Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Monroeville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 68Number of bridges
  • 640ft / 195mTotal length
  • $23,388,000Total costs
  • 1,452,080Total average daily traffic
  • 136,581Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Monroeville
  • No street view available for this location

New bridges in Monroeville, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 41940-1949
  • 241950-1959
  • 161960-1969
  • 31970-1979
  • 41980-1989
  • 61990-1999
  • 52000-2009
  • 32010-2019
Reconstructed bridges in Monroeville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 31970-1979
  • 101980-1989
  • 01990-1999
  • 42000-2009
  • 42010-2019
Average Bridge Daily Traffic in Monroeville, PA
Average Bridge Truck Traffic in Monroeville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.5%Very good
  • 38.7%Good
  • 35.5%Satisfactory
  • 3.2%Fair
  • 12.9%Poor
  • 3.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.5%Very good
  • 29.0%Good
  • 32.3%Satisfactory
  • 25.8%Fair
  • 3.2%Serious
  • 3.2%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.5%Very good
  • 32.3%Good
  • 35.5%Satisfactory
  • 22.6%Fair
  • 3.2%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Good
  • 31.8%Satisfactory
  • 31.8%Fair
  • 18.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 46974,  Location: NEAR TURNPIKE INT. (Lat: 40.438889,  Lng: -79.758139),  Route carried "on" structure: Interstate 376,  Year Built: 2011,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 48,654 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 50,000 (year 2037),  Design Load: HL 93,  Features Intersected: BUSINESS RT. 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.021,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 44.8m (147.0ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 49126,  Location: 200' S Old Frankstown Rd. (Lat: 40.445425,  Lng: -79.714467),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 250 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2037),  Design Load: HS 20,  Features Intersected: Pierson Run,  Facility Carried by Structure: Old Abers Creek Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 1099,  Location: OVER SR 0022 (Lat: 40.425000,  Lng: -79.733333),  Route carried "under" structure: US 22,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 14,002 (year 2020),  Truck Traffic: 12%,  Features Intersected: SR 0022,  Facility Carried by Structure: GOLDEN MILE HW
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 14.668,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 1099,  Location: OVER SR 0022 (Lat: 40.425000,  Lng: -79.733333),  Route carried "under" structure: US 22,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 15,231 (year 2020),  Truck Traffic: 11%,  Features Intersected: SR 0022,  Facility Carried by Structure: GOLDEN MILE HW
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 14.693,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 1204,  Location: 2.5 MI W OF PA TURNPIKE (Lat: 40.441964,  Lng: -79.797381),  Route carried "under" structure: State highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,977 (year 2022),  Truck Traffic: 2%,  Features Intersected: UNION RR,THOMPSON RUN,  Facility Carried by Structure: I-376
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.016,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: 1206,  Location: I376 O/OLD WM.PENN HWY. (Lat: 40.443892,  Lng: -79.778117),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1996),  Truck Traffic: 1%,  Features Intersected: OLD WM PENN HWY,LEAK RUN,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 1207,  Location: GARDEN CITY DR.O/I376 (Lat: 40.444725,  Lng: -79.773164),  Route carried "under" structure: Interstate 376,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 43,646 (year 2022),  Truck Traffic: 8%,  Features Intersected: OVER 376 EB WB,  Facility Carried by Structure: GARDEN CITY DR
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 54.343,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1207,  Location: GARDEN CITY DR.O/I376 (Lat: 40.444725,  Lng: -79.773164),  Route carried "under" structure: Interstate 376,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 48,654 (year 2022),  Truck Traffic: 8%,  Features Intersected: OVER 376 EB WB,  Facility Carried by Structure: GARDEN CITY DR
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 54.412,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1208,  Location: OVER OLD WM.PENN HIGHWAY (Lat: 40.444306,  Lng: -79.767939),  Route carried "under" structure: County highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2005),  Truck Traffic: 3%,  Features Intersected: OLD WILLIAM PENN HIGHWAY,  Facility Carried by Structure: PARKWAY EAST HW
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 1212,  Location: I 376 E.B.OVER SR 2057 (Lat: 40.440525,  Lng: -79.760494),  Route carried "under" structure: State highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 13,248 (year 2020),  Truck Traffic: 6%,  Features Intersected: HAYMAKER ROAD,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 1212,  Location: I 376 E.B.OVER SR 2057 (Lat: 40.440525,  Lng: -79.760494),  Route carried "under" structure: State highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 11,730 (year 2020),  Truck Traffic: 8%,  Features Intersected: HAYMAKER ROAD,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 1216,  Location: I 376 W.B.OVER SR 2057 (Lat: 40.440914,  Lng: -79.760481),  Route carried "under" structure: State highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 11,730 (year 2020),  Truck Traffic: 8%,  Features Intersected: HAYMAKER ROAD,  Facility Carried by Structure: PARKWAY WEST
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 1216,  Location: I 376 W.B.OVER SR 2057 (Lat: 40.440914,  Lng: -79.760481),  Route carried "under" structure: State highway ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 13,248 (year 2020),  Truck Traffic: 6%,  Features Intersected: HAYMAKER ROAD,  Facility Carried by Structure: PARKWAY WEST
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 1575,  Location: HALL STATION BRIDGE (Lat: 40.430917,  Lng: -79.804633),  Route carried "under" structure: State highway ,  Year Built: 1942,  Structure Length: 0. m,  Average Daily Traffic: 778 (year 2022),  Truck Traffic: 3%,  Features Intersected: LR 744,UNION RR,THOMPSON,  Facility Carried by Structure: WIlliam Penn Hwy
Minimum Vertical Clearance: 16.00m (52.49ft),  Kilometerpoint: 3.819,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 121.9m (399.9ft)

Find on map >>   Show street view

Structure Number: 2099,  Location: NEAR BOYCE PARK (Lat: 40.455000,  Lng: -79.755000),  Route carried "under" structure: Interstate 76,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 38,689 (year 2004),  Truck Traffic: 17%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: MONROEVILLE ROAD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 21,  Location: NEAR CCAC BOYCE CAMPUS (Lat: 40.451906,  Lng: -79.754253),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Features Intersected: BEATTY ROAD,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 2101,  Location: WEST OF PITTSBURGH INTG (Lat: 40.438333,  Lng: -79.751667),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 0000),  Features Intersected: T-911,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 4.38m (14.37ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.2m (26.9ft)

Find on map >>   Show street view

Structure Number: 2102,  Location: TURNPK RMP.EH O/ SR2048 (Lat: 40.436667,  Lng: -79.755000),  Route carried "under" structure: Business US 22B,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 16,890 (year 2022),  Truck Traffic: 5%,  Features Intersected: SR2048 & I-376RP,  Facility Carried by Structure: RAMP E&H
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 7.530,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 2102,  Location: TURNPK RMP.EH O/ SR2048 (Lat: 40.436667,  Lng: -79.755000),  Route carried "under" structure: Business US 22B,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 15,934 (year 2022),  Truck Traffic: 5%,  Features Intersected: SR2048 & I-376RP,  Facility Carried by Structure: RAMP E&H
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 7.339,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 2104,  Location: WEST OF PITTSBURGH INTG (Lat: 40.438533,  Lng: -79.750753),  Route carried "under" structure: Interstate 376,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 48,654 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 0022, LR187,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.826,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 2104,  Location: WEST OF PITTSBURGH INTG (Lat: 40.438533,  Lng: -79.750753),  Route carried "under" structure: US 22,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 26,807 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 0022, LR187,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 6.52m (21.39ft),  Kilometerpoint: 11.771,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 2104,  Location: WEST OF PITTSBURGH INTG (Lat: 40.438533,  Lng: -79.750753),  Route carried "under" structure: US 22,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 26,459 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 0022, LR187,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 11.771,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 2105,  Location: PITTSBURGH INTERCHANGE (Lat: 40.360000,  Lng: -79.831667),  Route carried "under" structure: Interstate 76,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 38,689 (year 2004),  Truck Traffic: 17%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: PA TPK RAMPS B&C
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 2106,  Location: NEAR PITTSBURGH INTERCHG (Lat: 40.434306,  Lng: -79.748142),  Route carried "under" structure: Interstate 76,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 38,689 (year 2004),  Truck Traffic: 17%,  Features Intersected: PA TPK (I-76)
Minimum Vertical Clearance: 4.56m (14.96ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 2108,  Location: NEAR ALLEGH-WESTMLD CO LN (Lat: 40.741667,  Lng: -79.730000),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Features Intersected: T-423, Abers Creek Road,  Facility Carried by Structure: PA TPK (I-76)
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 6.1m (20.0ft)

Find on map >>   Show street view

Structure Number: 2896,  Location: MONROEVILLE MALL OVERPASS (Lat: 40.433378,  Lng: -79.794264),  Route carried "under" structure: Business US 22B,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 13,204 (year 2022),  Truck Traffic: 1%,  Features Intersected: BUSINESS 22,  Facility Carried by Structure: MALL ENTRANCE
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 3.957,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 2896,  Location: MONROEVILLE MALL OVERPASS (Lat: 40.433378,  Lng: -79.794264),  Route carried "under" structure: Business US 22B,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 18,535 (year 2021),  Truck Traffic: 3%,  Features Intersected: BUSINESS 22,  Facility Carried by Structure: MALL ENTRANCE
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 3.816,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 44347,  Location: 150'N.OF MONROEVILLE BLVD (Lat: 40.437056,  Lng: -79.779983),  Route carried "under" structure: Business US 22B,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 13,204 (year 2022),  Truck Traffic: 1%,  Features Intersected: SR 2048 (BUSINESS RT. 22,  Facility Carried by Structure: OLD NORTHERN PIKE
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 5.403,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 44347,  Location: 150'N.OF MONROEVILLE BLVD (Lat: 40.437056,  Lng: -79.779983),  Route carried "under" structure: Business US 22B,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 11,805 (year 2022),  Truck Traffic: 1%,  Features Intersected: SR 2048 (BUSINESS RT. 22,  Facility Carried by Structure: OLD NORTHERN PIKE
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 5.256,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 46974,  Location: NEAR TURNPIKE INT. (Lat: 40.438889,  Lng: -79.758139),  Route carried "under" structure: US 22B,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 16,890 (year 2022),  Truck Traffic: 5%,  Features Intersected: BUSINESS RT. 22,  Facility Carried by Structure: INTERSTATE 376
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 7.067,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Find on map >>   Show street view

Structure Number: 46974,  Location: NEAR TURNPIKE INT. (Lat: 40.438889,  Lng: -79.758139),  Route carried "under" structure: US 22B,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 15,934 (year 2022),  Truck Traffic: 5%,  Features Intersected: BUSINESS RT. 22,  Facility Carried by Structure: INTERSTATE 376
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 6.925,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.8m (147.0ft)

Discuss Monroeville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.