,  Features Intersected: SPENCERS BRANCH,  Facility Carried by Structure: VISTA BONITA DR.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $446,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12401,  Location: 3000' N MICHAEL BLVD (Lat: 30.670686,  Lng: -88.133450),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 11,403 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,990 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH (NO NAME),  Facility Carried by Structure: MONTLIMAR DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.369,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 70.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $917,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12522,  Location: 1.6 MI S OF COUNTY RD 70 (Lat: 30.687228,  Lng: -88.293097),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,565 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,297 (year 2040),  Design Load: H 20,  Features Intersected: PIERCE CREEK,  Facility Carried by Structure: ELIZA JORDAN RD S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.299,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 63.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $589,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12523,  Location: 1.7 MI E US 90 (Lat: 30.554667,  Lng: -88.143397),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 6,827 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,172 (year 2041),  Design Load: HS 20,  Features Intersected: WHISKEY BRANCH,  Facility Carried by Structure: HAMILTON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.699,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $552,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12524,  Location: 0.7 MI E JCT HWY 90 (Lat: 30.554697,  Lng: -88.160214),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 8,558 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,751 (year 2041),  Design Load: HS 20,  Features Intersected: RABBIT CREEK,  Facility Carried by Structure: HAMILTON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $416,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12526,  Location: 0.9 MI N JEFF HAMILTON RD (Lat: 30.647603,  Lng: -88.283706),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 2,257 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,354 (year 2040),  Design Load: HS 20,  Features Intersected: MILLER CREEK,  Facility Carried by Structure: REPOLL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $737,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $811,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12527,  Location: 1.2 MI N CO RD 70 (Lat: 30.725150,  Lng: -88.276178),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 7,550 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,219 (year 2040),  Design Load: HS 20,  Features Intersected: HAMILTON CREEK,  Facility Carried by Structure: SNOW ROAD N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.199,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $1,322,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,454,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12588,  Location: 0.26MI. W. NAVCO ROAD (Lat: 30.644717,  Lng: -88.107444),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 178 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 358 (year 2042),  Design Load: HS 20,  Features Intersected: FLEETWOOD DRAINAGE,  Facility Carried by Structure: MCLAUGHLIN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $701,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $771,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12609,  Location: 1140' N AIRPORT BLVD (Lat: 30.679656,  Lng: -88.092725),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 893 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,331 (year 2042),  Design Load: HS 15,  Features Intersected: WOODCOCK BRANCH,  Facility Carried by Structure: CRENSHAW STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.789,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,261,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,387,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12674,  Location: 2.3 MI E I-65 (Lat: 30.672883,  Lng: -88.098217),  Route carried "on" structure: US 90,  Year Built: 1952,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 18,267 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 27,400 (year 2039),  Design Load: H 15,  Features Intersected: WOODCOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.630,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.5m (67.3ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.27m (7.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $8,390,000,  Roadway Improvement Cost: $839,000,  Total Project Cost: $9,229,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12679,  Location: 0.3 MI S US 90 (Lat: 30.670167,  Lng: -88.097039),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 954 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,421 (year 2042),  Design Load: HS 20,  Features Intersected: ESLAVA CREEK,  Facility Carried by Structure: PINE HILL DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,329,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,462,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12684,  Location: 1.7 MI E I65 (Lat: 30.676419,  Lng: -88.098456),  Route carried "on" structure: City street ,  Year Built: 1961,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 18,533 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 27,614 (year 2042),  Design Load: H 15,  Features Intersected: WOODCOCK BRANCH,  Facility Carried by Structure: AIRPORT BLVD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 6.700,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $858,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $944,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12691,  Location: 0.4 MI E MCVAY DR (Lat: 30.651486,  Lng: -88.106150),  Route carried "on" structure: City street ,  Year Built: 1975,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 6,661 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,925 (year 2042),  Design Load: H 15,  Features Intersected: BOLTON BRANCH,  Facility Carried by Structure: HALLS MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $597,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $657,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12822,  Location: 1080' N AIRPORT BLVD (Lat: 30.679419,  Lng: -88.095806),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 893 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,331 (year 2042),  Design Load: HS 15,  Features Intersected: WOODCOCK BRANCH,  Facility Carried by Structure: MORGAN AVE
Minimum Vertical Clearance: 8.23m (27.00ft),  Kilometerpoint: 0.620,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $466,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12823,  Location: 1085' N AIRPORT BLVD (Lat: 30.679450,  Lng: -88.093831),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,210 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,803 (year 2042),  Design Load: HS 15,  Features Intersected: WOODCOCK BRANCH,  Facility Carried by Structure: WESTWOOD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.679,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $572,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Discuss Mobile, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.