Bridge Statistics for Monterey Park, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 78Number of bridges
  • 794ft / 242mTotal length
  • 5,004,911Total average daily traffic
  • 301,135Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Monterey Park
  • No street view available for this location

New bridges in Monterey Park, CA - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 21950-1959
  • 471960-1969
  • 251970-1979
Reconstructed bridges in Monterey Park, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 01970-1979
  • 01980-1989
  • 51990-1999
Average Bridge Daily Traffic in Monterey Park, CA
Average Bridge Truck Traffic in Monterey Park, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 64.3%Good
  • 7.1%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 82.1%Good
  • 3.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 89.3%Good
  • 3.6%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 83.3%Very good
  • 16.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 53 1447G,  Location: 07-LA-710-T31.40-MONP (Lat: 34.059472,  Lng: -118.165011),  Route carried "under" structure: State highway 710,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: I 710, I 10,CONNS,RAMONA
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 31.400,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 53 1447G,  Location: 07-LA-710-T31.40-MONP (Lat: 34.059472,  Lng: -118.165011),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: I 710, I 10,CONNS,RAMONA
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 21.480,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 53 1459G,  Location: 07-LA-010-21.33-MONP (Lat: 34.060069,  Lng: -118.165831),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 11,200 (year 2005),  Truck Traffic: 10%,  Features Intersected: RAMONA BLVD,  Facility Carried by Structure: E10-S710 CONNECTOR
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 53 1459L,  Location: 07-LA-710-26.38-MONP (Lat: 34.059522,  Lng: -118.165486),  Route carried "under" structure: City street L360,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 12,800 (year 2010),  Truck Traffic: 10%,  Features Intersected: RAMONA BLVD,  Facility Carried by Structure: ROUTE 710 SB
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 1459R,  Location: 07-LA-710-26.38-MONP (Lat: 34.059469,  Lng: -118.165244),  Route carried "under" structure: City street L360,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 12,800 (year 2010),  Truck Traffic: 10%,  Features Intersected: RAMONA BLVD,  Facility Carried by Structure: ROUTE 710 NB
Minimum Vertical Clearance: 6.60m (21.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 1489,  Location: 07-LA-710-R26.59-MONP (Lat: 34.062522,  Lng: -118.164658),  Route carried "under" structure: State highway 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 45,500 (year 2017),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: BNSF, SCRRA METRO
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 26.590,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 1489,  Location: 07-LA-710-R26.59-MONP (Lat: 34.062522,  Lng: -118.164658),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 400 (year 2009),  Truck Traffic: 1%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: BNSF, SCRRA METRO
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 26.590,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 1697,  Location: 07-LA-060-R4.43-MONP (Lat: 34.035200,  Lng: -118.150439),  Route carried "under" structure: City street L062,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 41,746 (year 2019),  Truck Traffic: 2%,  Features Intersected: ATLANTIC BLVD,  Facility Carried by Structure: STATE ROUTE 60
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 53 1699,  Location: 07-LA-060-R4.68-MONP (Lat: 34.033522,  Lng: -118.147047),  Route carried "under" structure: County highway L700,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 5,448 (year 2019),  Truck Traffic: 2%,  Features Intersected: POMONA BLVD,  Facility Carried by Structure: STATE ROUTE 60
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 53 1702,  Location: 07-LA-710-R26.59-MONP (Lat: 34.062625,  Lng: -118.166028),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2009),  Truck Traffic: 5%,  Features Intersected: S710-W10 CONNECTOR RAMP,  Facility Carried by Structure: BNSF, SCRRA METRO
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 26.590,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 53 1729,  Location: 07-LA-060-R4.08-MONP (Lat: 34.036394,  Lng: -118.156033),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 5,800 (year 2019),  Truck Traffic: 2%,  Features Intersected: WOODS AVENUE,  Facility Carried by Structure: STATE ROUTE 60
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 53 1774,  Location: 07-LA-060-R6.86-MONP (Lat: 34.034344,  Lng: -118.108617),  Route carried "under" structure: State highway 60,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 232,000 (year 2019),  Truck Traffic: 20%,  Features Intersected: STATE ROUTE 60,  Facility Carried by Structure: GREENWOOD AVE
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 6.860,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 53 2054,  Location: 07-LA-010-21.00-MONP (Lat: 34.061017,  Lng: -118.170861),  Route carried "under" structure: Interstate 10,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 96,000 (year 2009),  Truck Traffic: 3%,  Features Intersected: I 10,CONN,RMPS,METRO,BUS,  Facility Carried by Structure: CAMPUS ROAD
Minimum Vertical Clearance: 7.29m (23.92ft),  Kilometerpoint: 21.000,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 53 2054,  Location: 07-LA-010-21.00-MONP (Lat: 34.061017,  Lng: -118.170861),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 4,300 (year 2005),  Truck Traffic: 2%,  Features Intersected: I 10,CONN,RMPS,METRO,BUS,  Facility Carried by Structure: CAMPUS ROAD
Minimum Vertical Clearance: 6.43m (21.10ft),  Kilometerpoint: 21.040,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 53 2054,  Location: 07-LA-010-21.00-MONP (Lat: 34.061017,  Lng: -118.170861),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 28,600 (year 2005),  Truck Traffic: 5%,  Features Intersected: I 10,CONN,RMPS,METRO,BUS,  Facility Carried by Structure: CAMPUS ROAD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 21.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 53 2054,  Location: 07-LA-010-21.00-MONP (Lat: 34.061017,  Lng: -118.170861),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 23,800 (year 2005),  Truck Traffic: 5%,  Features Intersected: I 10,CONN,RMPS,METRO,BUS,  Facility Carried by Structure: CAMPUS ROAD
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 26.460,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 53 2054,  Location: 07-LA-010-21.00-MONP (Lat: 34.061017,  Lng: -118.170861),  Route carried "under" structure: Interstate 10,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,800 (year 2005),  Truck Traffic: 1%,  Features Intersected: I 10,CONN,RMPS,METRO,BUS,  Facility Carried by Structure: CAMPUS ROAD
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 20.000,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 53 2054,  Location: 07-LA-010-21.00-MONP (Lat: 34.061017,  Lng: -118.170861),  Route carried "under" structure: Interstate 10,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,800 (year 2005),  Truck Traffic: 1%,  Features Intersected: I 10,CONN,RMPS,METRO,BUS,  Facility Carried by Structure: CAMPUS ROAD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 20.000,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 53 2505L,  Location: 07-LA-010S-21.35-MONP (Lat: 34.062631,  Lng: -118.166044),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 4,050 (year 2012),  Truck Traffic: 3%,  Features Intersected: I 710 & S710-W10 CONN,  Facility Carried by Structure: W10 BUSWAY
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 26.600,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 2505L,  Location: 07-LA-010S-21.35-MONP (Lat: 34.062631,  Lng: -118.166044),  Route carried "under" structure: Interstate 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 249,000 (year 2012),  Truck Traffic: 5%,  Features Intersected: I 710 & S710-W10 CONN,  Facility Carried by Structure: W10 BUSWAY
Minimum Vertical Clearance: 6.80m (22.31ft),  Kilometerpoint: 26.600,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 2505L,  Location: 07-LA-010S-21.35-MONP (Lat: 34.062631,  Lng: -118.166044),  Route carried "under" structure: Interstate 10,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: I 710 & S710-W10 CONN
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 21.300,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 2538R,  Location: 07-LA-010S-21.36-MONP (Lat: 34.062467,  Lng: -118.166094),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: S710-W10 CONNECTOR
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 21.360,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 53 2543R,  Location: 07-LA-010S-21.40-MONP (Lat: 34.062464,  Lng: -118.165383),  Route carried "under" structure: Interstate 710,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2011),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 710,  Facility Carried by Structure: E10 BUSWAY
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 31.600,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 53 2543R,  Location: 07-LA-010S-21.40-MONP (Lat: 34.062464,  Lng: -118.165383),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2011),  Features Intersected: INTERSTATE 710
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 21.400,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 53C0142,  Location: 0.8MI W/O ATLANTIC BLVD (Lat: 34.059858,  Lng: -118.145178),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 27,360 (year 2012),  Truck Traffic: 2%,  Features Intersected: FREMONT AVE,  Facility Carried by Structure: GARVEY AVE
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 53C0143,  Location: 0.7MI W/O ATLANTIC BLVD (Lat: 34.060156,  Lng: -118.143581),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 27,360 (year 2012),  Truck Traffic: 2%,  Features Intersected: MONTEREY PASS RD,  Facility Carried by Structure: GARVEY AVE
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.4m (60.4ft)

Discuss Monterey Park, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.