Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North East, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 60Number of bridges
  • 489ft / 149mTotal length
  • $5,191,000Total costs
  • 326,068Total average daily traffic
  • 93,275Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North East
  • No street view available for this location

New bridges in North East, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 41940-1949
  • 381950-1959
  • 21970-1979
  • 61980-1989
  • 11990-1999
  • 52000-2009
  • 22010-2019
Reconstructed bridges in North East, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 61970-1979
  • 21980-1989
  • 71990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in North East, PA
Average Bridge Truck Traffic in North East, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.0%Excellent
  • 9.1%Very good
  • 24.2%Good
  • 51.5%Satisfactory
  • 9.1%Fair
  • 3.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.1%Very good
  • 21.2%Good
  • 39.4%Satisfactory
  • 27.3%Fair
  • 6.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.0%Very good
  • 18.2%Good
  • 39.4%Satisfactory
  • 39.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.5%Very good
  • 36.8%Good
  • 10.5%Satisfactory
  • 26.3%Fair
  • 15.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Excellent
  • 25.0%Very good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 15868,  Location: GREENFIELD TOWNSHIP (Lat: 42.146556,  Lng: -79.842283),  Route carried "under" structure: Interstate 86,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 4,080 (year 2021),  Truck Traffic: 17%,  Features Intersected: OVER SR 86,EB/WB,SO TIER,  Facility Carried by Structure: SR 1106,NEW ROAD
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 3.220,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 16098,  Location: NORTH EAST TOWNSHIP (Lat: 42.187867,  Lng: -79.829875),  Route carried "under" structure: State highway 89,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,351 (year 2020),  Truck Traffic: 10%,  Features Intersected: OVER SR 89 N/SB,STATION,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 37.821,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 16098,  Location: NORTH EAST TOWNSHIP (Lat: 42.187867,  Lng: -79.829875),  Route carried "under" structure: State highway 89,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,351 (year 2020),  Truck Traffic: 10%,  Features Intersected: OVER SR 89 N/SB,STATION,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 37.821,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 16099,  Location: NORTH EAST TOWNSHIP (Lat: 42.188017,  Lng: -79.830156),  Route carried "under" structure: State highway 89,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,351 (year 2020),  Truck Traffic: 10%,  Features Intersected: OVER SR 89 N/SB,STATION,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 37.821,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16099,  Location: NORTH EAST TOWNSHIP (Lat: 42.188017,  Lng: -79.830156),  Route carried "under" structure: State highway 89,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,351 (year 2020),  Truck Traffic: 10%,  Features Intersected: OVER SR 89 N/SB,STATION,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 37.821,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16101,  Location: NORTH EAST TOWNSHIP (Lat: 42.201342,  Lng: -79.814444),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,539 (year 2021),  Truck Traffic: 42%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-743,SHADDUCK
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 66.826,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16101,  Location: NORTH EAST TOWNSHIP (Lat: 42.201342,  Lng: -79.814444),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 9,004 (year 2021),  Truck Traffic: 41%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-743,SHADDUCK
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 66.773,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 16103,  Location: NORTH EAST TOWNSHIP (Lat: 42.204522,  Lng: -79.810203),  Route carried "under" structure: Spur State highway 426,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 1,601 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER SR 426,FINDLY LK RD,  Facility Carried by Structure: SR 90,EB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 21.348,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 16104,  Location: NORTH EAST TOWNSHIP (Lat: 42.204675,  Lng: -79.810431),  Route carried "under" structure: Spur State highway 426,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 1,601 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER SR 426,FINDLY LK RD,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 21.348,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 16105,  Location: NORTH EAST TOWNSHIP (Lat: 42.215619,  Lng: -79.795903),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,539 (year 2021),  Truck Traffic: 42%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-760,REMINGTON
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 69.237,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 16105,  Location: NORTH EAST TOWNSHIP (Lat: 42.215619,  Lng: -79.795903),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 9,004 (year 2021),  Truck Traffic: 41%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-760,REMINGTON
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 69.165,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 16107,  Location: NORTH EAST TOWNSHIP (Lat: 42.223333,  Lng: -79.798333),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 9,004 (year 2021),  Truck Traffic: 41%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-780,BORT ROAD
Minimum Vertical Clearance: 4.35m (14.27ft),  Kilometerpoint: 70.771,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 16107,  Location: NORTH EAST TOWNSHIP (Lat: 42.223333,  Lng: -79.798333),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,539 (year 2021),  Truck Traffic: 42%,  Features Intersected: OVER SR 90,EB/WB,  Facility Carried by Structure: T-780,BORT ROAD
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 70.047,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 16113,  Location: NORTH EAST TOWNSHIP (Lat: 42.233083,  Lng: -79.780208),  Route carried "under" structure: US 20,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,219 (year 2022),  Truck Traffic: 6%,  Features Intersected: OVER SR 20 E/WB,E MAIN,  Facility Carried by Structure: SR 90,EB & RAMP
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 70.766,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 16113,  Location: NORTH EAST TOWNSHIP (Lat: 42.233083,  Lng: -79.780208),  Route carried "under" structure: US 20,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 1,969 (year 2022),  Truck Traffic: 13%,  Features Intersected: OVER SR 20 E/WB,E MAIN,  Facility Carried by Structure: SR 90,EB & RAMP
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 70.761,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 16115,  Location: NORTH EAST TOWNSHIP (Lat: 42.233311,  Lng: -79.780294),  Route carried "under" structure: US 20,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,219 (year 2022),  Truck Traffic: 6%,  Features Intersected: OVER SR 20 E/WB,E MAIN,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 70.766,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 16115,  Location: NORTH EAST TOWNSHIP (Lat: 42.233311,  Lng: -79.780294),  Route carried "under" structure: US 20,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 1,969 (year 2022),  Truck Traffic: 13%,  Features Intersected: OVER SR 20 E/WB,E MAIN,  Facility Carried by Structure: SR 90,WB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 70.761,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 16165,  Location: NORTH EAST BOROUGH (Lat: 42.209331,  Lng: -79.837233),  Route carried "under" structure: State highway 89,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 10,277 (year 2022),  Truck Traffic: 5%,  Features Intersected: OVER SR 89,LAKE ROAD,  Facility Carried by Structure: SR 426,GRAHAMVILLE
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 40.638,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 16219,  Location: GREENFIELD TOWNSHIP (Lat: 42.149833,  Lng: -79.863503),  Route carried "under" structure: Interstate 86,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,891 (year 2021),  Truck Traffic: 18%,  Features Intersected: OVER SR 86 EB & WB,  Facility Carried by Structure: SR 1013,WILLIAMS R
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 16219,  Location: GREENFIELD TOWNSHIP (Lat: 42.149833,  Lng: -79.863503),  Route carried "under" structure: Interstate 86,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 4,080 (year 2021),  Truck Traffic: 17%,  Features Intersected: OVER SR 86 EB & WB,  Facility Carried by Structure: SR 1013,WILLIAMS R
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 1.608,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 1622,  Location: NORTH EAST TOWNSHIP (Lat: 42.164928,  Lng: -79.863161),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 12,011 (year 2022),  Truck Traffic: 24%,  Features Intersected: OVER SR 0090 EB/WB,  Facility Carried by Structure: SR 1013,WILLIAMS R
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 61.187,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 1622,  Location: NORTH EAST TOWNSHIP (Lat: 42.164928,  Lng: -79.863161),  Route carried "under" structure: Interstate 90,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 11,829 (year 2022),  Truck Traffic: 25%,  Features Intersected: OVER SR 0090 EB/WB,  Facility Carried by Structure: SR 1013,WILLIAMS R
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 61.121,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Discuss North East, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.