Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Moorestown-Lenola, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 50Number of bridges
  • 420ft / 128mTotal length
  • $16,390,000Total costs
  • 1,856,212Total average daily traffic
  • 153,268Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Moorestown-Lenola
  • No street view available for this location

New bridges in Moorestown-Lenola, NJ - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11910-1919
  • 41930-1939
  • 21940-1949
  • 111950-1959
  • 91960-1969
  • 151970-1979
  • 41980-1989
  • 22000-2009
Reconstructed bridges in Moorestown-Lenola, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 31950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Moorestown-Lenola, NJ
Average Bridge Truck Traffic in Moorestown-Lenola, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 36.7%Good
  • 46.7%Satisfactory
  • 13.3%Fair
  • 3.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Very good
  • 32.4%Good
  • 35.3%Satisfactory
  • 17.6%Fair
  • 8.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.9%Very good
  • 23.5%Good
  • 52.9%Satisfactory
  • 14.7%Fair
  • 2.9%Poor
  • 2.9%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Very good
  • 35.0%Good
  • 30.0%Satisfactory
  • 25.0%Fair
  • 5.0%Poor
Find on map >>   Show street view

Structure Number: 327166,  Location: AT I-295 EXIT 43 (Lat: 39.992061,  Lng: -74.877939),  Route carried "under" structure: Interstate 295,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 139,601 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-295,  Facility Carried by Structure: CREEK ROAD
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 69.363,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 33015,  Location: 1.55 MILES E OF US RT 130 (Lat: 39.975739,  Lng: -75.011839),  Route carried "under" structure: State highway 73,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 28,850 (year 2021),  Truck Traffic: 4%,  Features Intersected: ROUTE NJ 73 SOUTHBOUND,  Facility Carried by Structure: ROUTE NJ 90 WB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 50.598,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: M0368,  Location: 2 MI NORTH OF EXIT 4 (Lat: 39.955306,  Lng: -74.922417),  Route carried "under" structure: Other road NJTPK,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 81,924 (year 2020),  Truck Traffic: 10%,  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: MOORSTWN-MT LAUREL
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 59.578,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: M03702A,  Location: 4 MI NORTH OF EXIT 4 (Lat: 39.957667,  Lng: -74.919472),  Route carried "under" structure: Other road NJTPK,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 81,924 (year 2020),  Truck Traffic: 10%,  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: NJ TPK U-TURN ROAD
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 59.578,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: M03868,  Location: 5 MI SOUTH EXIT 5 (Lat: 39.975511,  Lng: -74.898525),  Route carried "under" structure: County highway 537,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 17,766 (year 2020),  Truck Traffic: 4%,  Features Intersected: MARNE HIGHWAY & PCRR,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 20.600,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: M0389,  Location: 4.4 MI NORTH OF EXIT 4 (Lat: 39.977844,  Lng: -74.896097),  Route carried "under" structure: County highway 686,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 10,223 (year 2020),  Truck Traffic: 4%,  Features Intersected: HARTFORD ROAD,  Facility Carried by Structure: NJ TURNPIKE
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 6.518,  Lanes on structure: 6,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: M04034,  Location: 3.6 MI SOUTH OF EXIT 5 (Lat: 39.989917,  Lng: -74.873611),  Route carried "under" structure: Other road NJTPK,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 65,204 (year 2020),  Truck Traffic: 16%,  Features Intersected: NJ TURNPIKE,  Facility Carried by Structure: CREEK ROAD
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 65.114,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Discuss Moorestown-Lenola, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.